Property Level Resilience Grant Scheme

Application Form

  1. Applicant Information

Name of Applicant:
Business Name (if applicable)
Address:
Postcode:
Telephone Number
Mobile:
e-mail:
Insurance company:
Loss Adjustment company (if known):
  1. Property Flooded

Address of property applying (if different from above), including postcode
Date property was initially flooded
  1. Do you know the cause of the flooding?

Overwhelmed river
Blocked drainage
Extreme rainfall
Surface runoff
Other (please specify)
  1. Please briefly describe the primary damage that was caused.

  1. Please provide a copy of Insurer/loss adjusters survey including recommendations for property level resistance/resilience

Note: as part of the repair process it is possible to request insurers to allocate funding that would be used to replace as existing and the resident can then contribute funds personally or through the Property Level Resilience Grant to specify a flood resilient/resistant product.
  1. Have you had a survey carried out? (Please attach your survey)
/ Yes/No
The guidance will help identify appropriate suppliers and resilience/ resistance measures for the nature of flooding in your area. Not all of the identified measures may be appropriate, and may make limited difference to protecting or minimising the damage to your premises. We therefore require applications to be supported with the recommendations of a competent surveyor.
We strongly advise applicants to consider information available on reference websites such as For information , Crocodile Flood Solutions, who have previously supplied Northumberland County Council with similar measures, are offering a free survey and quote, and can be contacted on 08450 941 281 or at
The Council does not endorse Crocodile Solutions and applicants should make their own decision on which survey company to use.
  1. Is your grant application for;

Resilience/ resistance measures that you will install in the future should your grant be approved? / Yes/ No
For resilience/ resistance measures that you have already purchased and installed following the flooding (retrospective application). / Yes/ No
Below is a list of recognised measures. Please indicate which of the available resilience/ resistance measures you intend to or have installed (if a retrospective application), and cost (including VAT).
Please note that the maximum grant that can be applied for is £5,000 (including VAT costs). Any costs incurred above £5,000 will need to be met from your own funds.
Resistance Measures / Cost £s / Resilience Measures / Cost £s
Demountable Door Guards / Replace sand-cement screeds on solid concrete slabs (with dense screed)
Demountable Window Guards / Replace chipboard flooring with treated timber floorboards
Airbrick Cover / Replace floor including joists with treated timber to make water resilient
Sewage Bung / Replace timber floor with solid concrete
Toilet Pan Seal / Raise floor above most likely flood level
Sump Pump / Replace mineral insulation within walls with closed cell insulation
Re-pointing external walls with water resistant mortar / Replace gypsum plaster with water resistant material, such as lime
Waterproof external walls / Install chemical damp-proof course below joist level
Automatic Door Guards / Replace doors, windows, frames with water-resistant alternatives
Permanent flood door / Sceptic tank resistance or resilience measures (such as isolation valves, venting above flood level etc)
Automatic Window Guards / Mount boilers on wall
Self-closing airbrick / Move washing machine to first floor
Non-return valves 110 mm soil waste pipe / Replace ovens with raised, build-under type
NRV 40 mm utility waste pipe / Move electrics well above likely flood level
NRV 12 mm overflow pipe / Move service meters well above likely flood level
Garage/ Driveway Barrier / Replace chipboard kitchen/ bathroom units with plastic units
Professional advice on flood resistance/ resilience / Flood Risk Report
Other (please state):
Survey cost / £
Total Cost of Resilience/ Resistance Measures implementing / £
Total Amount of Grant Applying For if different (maximum £5,000 including VAT) / £
  1. Can you please briefly explain how you have identified the proposed costs for the resilience and/or resistance measures you are applying for (identified in Question 7), and any steps you have taken to ensure you are receiving value for money? For example, obtaining 3 quotes where individual measures are more than £1000 per item.

  1. FOR RETROSPECTIVE APPLICATIONS ONLY – If you are applying for works that have already been undertaken, please briefly describe how you ensured value for money.

  1. Have you received any alternative funding (such as previous grant funding or insurance claim payment) for any of the equipment you are applying for grant funding for?
/ Yes/ No
If yes, please specify and state why also seeking Property Level Resilience Grant support.
  1. FOR APPLICATIONS BUSINESS PREMISES ONLY – Have you received any other public grant funding during the last three years? If so please specify what for and the amount received. (Please see eligibility criteria set out in the attached guidance)

PROPERTY LEVEL RESILIENCE GRANT SCHEME

PARTICIPATION AGREEMENT

(1)[Northumberland County Council] (“the Council”)

(2)[] of [] (“the Property Owner”)

You have applied for grant funding through the Repair and Renew Grant Scheme to fit resilience and/ or resistance measures to your property. The following sets out the terms by which the grant offer is made, if your application is successful.

The Councilagrees to do the following:

  1. To provide £…………….... (please enter amount of grant sought through the Repair and Renew Grant Scheme) towards the cost of supplying and fitting (inclusive of VAT) the resilience and/ or resistance measures that you identified in your attached application, and the Council subsequently approved (if different). The measures that you have chosen to fit to your property have been selected by you entirely at your own risk. Should your property flood again in the future, The Council maintains no liability for the selection or installation of the measures you have chosen.

