RAJEEV GANDHI MEMORIAL COLLEGE OF ENGG & TECH, NANDYAL 518501
DEPARTMENT OF CIVIL ENGINEERING
Lesson Plan
Name of the Faculty / : Dr.T.Appa ReddyClass & Semester / : III B.Tech, II Semester ( A section) / Academic Year / : 2016 - 2017
Subject / : WASTE WATER ENGINEERING / Total Hours / : 54
Semester start date / : 24.11.2016 / Semester end date / : 30.04.2017
Topic / No of periods / Total periods per unit / Dates
Planed / Dates Executed
Introduction to all chapters
UNIT – 1: sewage quality and characteristics:
1. INTRODUCTION and Definition of terms
2. Sources of sewage
ü Domestic
ü Industrial water
ü DWF
ü Storm water runoff
ü Ground water infiltration
3. Systems of sewerage
4. Design-discharge and sampling procedure
5. Waste water analysis –
ü characteristics, determination
ü application of physical, chemical and biological characteristics / 1
3
1
1
2
2 / 10 / 30.11.16 to 14.12.2016
UNIT – 2: Sewer Design and plumbing network:
1. Common materials and shapes
2. Hydraulic design of sanitary swears ,Storm swear
3. Laying of sewer and Joining of sewer
4. Testing of sewer pipes
5. Pipe lines and fixtures for bathrooms, W.C
6. House drainage,
7. rain water collection systems
8. manholes, street inlets, flushing devises
9. Domestic sewers:
ü One pipe system, two pipe system
ü Traps, I.C. and other special structures / 2
2
1
1
1
1
1
1
1
1 / 12 / 14.12.2016 to 22.12.2016
UNIT – 3: Preliminary and primary treatment of
sewage :
1. Principals and objectives of sewage treatment
2. Operation and design of bar racks
3. Grit chamber with velocity control devices
4. Principles of primary treatment
5. Design of primary sedimentation tank
6. Disposal of racking , gritty materials ,Sludge solids / 1
1
1
1
1
1 / 06 / 26.12.2016 to 09.02.2017
UNIT – 4: Biological treatment processes:
1. Objectives of biological treatment
2. path ways of decomposition
ü Aerobic
ü Anaerobic
ü Anoxic processor
3. Operation and design of conventional activated sludge processes(asp)
4. diffuser and mechanical aerators ,
5. process modification
6. Analysis and design of tricking filters,
7. high rate and standard rate filters
1. Low cost waste water treatment
2. Principals and design of stabilization ponds
3. Oxidation ponds
4. aerated lagoons / 1
1
1
1
2
1
2
2
1
1
1
1
1 / 16 / 11-02-2017
to
02-03-2017
UNIT – 5: Sludge treatment and sewage farming:
5. Sludge digestion- factors effecting
6. Design of digestion tank
7. Sludge disposal by drying
1. Septic tank- working principal and design
2. Imoff tank- working principal and design
3. Soak pits
4. Application of sewage onland for agriculture suitability / 1
1
1
1
1
1
1 / 07 / 03-03-2017
to
10-03-2017
UNIT – 6: house drainage works:
sanitary fittings
5. General layout of house drainage works
6. Street connections / 1
1
1 / 03 / 10-03-2017
to
15-03-2017
Total number of periods in semester / 54
Signature of the Faculty Signature of Head of Department
RAJEEV GANDHI MEMORIAL COLLEGE OF ENGG & TECH, NANDYAL 518501
DEPARTMENT OF CIVIL ENGINEERING
Lesson Plan
Name of the Faculty / : Dr.T.Appa ReddyClass & Semester / : III B.Tech, II Semester ( B section) / Academic Year / : 2016 - 2017
Subject / : WASTE WATER ENGINEERING / Total Hours / : 54
Semester start date / : 24.11.2016 / Semester end date / : 30.04.2017
Topic / No of periods / Total periods per unit / Dates
Planed / Dates Executed
Introduction to all chapters
UNIT – 1: sewage quality and characteristics:
6. INTRODUCTION and Definition of terms
7. Sources of sewage
ü Domestic
ü Industrial water
ü DWF
ü Storm water runoff
ü Ground water infiltration
8. Systems of sewerage
9. Design-discharge and sampling procedure
10. Waste water analysis –
ü characteristics, determination
ü application of physical, chemical and biological characteristics / 1
3
1
1
2
2 / 10 / 29.11.2016 to 114.12.2016
UNIT – 2: Sewer Design and plumbing network:
10. Common materials and shapes
11. Hydraulic design of sanitary swears ,Storm swear
12. Laying of sewer and Joining of sewer
13. Testing of sewer pipes
14. Pipe lines and fixtures for bathrooms, W.C
15. House drainage,
16. rain water collection systems
17. manholes, street inlets, flushing devises
18. Domestic sewers:
ü One pipe system, two pipe system
ü Traps, I.C. and other special structures / 2
2
1
1
1
1
1
1
1
1 / 12 / 14.12.2016 to 21.12.2016
UNIT – 3: Preliminary and primary treatment of
sewage :
7. Principals and objectives of sewage treatment
