Minutes of the DDC meeting held on 15/09/2016 in the Conference Hall

Of D.C’s Office, Barpeta.

Members Present- Incorporated in Annexure-I

Shri Thaneswar Malakar, IAS, Deputy Commissioner, Barpeta presided over the meeting.

At the outset of the meeting the Chairman welcomed all the members present in the meeting. After self-introduction of all the officers present in the meeting, initiated the discussion as per agenda. The discussion was started with the review of the minutes of last DDC meeting and followed the review of all Deptts.:

1.Agriculture: The progress of various scheme under Agriculture department are highlighted below:-

A. RKVY : For the year 2016-17, 3.25 qtl Paddy BREADER Seeds distributed.

B. Disaster Management: No new targets for the year 2016-17 have been received as reported.

C.NFSM : No new targets for the year 2016-17 have been received as reported.

D.MIDH : Target for 2016-17 has not yet received from the Directorate.

E) National Bamboo Mission: Target for 2016-17 has not yet received from the Directorate.

F) SCCP& TSP :No schemes sanctioned by govt. till date.

G) NMOOP :

Component / Target / Achievement during the month / Cumulative total / Remarks
Distribution of Diesel Pump set / 8 nos / 1 / 1
Electric Motor / 22 / 16 / 16

H) Centrifugal Pump Set:-

Component / Target / Achievement during the month / Cumulative total / Remarks
Electric Pumpset / 600 nos / 300

I)KCC- The target for the year 2016-17 for KCC loan has been fixed at 18370 nos. ADC (Agri) DAO and LDM will finalised for finalising KCC Loan. The Achievement of KCC up to July, 2016 is as follows:

Up to the Previous month / Achievement during the month / Cumulative total / Remarks
No of Application Sponsored to Bank / 405 / 135 / 540
No of KCC sanctioned by Bank / nil / 25 / 25
Amount Sanctioned / nil / 20.10 lakh / nil
No of Credit Camp Organised / nil / nil / nil

It is reported that some banks sanction KCC loan from their end. DC instructed LDM to share the figure with DAO, Agriculture, so that the reporting of KCC will be appropriate.

In reply to Deputy Commissioner’s Query on action taken to eradicate CharohaPok (Army worm).

DAO state that day to day supervision of under-five ADCs as Deputed by DC at different zone is going on so that situation may not be worsen. All the ADOs and village level workers are keeping street Virgil in the field .

J) Agriculture Engineering (Pathsala):-In absence of Asstt. Executive Engineer (Agri) Pathsala no matter could be discussed

K) Agriculture Engineering (Sorbhog):-The Chairman advised Agril. Department to report on current target only, as many earlier schemes which were already achieved were being reported.

Scheme / Name of Component / Sub Component / Total target (nos) / During the Month / Cumulative total(Nos) / Remarks
Distribution of power tiller 2014-15 / Farm Mechanization / Power Tiller / 105 / 4 / 4 / New selection will be done 2016-17
Current on-going Scheme
Establishment of Village Level Farm Machinery Bank / @95% subsidy / - / No fixed Target
SMAM (2014-15)
PMKSY / No target received

. The Chairman directed the Dist. Agriculture Officer to convene meeting with bank regarding sanction of KCC loan proposal.

(Action-DAO/AEE Agril, LDM)

2.PWD : The Executive Engineer, PWD(RR) informed that 265nos.of roads under PMGSY are there in the district beside other roads. Out of 265 nos. 248nos.have been completed and 17nos.of roads are yet to be completed. The incomplete schemes are targeted to be completed as per extended schedule time.

a)Rural Roads Division :The progress of various schemes are highlighted below : -

Year / Schemes / Nos of Roads/Bridges taken up / Length in KM / Completed / Balance
Nos. / Length / Nos. / Length
PMGSY (Upto 2008-09) / 242 / 869.299 / 234 / 848.19 / 8 / 21.109
PMGSY RCIP – I
(2012-13) / 10 / 21.09 / 7 / 14.36 / 3 / 6.73
PMGSYRCIP-II
(2012-13) / 6 / 11.87 / 3 / 7.63 / 3 / 4.24
PMGSYRCIP-III
(2013-14) / 4 / 8.960 / 1 / 2.13 / 3 / 6.830
PMGSY (Ph-X)
(2013-14) / 3 / 4.460 / 3 / 4.46 / 0 / 0.0
Total / 265 / 915.679 / 248 / 876.77 / 17 / 38.91
Left out Bridge (2012-13) / 22 / 7 / 15

For others the progress is shown below

Head / No .of Schemes Sanctioned / Completed / On-going
SDRF-2013-14 / 23 / 22 / 1
SDRF-2014-15 / 13 / 6 / 7
SDRF- 2015-16 / 7 / 3 / 4
Annual Plan (TSP) -2014-15 / 3 / 2 / 1
Annual Plan (TSP) 2015-16 / 2 / 0 / 2
Annual Plan (Gnl) -2014-15 / 10 / 7 / 3
Annual Plan (Gnl) 2015-16 / 12 / 0 / 12
Annual Plan (SCSP) -2013-14 / 9 / 8 / 1
Annual Plan (SCSP) -2014-15 / 10 / 8 / 2
Annual Plan (SCSP) 2015-16 / 20 / 0 / 20
MMABY 2008-09/09-10/10-11 / 2 / 1 / 1
MPNA 2013-14 / 9 / 3 / 6
Entry Tax 2011-12 / 19 / 18 / 1
Entry Tax 2013-14 / 3 / 3 / 0
13th FCA 2011-12 / 14 / 12 / 2
13th FCA 2014-15 / 3 / 1 / 2
RIDF XV 2010-11 / 1 / 0 / 1
RIDF XIX 2013-14 / 2 / 2 / 0
RIDF XX 2014-15 / 11 / 3 / 8
RIDF XX 2015-16 / 10 / 0 / 10
SCA 2011-12 / 6 / 4 / 2
Non –Plan (3054) 2013-14 / 33 / 29 / 4
Non-Plan (3054) 2014-15 / 18 / 4 / 14
Non-Plan (3054) 2015-16 / 4 / 1 / 3
Non-Plan (5054) 2014-15 / 1 / 0 / 1
CM’s Spl. Pkg 2013-14 / 8 / 0 / 8
NLCPR 2013-14 / 1 / 0 / 1
Untied Fund 2014-15 / 1 / 0 / 1
FAPNA 2015-16 / 8 / 0 / 8

DC instructed E. E. PWD (RR) to submit list of schemes which will be completed within March 2017. Moreover DC instructed E.E. PWD (RR) to form a new committee to expedite completion of works in the disturb area and to use labours of the department for repairing of damage roads.

NLCPR :

1. Sarumanikpur to Maharani Rd. Br.No.1/1(L=75.00 M) =85%

b) State Road:.

Sl No / Name of Work / Sanctioned Amount (Rs. in Lakh) / Physical Progress / Remarks
SDRF (FDR)
1 / Restoration of Damage to Bhawanipur Simalaguri Road(12.5 KM) under SDRF 2012-13 under SDRF 2013-14 (ch 0.00 to 3050.00M) / 87.96015 L / 57% / Work in Progress ( Work halted)
A.P.- 2012-13
2 / Strengthening widening and providing Divider at Barpeta Road Bashbari Road leading to Manash Sanctuary from 0.00 km to 1.80 km / 337.68 / 68% / Working estimate submitted but not yet approved.
H/A: 2052
3 / Repair & Rehabilitation of Barpeta Bashbari Road leading to Manash Sanctuary 2nd Km to 11 Km / 221.12 L / 50% / Balance work estimate has been submitted.
13th Finance 2014-15
4 / Repair & maintenance of road under 13th FC for the year 2014-15 under Barpeta Rural Road Div. & State Road Div. Package No. BAR/PBMC/1 under PWD State Road Div. / 300.00 / 85% / Working estimate submitted but not yet approved.
i)Periodic Renewal to the Nagaon- Sarthebari Road under PBMC for 2014-15 for Rs. 30.45 L (L-19.00KM)

C) PWD NH Division, Rangia

Sl No / Name of Work / Target date of completion / Progress Ending 03/16
As per Tender / Extended Date / Phy / Fin
1 / Strengthening of existing 2- Lane with paved shoulder road from km 0.00 to 29.20 (Length=29.20 km of NH-152 under SARDP-NE, Phase-A in the state of Assam. (Job No. SARDP-NE/NH-152/AS/PWD/2013-14/227) / 19/03/2016 / 30/06/2016 / 93% / Rs. 3020.55 Lakh

d) PWD (NEC):

Sl No. / Name of Work / Date of Commencement / Date of Commencement / Length of Road (KM) / Physical Progress / Financial Progress / Remarks
1 / Impvt./ Const. of road from Bhawanipur NH 31 to Manas National Park via- sarupeta, Saudarvitha, Ananda bazar road under NEC’s 11th five year plan / 15-12-2013 / June/2016 / 39.13 / 90% / 71% / Work progress slow due to weather condition

As reported by PD DRDA the fund against the scheme repairing of Approach Road of Mandia Dongra Bridge has already been released. The Chairman asked the Deptt to complete the works immediately. As reported by the Executive engineer PWD (R) no satisfactory progress of works could be made during July and August due to flood. The Chairman asked SDO © Bajali to review the on-going schemes under PWD ® Deptt .The Executive Engineer PWD (RR) will arrange a meeting with the contractor so that progress may be discusses thoroughly.

(Action-All EE PWD(R))

3 . PWD Building Division, Nalbari:

Name of Scheme Amount involved Physical progress

RMSA

1.  Const. of Polytechnic under State Plan 2011-12 763.69 lakh 87%

2.  Const. of 7 nos. Model School (@ Rs.361.86(L) per school) completed – 5 Nos and handed over Ongoing-2 No Gamariguri – 67%

3.  Const. of 66 Nos. ACR in HS/HSS under RMSA Completed 62 Nos. 4 nos withdrawn and is under construction by the SMDC.

4.  Const. of 7 Nos. of Girls Hostel ongoing 5 Nos. Completed-- 1, not started -1

5.  Const. of 100 bedded Girls Hostel under MSDP at Kalgachia- 62%& ITI, Barpeta 75% respectively.

6.  Construction of Local Audit Building at Barpeta -32% (Shifting of HT line require) Estimate submitted, not yet sanctioned)

Judicial Deptt.

7.  Cont. of ADR centre under 13th Finance 15% (Shifting of HT line require)

Estimate submitted, not yet sanctioned)