The Property Owner agrees to do the following:

  1. To procure the necessary equipment and installation of the approved resilience and/ or resistance measures in line with your grant funding approval. Should you choose to fit resilience and/ or resistance measures in excess of £5,000 (inclusive of VAT), then any additional costs must be met from alternative resources. Unless explicitly approved by the Council in advance, the applicant should choose the cheapest available quote for the proposed works, or make up the difference in cost from their own funds.
  2. To store the Measures securely and protect them from damage.
  3. To maintain the Measures in accordance with the manufacturers’ instructions.
  4. To sign up to the Environment Agency’s Flood Warning Scheme.
  5. To deploy the Measures in accordance with the manufacturers’ instructions.
  6. To allow the Council or agent access to the Property at all reasonable times for the purposes of inspection of the Measures.
  7. If the property is sold in the future, the measures should remain with the property in the flood risk area (passed to the new owner).
  8. To note that should it be found that you have not used the grant funds to purchase and install the measures identified and approved in your application, or that upon inspection the measures are not found to be in place/ available on site, or in an adequate state of maintenance, you risk prosecution, and the recovery of all grant payments.
  9. The approved resilience and/ or resistance measures should be purchased and installed, and all grant funds claimed (in accordance with the Councils defined processes) by 31stDecember 2016. Failure to meet this date may mean that the grant funds are no longer available to you, and any costs incurred cannot be recovered.
  10. To note that the details of your name and address, the resilience and/or resistance measures applied for/ approved, and the outcome of any inspection visit will be shared with the Department for Environment Food and Rural Affairs (Defra). The Council and Defra will not (for any reason) share any of the information you have submitted with a third party.
  11. To note that the Council or Defra may contact you in the future for the purposes of research, to identify if the Repair and Renew Grant and the measures you selected have been of benefit to you, to inform any future flood response schemes.

What is not covered by thisAgreement

The Council shall not be liable to the Property Owner or any tenant or occupier for any action, claim, demand, cost or expense incurred in respect of any loss or damage, including for any negligence, breach of contract, property damage or personal injury (including death) including any consequential or indirect loss, which arises out of or in connection with the installation or use of the resilience and/ or resistance measures.

In the event that any provision of this Agreement shall be held to be unenforceable, then the Council and the Property Owner agree that such provision shall be severed from the remainder of the Agreement which shall continue in full force and effect.

The Council shall not be responsible for providing flood warnings or for ensuring that any other party does so.

The Council shall not be responsible for removing any fixtures associated with the Measures if or when the Property Owner no longer requires them.

Ownership of the Measures shall vest in the Property Owner and the Council shall not be responsible for the repair or replacement damaged or lost flood protection and resilience measures nor for the provision of any further measures.

The Property Owner should take up any defects arising within this period with the contractor and is encouraged to enter into a maintenance agreement with the contractor.

Agreement

I ………………………………….. (Name) confirm that I am the lawful owner / mortgagee of

…………………………………………………………………………………………… (Address)

and hereby agree to the terms of this agreement.

…………………………………………….………………………………

(Signature of property owner/mortgagee)(Date)

Signed for and on behalf of Northumberland County Council:

……………………………………………..……………………………….

(Signature of Council representative)(Date)

Further Definitions

“Council” / Northumberland County Council, County Hall, Morpeth, NE61 2EF.
“deploy/deployment” / The repeated task of fitting and removing the flood boards and air brick covers before and after a flood
“Environment Agency’s Flood Warning Scheme” / The Environment Agency’s “Floodline Warnings Direct” being a free service which sends a participant a direct message when flooding is expected and may affect the participants property (or any flood warning scheme which replaces or supplements it).
“Flood Protection Equipment” / The equipment and products (including any fixtures or fittings) required to implement the Flood Protection System.
“Flood Protection System” / The flood defence system to be installed in the property.
“Installation” / The fixing of any permanent brackets, fittings, etc to the Property including any necessary building work.
“Maximum Grant” / £5,000 per property (including VAT costs)
“Property” / The property to which the works relate
“Property Owner” / The legal owner/mortgagee of the Property whose signature appears at the bottom of this Participation Agreement
“Scheme” / Property Level Resilience Grant Scheme
“Supplier” / A supplier employed or engaged by the Council in relations to the Works.
“Works” / The list of works identified in the Survey and agreed with the Property Owner, required to implement the Flood Protection System. The Works shall include administration of the Scheme and the Survey.

The Council will return a signed copy of this agreement along with a confirmation letter of payment if your application is successful.
Payment Details

Payment will be made to successful applicants by electronic transfer to your nominated bank account and a letter will be issued to confirm payment. Please complete the details below so that payment can be made.

Payee Name ……………………………………………………………………..

Name of bank ……………………………………………………………………

Sort code …………………………………………………………………………

Account No. ……………………………………………………………………..

Declaration

To the best of my knowledge, the information in this form and all other information given in support of this application is correct. I confirm that that I understand the purpose of this form and the reasons for the collection of my/ our personal data (to the extent that this form contains information which is personal data for the purposes to the Data Protection Act 1998) and that I agree to my/ our personal data being used as stated.

If any information changes I will inform Northumberland County Council immediately.

Warning – if you knowingly or recklessly make a false statement to obtain grant for yourself or anyone else you risk prosecution, and the recovery of all grant payments. By signing this form you are agreeing that you have read and agree with the above declaration.

Page 1 of 10

Document Checklist

Completed Application Form

Copy of surveyor’s report / recommendations

Copy of property deeds or mortgage statement

Signed participation agreement

Payment details

Please return to:

Property Level Resilience Grant Scheme

Business Support

Local Services

NCC

County Hall

Morpeth

Northumberland

NE61 2EF

Page 1 of 10