DETAILED C.V

Name : Jonathan Liaw Ting Hui

Race : Chinese

Date of Birth : 15 th April 1970

IC No. : 700415-13-5319 ( K 0217763 )

Profession : Project Manager

Telephone No. : 0168899725 / 0198891077

E-mail :

EDUCATION AND ACADEMIC AWARD

  1. Certificate in Electrical Engineering 1987 – 1989 (Vocational School, Kuching )
  2. Diploma in Electronic & Electrical Engineering 1997 (Distance Learning)
  3. Degree in Electronic & Electrical Engineering 2002 (Distance Learning)

EXPERIENCE

1) Company : J & M Power S/B:- 2012

Location : Based in Bintulu (TOKUYAMA SITE)

Position : Project Manager (E & I )

Section : Management

Duties:

Work as an Project Manager at J & M .My scope of work include supervision for all the Project installation, Find New Project, Project Claim , Inspection ,Support EH&S & Testing commissioning all Equipment & the daily report & Maintenance Plant.

Work asProject Manager and my responsibility:-

  • Overall planning, monitoring and controlling for project.
  • To monitor and adjust construction schedule.
  • To make necessary decisions to sites on all construction activities.
  • To ensure material delivery to site on schedule.
  • To approve material requested by superintendent/supervisor.
  • To monitor on Work Method Statement and Job Safety Analysis.
  • To Monitor on QA/QC work.
  • To propose method of installation and technical specification on engineering issues at site.
  • Able to communicate and coordinate effectively with Client, Consultants, Construction team and Sub-Contractors.
  • Translation and preparation of document, specification, drawing and etc.
  • Able to meet the tight deadline, work under pressure and work independently.
  • To attend daily meeting with client and other sub-contractors on work coordination.
  • EH&S Accountability.

2) Company : Kina Biopower Plant & Seguntor Bioenergy Plant

(Power Plant) –2011 - 2012

Location : Based in Sandakan, Sabah

Position : Maintenance Manager

Section : Management

Duties:

Work as an Maintenance Managerto in changer two Power Plant .My scope of work Maintenance Planning for service the Turbine and Generator, Scheduling and Planning for Plant Shutdown Schedule and improvement for critical equipment at the plant and Inspection Support EH&S & Testing and commissioning all Equipment & the daily plant for PM & CM and key in Data for the Maintenance work.

Job Scope and Responsibility

  • Conduct proper planning, scheduling, monitoring and verification of

Service,work performed by Engineer, Supervisors ,Technicians and

Sub-Contract worker to ensure the equipment are well maintained

for safe and efficient operation with minimum breakdown rate and downtime.

  • Assist the competent person in conducting the annual JKKP and quarterly inspection of the service units in the area of operation and ensure timely execution of corrective action plan to rectify any defects found during the inspection for prompt closure of open issue with the JKKP Authority.
  • Ensure proper inspection and handing over procedures on NE units from installation

Department and or newly recaptured units to Service Operation Division; scheduling of corrective action plan on rectification works to be done.

  • EH&S Accountability.

3) Company : SIGMA ELEVATOR (M) SDN.BHD (2009 - 2010)

Location : Based in Kuching

Position : Branch Executive / Resident Engineer & Sale Engineer

Section : Management

Duties:

Work as an Resident Engineer at Sigma Elevator .My scope of work include supervision for all the Project installation, Find New Project, Project Claim , Inspection ,Support EH&S & Testing commissioning all Equipment & the daily plant Servicing & Maintenance Plant.

Job Scope And Responsibility

  • Conduct proper planning, scheduling, monitoring and verification of

service ,work performed by Engineer, Supervisors ,Technicians and

Sub-Contract worker to ensure the Customer equipment are well maintained

for safe and efficient operation with minimum breakdown rate and downtime.

  • Assist the competent person in conducting the annual JKKP and quarterly inspection of the service units in the area of operation and ensure timely execution of corrective action plan to rectify any defects found during the inspection for prompt closure of open issue with the JKKP Authority.
  • Ensure proper inspection and handing over procedures on NE units from installation

Department and or newly recaptured units to Service Operation Division; scheduling of corrective action plan on rectification works to be done.

  • Ensure full compliance with the local laws and statutory requirements,UTC Code of Ethics and UTC Environment, Health and Safety Policy and Procedures including all prevailing WWJSSS Rule and Regulations and take necessary corrective measures to ensure subordinate staffs and subcontract workers are aware of these laws and policies and that their actions and responsibilities comply with and support these laws and policies.
  • Build up and maintain good customer working relationship by regular visitations and carry out necessary customers’ satisfaction survey to assess the acceptance level of the service rendered by the company for review and further improvement programs.
  • EH&S Accountability.

4) Company : BORNEO CYNTEX SDN BHD (2008-2009 )

Location : Based in Kuching

Position : Service & Sale Engineer

Section : Engineering

Duties:

Work as an Service Engineer at Borneo Cyntex .My scope of work include supervision for Project installation & commissioning all Medical Equipment & the daily plant Servicing & Maintenance.

Job Scope And Responsibility

  • Checking, testing and installation of new bio medical equipments from small

Machines such as suction pump and to all the big machines such as an aesthetic machines including ultrasound machines to all PKB, Hospitals, Private Hospitals and GPs.

  • Plan preventive maintenance, servicing and repairing for all the above said equipments under service contract
  • Follow up sales and service for all the hospitals, GPs and klinik kesihatan
  • Liase with all the supplier, end user and all the vendors
  • Work out for all the machines schedule for PPM and servicing

5) Company : X-FAB Sarawak Sdn.Bhd. (2000 - 2007 )

(Formerly Known as 1st Silicon(Malaysia)Sdn.Bhd.)

Location : Based in Kuching

Position : Facility Engineer

Section : Ultrapure Water Plant & Waste Water Treatment System

Duties:

Work as an Facility Engineer at 1st Silicon .My scope of work include supervision for Project installation & commissioning UPW & IWWT Plant & the daily plant Operation

Maintenance.

My duty mainly involved:

MAJOR RESPONSIBILITIES

  1. Daily plant operation
  • Provide feedback and solution regards to Ultra Pure Water and Waste Water process abnormal situation
  • Trained juniors
  • Executing activities such as backwash, regeneration, chemical pumping, adjust process variables etc.
  • Checking instrument readings, other plant data’s & keep record of activities
  • Conduct water sample analysis (pH, conductivity, COD, TOC, chlorine, chloride, hardness, fluoride, turbidity, suspended solids & so on)
  • Respond to alarms, OOC( out of control) and OOS( out of service) situations
  • Troubleshoot abnormal process conditions
  • Respond to FMCS or ERT calls – identify, locate and respond to emergencies
  • Manpower arrangement during emergency
  • SPC setting up & monitoring
  • Establish work instruction & checklist for UPW & WWT plant
  • Optimizing process ( cost saving & effectiveness)
  1. Maintenance
  • Do scheduled plant PM as per SAP plan –

-calibration (pH sensors, conductivity sensors, DO2 sensors, silica analyzer, fluoride analyzer, turbidity analyzer etc.)

-Centrifugal Pump performance/vibration check, greasing & alignment

-Cation exchanger external backwash, Reverse Osmosis chemical cleaning, Granular Activatated Carbon steam sterilization

-Wilden pumps & dampeners servicing

-Filters replacement

-Resins change out & commissioning

-UV lamps/ quartz sleeves/ ballasts change out

  • Respond & rectify emergency equipment break down and carry out corrective maintenance promptly
  • Responsible to track PM and ensure works are executed per SAP schedule
  • Developed & amended maintenance checklists & work instructions
  • Troubleshoot and repair plant instruments and equipments
  • Allocate manpower for maintenance job
  • Ensure maintenance records are kept in good order and up-to-date as per Maintenance Specification
  1. Cost Saving
  • Reduce Waste water treatment plant chemical consumption by process optimization while compile to DOE standard B specification
  • Revise regeneration frequency of Mixed bed/ cation exhanger for optimum performance
  • Revise maintenance part change out plan for Wilden pump ( pneumatic air pump) from fixed duration to condition based without jeopardizing process integrity
  • Prolonged RO prefilter life span by maintaining good water quality upstream
  1. Hook-Up
  • Supervise hook-up work and tool energization for UPW and Process Drain lines
  • Line-tracing, identify and/or verify UPW and Process Drain lines and routing
  • Troubleshoot Hookup Lines for UPW and Drain Lines
  1. Supervision of vendors
  • Supervise 3rd party lab during sampling, maintenance or other activities
  • Supervise waste contractor waste collection and disposal activities
  • Supervise repair, modification, expansion or other projects done by vendors or contractors
  1. Housekeeping
  • Cleaning and housekeeping of UPW and WWT plant area and equipment
  • Disposal of UPW and WWT hazardous and/or scheduled waste to designated

Collection sites.

