1 Organization of Meeting 2

1.1 Meeting Identification, Chairmanship and Participation 2

1.2 Meeting Agenda 2

2 Key Results 2

2.1 Work Items Progressed 2

3 Meeting Documentation 2

4 Liaison Statements 2

5 Recommendation Status and Work Plan 2

5.1 Future Work 2

6 Detailed Report of Discussions 3

6.1 Opening Plenary 3

6.2 General Items 3

6.3 Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB) 4

6.4 Review of Work Plan for Planned Deliverables 4

6.5 Closing Plenary of Q.1/SSG 4

6.6 Review of Meeting Report. 4

7 Acknowledgements 4

Annex 1 – Work Plan 5

Annex 2 – List of documents 9

1  Organization of Meeting

1.1  Meeting Identification, Chairmanship and Participation

This is the report of a meeting of Q.1/19: Service and network capability requirements and network architecture.

Q.1/19 met in Geneva, during the SG19 Meeting, 19-27 July 2006. The meeting was chaired by Mr. Bruno Ramos, Q.1/19 Rapporteur, and by Mr. Atsushi Minokuchi, Co-Editor of Q.FNAB.

The meeting was attended by 12 participants from 7 countries.

1.2  Meeting Agenda

The Meeting Agenda was published in Temporary Document TD-385 R1. It was reviewed and approved.

2  Key Results

2.1  Work Items Progressed

·  Discussions and elaboration of the 5th Draft of ITU-T PDNR: Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB), based on the Delayed Contributions D.42, D.62, D.65 and D.66.

·  Reviewed, and agreed to the work plan for Q.1/19.

3  Meeting Documentation

Documents considered at this meeting are listed in Annex 2.

All documents are available at:

http://www.itu.int/md/T05-SG19-060719/sum/en

4  Liaison Statements

The meeting resulted in the preparation, with Q.2/19, Q.5/19 and Q.6/13, of one Liaison Statement to ITU-R WP 8F (TD 401 R1).

This LS is a response to the LS from WP 8F.

The LS from WP 8F contains the draft document towards PDNR ITU-R M. [IP CHAR] from WP 8F Bangkok meeting. It was reviewed by Q.1/19 and during a joint meeting of Q.2/19, Q.5/19, and Q.6/13.

5  Recommendation Status and Work Plan

Status and Work Plan for Recommendations and other deliverables under the responsibility of this Question are summarized in Annex 1.

5.1  Future Work

The next activity of Question 1/19 will be in the form of two Rapporteur Meetings before the next SG19 Meeting, as described bellow:

1st Rapporteur Meeting (e-meeting)

Duration: 10-24 October 2006

At: http://forum.itu.int/jive/index.jspa?categoryID=2

Terms of Reference: To progress the work on Q.FNAB.

2nd Rapporteur Meeting (e-meeting or face-to-face meeting)

Duration (e-meeting)*: 9-23 January 2007 (e-meeting)

Duration (face-to-face)*: (during SG 19 Rapporteur [NGN-GSI Event], January 2007)

At*: T.B.D

Terms of Reference: To progress the work on Q.FNAB.

*: the decision if this meeting should be an e-meeting or a face-to-face meeting will be decided during the 1st Rapporteur Meeting, take into account budget aspects.

SG 19 Meeting

Duration: 19-26 April 2007

At: Geneva

Terms of Reference: To finish the work on Q.FNAB.

6  Detailed Report of Discussions

Q.1/19 met during 24-26 July 2006.

6.1  Opening Plenary

The Q.1/19 session was called to order at 11:00hrs on 24 July. The proposed agenda for the Q.1/19 plenary was adopted and approved. The terms of reference for this meeting are to continue the work as assigned to this question.

6.2  General Items

The following provides a brief summary of the discussions on and dispositions of input documents that were assigned to the work item “General Items.”

Work item / Documents /
4a) General Items / TD GEN: 321; 323, 324, 326, 328, 338, 343, 345R1, 347R1, 351 /

TD 321: Timetable for the meeting of ITU-T Study Group 19 “Mobile Telecommunication Networks” (Geneva, 19-27 July 2006). For information.

TD 323: NGN and satellite work; and Intersector Coordination Group on Satellite (ICG-SAT) Matters. For information.

TD 324: Requirements and framework for CGOE components. For information.

TD 326: LS on NGN Protocol Sets. For information.

TD 328: Development of a PDNR ITU-R M.[IP CHAR] “Key technical and operational requirements for access technologies to support IP applications over mobile systems” in response to Question ITU-R 223-1/8. The Q.1/19 Meeting has prepared a LS in response to WP 8F, in collaboration with Q.2/19, Q.5/19, and Q.6/13. The LS is in TD 401R1.

TD 338: TD 338 is a LS from ITU-T SG17 titled “Summary of ITU-T Study Groups Security Related Activities”.

<Discussion notes are in the version of this document behind TIES.>

TD 343: LS on new working arrangement in SG 16 for ETS/TDR/EW and progress report. For information.

TD 345R1: LS on NGN Work Item on Media Coding Requirements for the NGN. For information.

TD 347R1: TISPAN NGN Release 1. For information.

TD 351: SG 4 Report and Request in its role as Lead SG on Telecommunication Management.

<Discussion notes are in the version of this document behind TIES.>

6.3  Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB)

Work item / Documents /
4b) Q.FNAB / D.42; D.62; D.65; D.66; TD 357 /

The Q.FNAB version 4.0 (Revision 1) is in TD 357.

<Discussion notes are in the version of this document behind TIES.>

The Q.FNAB v.5.0 is in TD 403.

6.4  Review of Work Plan for Planned Deliverables

The Work Plan for Q.1/19 was reviewed and is provided in Annex 1.

6.5  Closing Plenary of Q.1/SSG

Q.1/19 held its closing plenary at 16:00hrs on Wednesday, 26 July 2006. This report, including all annexes, was reviewed and agreed to. The delegates were thanked for their participation in the Q.1/19 activities at this meeting. Q1/19 discussion meeting was closed at 17:30 hrs.

6.6  Review of Meeting Report.

The draft meeting report in TD-405 was reviewed and approved as TD–405 R1.

7  Acknowledgements

·  Participants - for their participation at this meeting.

·  Mr. Atsushi Minokuchi, from NTT DoCoMo, for work as Co-Editor of Q.FNAB.

- 7 -

TD 405 Rev.1 (GEN/19) - PUBLIC

Annex 1 – Work Plan

Rec. / ST / Question / SG / Timing / Priority / Pages / Liaison / Area / Domain / References* / Subject /
Q.1701 / R / 1/19 / 19 / M / 27 / 15,37 / 99 / Framework for IMT-2000 networks
Q.1711 / R / 1/19 / 19 / M / 29 / 15,37 / 99 / COM 11-R 116 / Network functional model for IMT-2000
Supplement 30 to Q-Series Recommendations / R / 1/19 / 19 / M / 15,37 / 00 / Specifications of International Mobile Telecommunications-2000
Q.FIFB / N / 1/19 / 19 / TBD / H / ITU-T SGs 2, 11, 12, 13, 16, ITU-R WP 8D and 8F (WG-Vision), ITU-D SGs, SDOs (TTA, TTC, ETSI, TIA, ATIS, ARIB, CCSA) / 15,37 / 27 / Long-term high-level network functional information flows for beyond IMT 2000 systems
Q.FNAB / N / 1/19 / 19 / 2Q 2007 / H / ITU-T SGs 2, 11, 12, 13, 16, ITU-R WP 8D and 8F (WG-Vision), ITU-D SGs, SDOs
(TTA, TTC, ETSI, TIA, ATIS, ARIB, CCSA) / 15,37 / 27 / Long-term high-level network architecture for systems beyond IMT 2000, including definition of functional entities (FEs), allocation of functional capabilities to FEs, and interfaces model among Fes

*) In this column the term “published” means that the previous approved version of the relevant Recommendation is available from the ITU.

- 7 -

TD 405 Rev.1 (GEN/19) - PUBLIC

Proposed Work Plan for Q.FNAB

Date / Meeting Schedule / Deliv. 2
Q.FNAB
2004
September
1st -15th / Q.1/SSG Meeting
(electronic mtg) / Developing
1st Draft
|
December
13-17 / [9th SSG Meeting]
1st SG 19 Meeting / ¯
2nd Draft
2005
March
8-22th / Q.1/19 Meeting
(electronic mtg) / ¯
Developing
2nd Draft
v 2.1
May
3-6 / 2nd SG 19 Meeting / ¯
3rd Draft
July
5-19 / Q.1/19 Meeting
(electronic mtg)
cancelled / ¯
September
5-9 / 3rd SG 19 Meeting / ¯
4th Draft
November
8-22 / Q.1/19 Meeting
(electronic mtg)
cancelled / ¯
2006
January
23-27 / 4th SG 19 Meeting / ¯
Discussions
May
23-6 June / Q.1/19 Meeting
(electronic mtg)
cancelled / ¯
July
19-27 / 5th SG 19 Meeting / ¯
5th Draft
v 5.0
October
10-24 / Q.1/19 Meeting
(electronic mtg) / ¯
6th Draft
v 6.0
2007
January / Q.1/19 Meeting
(T.B.D) / ¯
7th Draft
v 7.0
April
19-26 / 6th SG 19 Meeting / ¯
8th Draft
v 8.0
AAP

Terms of Reference for proposed Q.1/19 Rapporteur’s Meetings:

To continue the work on Q.FNAB.

Annex 2 – List of documents

Work item / Documents /
4a) General Items / TD GEN: 321; 323, 324, 326, 328, 338, 343, 345R1, 347R1, 351 /
4b) Q.FNAB / D.42; D.62; D.65; D.66; TD 357 /
4c) Work Plan / 322-GEN /

______