Office of the Executive Engineer Irrigation & F.C. Division Baramulla

Office of the Executive Engineer Irrigation & F.C. Division Baramulla

Government of Jammu and Kashmir

Office of the Executive Engineer Irrigation & F.C. Division Baramulla

Please read:-

  1. Item of work at S.No.2.00 “Handpicking stones in wire crates & excl. cost of crates & stones”

instead of “Centering and shuttering including strutting, propping etc removal of form for:- Walls (any thickness)including attached Pilasters, buttresses, plinth & string Courses etc.” as shown in Work No.05 of e-Tender Notice No.05 of 2014-15.

  1. Item of work at S.No.3.00 “Providing & laying cement concrete in retaining walls return walls , walls (any thickness ) including attached pilasters , columns piers abutments , pillar posts struts , buttresses string or laces courses parapets coping bed blocks Anchor blocks plain window sills ,sunken floors fillets etc. up to floor five level excluding the cost of centering , shuttering & finishing1:3:6( I1 cement :3 coarse sand :6 graded stone agg,20mm N/size( Crushed)”

instead of “Centering and shuttering including strutting, propping etc removal of form for :-Walls (any thickness)including attached Pilasters, buttresses, plinth & string Courses etc.” as shown in Work No.06 of e-Tender Notice No.05 of 2014-15.

  1. Item of work at S.No.3.00 “Providing & laying cement concrete in retaining walls return walls , walls (any thickness ) including attached pilasters , columns piers abutments , pillar posts struts , buttresses string or laces courses parapets coping bed blocks Anchor blocks plain window sills ,sunken floors fillets etc. up to floor five level excluding the cost of centering , shuttering & finishing1:3:6( I1 cement :3 coarse sand :6 graded stone agg,20mm N/size( Crushed)”

instead of “Centering and shuttering including strutting, propping etc removal of form for :-Walls (any thickness)including attached Pilasters, buttresses, plinth & string Courses etc.” as shown in Work No.07 of e-Tender Notice No.05 of 2014-15.

  1. Item of work at S.No.3.00 “Providing & laying dry stone soling (Quarry)”

instead of “Centering and shuttering including strutting, propping etc removal of form for:- Walls (any thickness)including attached Pilasters, buttresses, plinth & string Courses etc.” as shown in Work No.09 of e-Tender Notice No.05 of 2014-15.

  1. Item of work at S.No.3.00 “Providing & laying in position cement concrete of specific grade excluding the cost of centering & shuttering all work up to plinth level 1:4:8 ( 1 cement 4: coarse Sand 8 : grade stone Agg) 40 mm nominal size crushed”

instead of “Centering and shuttering including strutting, propping etc removal of form for:- Walls (any thickness)including attached Pilasters, buttresses, plinth & string Courses etc.” as shown in Work No.10 of e-Tender Notice No.05 of 2014-15.

All other quantities, units, rates, dates, terms and conditions shall remain same as laid down in the NIT.

No: I&FCDB/7463-86

Dated: 04/03/2015. Xen.

Copy to the:-

1. / Chief Engineer, Kmr. Irrigation and Flood Control Department, Srinagar for information and with the request that said corrigendum be got uploaded on our official website.
2. / District Development Commissioner Baramulla for information.
3. / Superintending Engineer Hydraulic Circle Baramulla, H.Q. Sopore for favour of information, please.
4. / Dy. Director Information Srinagar for information. He is requested that corrigendum may kindly be got published in at least two leading Dailies before the due date of issuance of tender document, and a copy of each Newspaper in which the corrigendum is published be sent to this office for record and reference.
5. / In-charge Computer Section-for publication in website.
6-9. / Ex. Engineer I&FC Division Sopore/PHE Sopore/ PHE Division Baramulla/Hydraulic Division Uri for information.
10-14. / Assistant Executive Engineer, Irrigation Sub. Division Baramulla/RHL Tragpora/ Watergam & FCSD Baramulla/FSC SD Singhpora for favour of information.
15-17. / Asst. Accounts Officer/ Head Assistant / Head Draftsman Divisional Office for information.
18-22. / Contractors Association Baramulla/R&B Baramulla/Rafiabad/Uri & Self Help Group Baramulla for information.
23. / Saba Advertising agency with the request that corrigendum be got aired through DD before due date of issue of tender documents.
24. / Notice Board.

Executive Engineer

Irrigation & FC Division

Baramulla

Ummar Ahmad (C.O.) I&FCD Bla.