  1. Material stock & inventory
  • Keep record of PPE. Alert Engineers for low stock level.
  • Keep record of tools and instruments stock and condition.
  • Keep track of spare parts inventory & consumables stock

Strength/achievement

  • Able to plan & execute maintenance activities in time
  • Able to provide back up to operation activities whenever needed
  • Able to provide coaching to subordinates, lead by example
  • Performance ranking consistently at high side over the years
  • Good relationships at all levels
  • Sub-committee of 1st Silicon ISO 14001 & OSHAH 18000 setting up team
  • EHS section committee.

6) Company : Teknik PS Sdn Bhd (1996 – 2000)

Location : Based in Kuching

Position : Technician Supervisor

Duties:

Has been trained by Techtrol Limited of England for the site preparation, installation, testing & commissioning of incineration systems. Presently, involved in the maintenance and routing servicing of Pyrotec Clinical C200 incineration system in Sibu.

Also involved in the installation, testing, commissioning, routing servicing of card access system, lift access system, public information electronic display board (stadium scoreboard), queue management system and hospital distilled water system.

Employed under Teknik PS Sdn Bhd for 3 years as technician supervisor. Supervision of technical staff in hospital equipment maintenance and repair. Ordering of spare and materials to suit work programmer.

7) Company : Weida Resources (1989 – 1995)

Location : Based in Kuching

Position : Site Supervisor

Duties:

With Weida Resources (from 1989) as site supervisor installing solar power system, electrical & electronic works, HDPE & MDPE pipe welding pond lining & other mechanical & electrical works.

Work involved site supervision and management of contracts for the following works: -

1)Solar powered electrical cells and distribution systems (Rural application)

2)Electrical supply and domestic (kampung) installation from solar supply system.

3)Installation of water tanks, supply systems for domestic and industrial supply using HDPE tank and pipe.

Site supervision of MDPE pipe jointing and welding for rural water supply. Pond liners, involving laying, welding and testing for water and sewage system.

4)Associated Mechanical and Electrical equipment for rural pump water supply and plants.

General site supervision, client and HO liaison and labour force control.

Training/ courses attended / Emergency Response Training / 29.09.2000 / 04.10.2000
Gas Detection System Awareness / 15.12.2000 / 15.12.2000
WWT & UPW Instrumentation / 19.06.2001 / 20.06.2001
Safety & Chemical Handling / 25.06.2001 / 25.06.2001
Gas Detection System Awareness / 23.11.2001 / 23.11.2001
Facilities SAP Training / 21.02.2002 / 22.02.2002
UPW System Maintenance Training / 20.05.2002 / 24.05.2002
UPW System Training / 04.06.2002 / 07.06.2002
UPW System Training / 01.07.2002 / 05.07.2002
Working in Team Spirit Training / 21.02.2003 / 22.02.2003
Pump Inspection & Maintenance / 02.09.2003 / 04.09.2003
EHS Re-Certification 2003 / 16.09.2003 / 16.09.2003
Alignment Course / 20.10.2003 / 22.10.2003
Personal Development Leadership / 26.04.2004 / 27.04.2004
Developing Supervisory Skills / 20.05.2004 / 22.05.2004
Occupation Safety & Health for Supervisors / 22.02.2005 / 23.02.2005
Couching Skills for Supervisors / 25.04.2005 / 26.04.2005
MysCad / 12.05.2005 / 13.05.2005
Authorised Gas Tester / 04.07.2005 / 05.07.2005
Job Hazards Analysis / 06.12.2005 / 06.12.2005
ERT Training / 10.12.2005 / 11.12.2005
Chemical Safety / 16.01.2006 / 16.01.2006
Endress + Hauser / 21.06.2001 / 22.06.2001
KnowLedge Group of Companies / 01.03.2002 / 02.03.2002
ONDEO Industrial Solutions / 20.05.2002 / 06.08.2002
SIEMENS Advanced Engineering Pte Ltd Singapore / 12.08.2002 / 14.08.2002

LANGUAGES SPOKEN

English, Mandarin, Bahasa Malaysia

LANGUAGES WRITTEN

English, Chinese, Bahasa Malaysia

DIALECTS SPOKEN

English, Hokkien, Mandarin, Cantonese

INTEREST

Jogging, Badminton, Swimming, Bowling & Movie

OTHERS:

Present Salary: RM 9500

Expected Salary: