Proposed Corrective / Preventive Actions

/

TTF3 Couplers

NON CONFORMANCE REPORT
Created by:
TN/DK / Date:
5-26-2010 / Report NCR#
16
Supplier / Supplier Address
Part name/ Number
WARM PART RF IN FH09
DURING BAKE OUT / Serial Number(s)
BUILD #5 / Qty
Preliminary finding
05-26-2010 @ 15:45: The oven was at 100C. The ion pump readings were good. We reset the oven temp to 150c.During the rise in oven temperature the Ion pump that is connected to power supply 10B trip a breaker from high current draw. We tried to reset the power supply, the power supply would not reset. The oven was then turned off so we could troubleshoot the situation.
05-27-2010 @ 08:00: After some testing, it appeared that the high voltage cable going to 10B was shorted. The shielding had come in contact with the center conductor where it was clamped for strain relief. We replaced the cable. The ion pumps where all working again.
At 16:30 we put the couplers back into the oven, connected the nitrogen purge. And purged the system over night.
05-28-2010@ 09:00: The oven was restarted and set to 100C. At 14:00 the oven was set to 150C.
05-30-2010@ 13:30:The bake out was completed and the oven was turned off.
MRB:
Out of tolerances? □ Yes □ No / Drawing #

Proposed Corrective / Preventive actions

Corrective Action
Preventive action
Person in charge of Corrective / Preventive action: Name Date Signature
Customer’s agreement
□ Solution up to Manufacture/supplier
□ Proposed solution is accepted
□ Proposed solution is not accepted – new proposal:
DISPOSITION
Use as is □ Repair □ Rework □ Return to vendor □ Scrap □ Other □
Customer’s Agreement: Name: Date:

Closing of the Non conformance

Planned corrective/preventive action has been completed:
Name Date / Independent verification has been completed:
Name Date
Distribution: