TESTING & COMMISSIONING REPORT
TRACTION ELEVATOR
Building / Location
Elevator No.
General Description / Type / Tr/Machine / Main Rope
Capacity / Tr/Motor / GOV Rope
Speed / Serial No. / Comp Rope
Power Supply / Production / Roping
Operation System / Door System / Door Motor
Brake Test / Brake Contact Gap
Brake Spring Settin
Safety Test / CAR / CWT
Load Test / Load / Up / Down
% / Kgs / Voltage (V) / Current (A) / Speed (mpm) / Voltage (V) / Current (A) / Speed (mpm)
0
50
100
Load Value / LDO / LD1
Balance Load
Over Load Device / Switch Setting 110% / Indicator / Buzzer
Power Supply / RST / Light
MCB
Calibrated Equipment / Volt Meter / Ref.No. / Tacho Meter
Clamp Meter / Ref No. / Ref.No.
Safety Switch Test / Machine Room / GOV
Car Cage / Run-Stop(Top&Incar)
Emergency Exit
Gate Switch
Safety Gear Operated Switch
Hoistway / Top Limit
Door Lock
Bottom Lock
Lift Pit / Pit Switch
Comp.Switch
GOV Switch
Limit Switch / UL / UOT / DL / DOT
Cage Finishes / B Panel / L Panel / Flooring / Operating Panel
R Panel / F Panel / Arm Rest
Fan / Mirror / Ceiling
Elevator which is less than 120m/min speed is checked by bodily sensation
Elevator which is more than 120 m/min speed is taken vibration data by vibration meter
Remarks
Sub-Contractor
Name & Surname
Date
Signature
Buffer Test
Clearance
Pit Depth
Car Run By
GOV Tension Sheave
Car Buffer Height
Car Buffer Stroke
CWT Run By
CWT Buffer Height
CWT Buffer Stroke
Compensator Sheave
Cage To CWT
Car To Clearance
Car Bottom
M/Room Head Room
Car To Hoistway
CWT To Screen
CWT To Hoistway
Car Rail Top Clearance
CWT Rail Top Clearance
CWT Top Clearance
CWT Bottom Spacer
Hosting Rope Tension (From Left) / 1st Sec/Time
2nd Sec/Time
3rd Sec/Time
4th Sec/Time
5th Sec/Time
6th Sec/Time
7th Sec/Time
8th Sec/Time
Average Sec/Time
In Case Common Hoistway Clearence Between Lift# and Lift# mm
Installation Completion & Test Report (Rope Traction Elevator) / Function Check / By-Pass / Fan / Alarm / Ray Switch / FE Operation / OEPS / FER Operation / T.S.D. / E.T.S / Interphone / EBOPS / MELD / USDS / MBS / Remark :
Door Opening / Open
Close
Hall Finishes / Door
Jamb
Hall Lantern
Hall Indicator
Hall Button
Door Sill / Left
Right
Down Levelling / Full Load
No Load
Up Levelling / Full Load
No Load
STY