8. Operation and design of bar racks
9. Grit chamber with velocity control devices
10. Principles of primary treatment
11. Design of primary sedimentation tank
12. Disposal of racking , gritty materials ,Sludge solids / 1
1
1
1
1
1 / 06 / 21.12.2016 to 10.01.2017
UNIT – 4: Biological treatment processes:
8. Objectives of biological treatment
9. path ways of decomposition
ü Aerobic
ü Anaerobic
ü Anoxic processor
10. Operation and design of conventional activated sludge processes(asp)
11. diffuser and mechanical aerators ,
12. process modification
13. Analysis and design of tricking filters,
14. high rate and standard rate filters
8. Low cost waste water treatment
9. Principals and design of stabilization ponds
10. Oxidation ponds
11. aerated lagoons / 1
1
1
1
2
1
2
2
1
1
1
1
1 / 16 / 11-01-2017
to
22-02-2017
UNIT – 5: Sludge treatment and sewage farming:
12. Sludge digestion- factors effecting
13. Design of digestion tank
14. Sludge disposal by drying
7. Septic tank- working principal and design
8. Imoff tank- working principal and design
9. Soak pits
10. Application of sewage onland for agriculture suitability / 1
1
1
1
1
1
1 / 07 / 22-02-2017
to
07-03-2017
UNIT – 6: house drainage works:
sanitary fittings
11. General layout of house drainage works
12. Street connections / 1
1
1 / 03 / 08-03-2017
to
10-03-2017
Total number of periods in semester / 54
Signature of the Faculty Signature of Head of Department
RAJEEV GANDHI MEMORIAL COLLEGE OF ENGG & TECH, NANDYAL 518501
DEPARTMENT OF CIVIL ENGINEERING
Lesson Plan
Name of the Faculty / : Dr.T.Appa ReddyClass & Semester / : III B.Tech, II Semester ( C section) / Academic Year / : 2016 - 2017
Subject / : WASTE WATER ENGINEERING / Total Hours / : 54
Semester start date / : 24.11.2016 / Semester end date / : 30.04.2017
Topic / No of periods / Total periods per unit / Dates
Planed / Dates Executed
Introduction to all chapters
UNIT – 1: sewage quality and characteristics:
11. INTRODUCTION and Definition of terms
12. Sources of sewage
ü Domestic
ü Industrial water
ü DWF
ü Storm water runoff
ü Ground water infiltration
13. Systems of sewerage
14. Design-discharge and sampling procedure
15. Waste water analysis –
ü characteristics, determination
ü application of physical, chemical and biological characteristics / 1
3
1
1
2
2 / 10 / 29.11.2016 to 13.12.16
UNIT – 2: Sewer Design and plumbing network:
19. Common materials and shapes
20. Hydraulic design of sanitary swears ,Storm swear
21. Laying of sewer and Joining of sewer
22. Testing of sewer pipes
23. Pipe lines and fixtures for bathrooms, W.C
24. House drainage,
25. rain water collection systems
26. manholes, street inlets, flushing devises
27. Domestic sewers:
ü One pipe system, two pipe system
ü Traps, I.C. and other special structures / 2
2
1
1
1
1
1
1
1
1 / 12 / 16.12.2016 to 27.12.2016
UNIT – 3: Preliminary and primary treatment of
sewage :
13. Principals and objectives of sewage treatment
14. Operation and design of bar racks
15. Grit chamber with velocity control devices
16. Principles of primary treatment
17. Design of primary sedimentation tank
18. Disposal of racking , gritty materials ,Sludge solids / 1
1
1
1
1
1 / 06 / 10.12.2016 to 10.01.2017
UNIT – 4: Biological treatment processes:
15. Objectives of biological treatment
16. path ways of decomposition
ü Aerobic
ü Anaerobic
ü Anoxic processor
17. Operation and design of conventional activated sludge processes(asp)
18. diffuser and mechanical aerators ,
19. process modification
20. Analysis and design of tricking filters,
21. high rate and standard rate filters
15. Low cost waste water treatment
16. Principals and design of stabilization ponds
17. Oxidation ponds
18. aerated lagoons / 1
1
1
1
2
1
2
2
1
1
1
1
1 / 16 / 13-02-2017
to
28-02-2017
UNIT – 5: Sludge treatment and sewage farming:
19. Sludge digestion- factors effecting
20. Design of digestion tank
21. Sludge disposal by drying
13. Septic tank- working principal and design
14. Imoff tank- working principal and design
15. Soak pits
16. Application of sewage onland for agriculture suitability / 1
1
1
1
1
1
1 / 07 / 28-02-2017
to
3-03-2017
UNIT – 6: house drainage works:
sanitary fittings
17. General layout of house drainage works
18. Street connections / 1
1
1 / 03 / 06-03-2017
to
10-03.-2017
Total number of periods in semester / 54
Signature of the Faculty Signature of Head of Department