MIXRITE ENGINEERING PVT. LTD.
22 New Apollo Estate , Mogra Lane , Andheri (E), Mumbaio 400069
Tel :- 91-22-32935534 * Fax : 91-22-28365726 * web :-
Email :
Enquiry Ref:
APPLICATION DATA SHEET
Customer Information
Date: Quote Request Date:
Company: _____
Address: ______
______
Contact Name/Title:
Phone: Fax: Email: _____
- What is the type of Industry that the client is in?
Fine & Intermediate Chemical Company OEM’s
Pharmaceutical Company Any other, please specify
______
- What is the application for which client need a vacuum pump? (need details)
Drying Distillation Reactor Service
Solvent recovery House Vacuum Any other, please specify
______
- What is/are the type of pump/pumps that is/are required by the client?
Oil sealed VP Steam Ejector, OTO Dry pump Any other, please specify
______
- What kind of pump/pumps client is using at present?
Make: ______Model: ______
Technology: oil sealed VP Steam Ejector, OTO Any other, please specify ______
- How will be the demand pattern for the requirement
Continuous steady Continuous fluctuating Occasional
- What is the time frame for the requirement?
Immediate Planned but to take time still in the planning stage
- Is the requirement for
New installation Capacity expansion New application in existing system
- Is there a chance for a similar business or more business from the client?
Yes No
- Choose among the options below what could be the nearest to the status of the project
Exploring feasibility Intends to implement but awaiting management approval
Committed to implement the project – might have already committed some investments.
- Which communication channel is more favourable to the customer for knowing the product
Seminars Magazines Personal Visits Email/mail Newspapers
Telephone calls any other, please specify
______
Process Gas Information
Chemical Name / Molecular Formula / Molecular wt. / Flow Rate (kg/hr)Type of Gases : inflammable: Yes No corrosive: Yes No
Vapour Pressure of the gases at process temperature: ______@____ deg. C
Boiling points: ______deg C @ ____mbar/Torr
Air Leakage (kg/hr or mbar/min):
Are Particulate Present: Yes No Size (micron):
Pumping Requirements
Required Pumping Speed (m3/hr):
Required Process Pressure (mbar, Torr, etc):
Type of Process: Continuous BatchCycle Time (hr):
Process Inlet Temperature (°C):
Process Volume (m3):
Evacuation Time (min):
Installation of Pump
Length of Inlet Pipe (m): Diameter of Inlet Pipe (mm):
Bend & joints: ______
Inlet Valve Installed: Yes No
Diameter of Exhaust Line (mm):
Max Exhaust Gas Pressure (mbarg):
Exhaust Gas Piped to: Roof Scrubber Incinerator Flare Other
Utility Requirements:
Electricity: Voltage (V): Frequency (Hz):
Cooling Water:Temperature (°C):Pressure (barg):
Nitrogen Pressure (barg):
Instrument Air (barg): ______
Electrical Data:
Area Classification:
IEC/CENELEC: Zone: ______Gas Group: ______Temp Class: ______
ORATEX 100a Internal Cat: Gas Group: ______Temp Class: ______
External Cat: Gas Group: ______Temp Class: ______
OR NEC 500: Division: Gas Group: ______Temp Class: ______
Preferred Motor Supplier: ______
Motor Certification Code, (e.g., Eexd IIA/IIBT4): ______
Electrical Control Classification: ______
Spot Voltage: ______±______
Required Noise Levels:
< 85 dB (A) < 82 dB (A)
Sound Enclosure: Yes No
Cost of Ownership:
Daily running time: ______hr/day. Working days in a year:______
Annual running time: ______hrs/year.
If customer is using LRVP:
LRP absorbed power: ______kW. Cost: ______Rs./kW hr
Total Exp./Year: Rs. ______
Seal water supply: ______l/min. Cost: ______Rs./m3
Water Treatment cost: ______Rs./m3
Annual service & routine maintenance: ______Rs./year
If customer is using steam Ejector:
Steam supply rate: ______kg/hr. Cost: ______Rs./kg
Total Exp./Year: Rs. ______
Condenser water supply: ______m3/hr. Cost: ______Rs./m3
Water Treatment cost: ______Rs./m3
Annual service & routine maintenance: ______Rs./year
If customer is using other pump:
Absorbed power: ______kW. Cost: ______Rs./kW hr
Total Exp./Year: Rs. ______
Oil Capacity: ______ltrs Cost: ______Rs./m3
Oil Treatment cost: ______Rs.
Annual service & routine maintenance: ______Rs./year
Process Description:
System Sketch:
Please submit PI&D or system sketch, if possible.
Page 1