8.  Raising low site judiciary residence complex

Krishna nagar, Barpeta 85%

9.  RCC 3 storied Building Grade-I 15 %

10.  Const. of three storage building Grade-II 45%

11.  Const. Of Multi Storied Judicial Court Building,

12.  Family Court. 35%

Medical & Health Department:-

13.  Strengthening /Renovation of Sorbhog Subsidiary health Centre 90%

14.  Const. Of Dining Part (1st Floor) of Male Hostel of FAAMC & H, BPTA 90%

15.  Const. Of Dining Part (1st Floor) of Female Hostel of FAAMC & H, BPTA 100%

16.  Const. of second floor Double Seater of Female Hoster at FAAMC 85%

17.  Const./Up gradation of AYUSH OPD Centre at Howly CHC 65%

G.A.D.:-

18. Const. Of Bajali Rev. Circle Office 44%

19. Const. of Circle Office Building, (Ground floor), Barpeta 15%

20. (i) Impvt. of existing Circuit House at Barpeta. 40%

(ii) Impvt.of Circuit House boundary Wall. 15%

(iii) Renovation & repairing existing Circuit House at Barpeta 90%

Different works:-

21. Const. of Inspection Bunglow at Baghmarachar, Baghbar 45%

22. Const. of 2 storied Inspection Bunglow at Kachomara, Chenga 30%

SPORTS:-

23. Rajib Gandhi Sports Complex in 16 dev. Blocks of Barpeta district 30%

CRPF, ARMY CAMP WORK:-

24. Const. of Sentry Post (3 nos) & Guard Room (5 nos)at 10th BN CRPF camp Howly 15%

25.Repair/Renovation of officer’s Mesh at 1th BN CRPF camp, Howly BTC 50%

26.Repair/Renovation of existing security barrack etc. at 10th BN CRPF camp,

At Patacharkuchi in Barpeta district. 52%

NLCPR:-Construction of Chandi Baruah Stadium 70%. No progress has been made due to non-receipt of payment.

The Chairman asked the Asstt Executive Engineer PWD (B) Barpeta to reassess the progress of works of ChandiBarua Stadium under NLCPR. The Executive Engineer PWD (B) will prioritised the schemes which will be completed by March/2017.

(Action-All AEE PWD(R)

4.A.H&Vety: As reported by DVO the progress of work under various schemes in the district is as follows:

Component / Scheme / Activities / Annual Target (2016-17) / Achievement during the month / Cumulative Total for the month
1 / 2 / 3 / 4 / 5 / 6
Livestock Dev. Component / NPCBB / 1.No of AI Centre Covered / - / 69 / 69
2.LN2 received / - / 1962.78 lt / 10085.18 lt
3.LN2 production / - / - / -
4.LN2 Distributed / - / 1682 lt / 10039 lt.
5.F.S Received / - / 76955 doses / 295967 doses
6. No of AI done / - / 2971 nos / 12100 nos
7.No of Calf born / - / 1260nos / 6430 nos

As reported by the DVO Vaccination camps are held during flood season as a preventive measure. As reported there are 200 nos of Cattle lost in the district during flood.

(Action-D.VO. A.H & Vety)

5. Water Resource Deptt: As reported by the Executive Engineer, Barpeta Water Resources Division, Barpeta the status of progress of various ongoing work is highlighted below-

Sl No / Name of Scheme / Estimated amount / Physical progress / Financial progress / Remarks
1 / Immediate measures to close breach by construction of retirement on R/b of river Brahmaputra at Fulbari including pro-siltation measures under SDRF for 2013-14 / 417.03 L / 80% / Nil / Work in progress
2 / Measures to M/E along R/B of river Pahumara from Kathalmuarighat to BB PWD road on R/B and to Noukuchi village on L/B (recoupment of damaged section due to change of river course at different reaches) for 2013-14 under SDRF) / 98.51 L / 90% / Nil / Do
3 / Immediate measures to close breach at 9th km (Mairambhita)including recoupment of damage section at different reaches of M.E. along B/B of river Pohumara from Kathalmurighat to Rly line under SDRF for 2014-15 / 142.63 L / 90% / Nil / Do
4 / Immediate measure for recoupment of flood damage of B/dyke from Bahari to Baghbar at different breaches under SDRF for 2014-15. / 458.29 L / 35% / Nil / Work in progress
5 / Protection of B/B of river Morachowlkhowa at various locations including construction of short retirement at ch. 2.20 km and ch. 5.30 km of Kadong extension embankment and at ch. 5.10 km and widening at ch. 3.20 km of Morachowlkhowa R/B embankment. / 344.00 L / 70% / 176.90 L / Work in progress.
6 / Protection of Pampara, Pub Mahchora, Kachumara Alopati Magarchar and its Adjoining Area from the erosion of Brahmaputra under RIDF-XX / 850.00 L / 40% / Nil / Work in progress.
7 / Anti Erosion Measures to protect Pachim Moinbori area from the erosion of Aai-Manas under RIDF-XX / 640.02L / 10% / Nil / Collection of materials in progress
8 / Pro Siltation Measures in Deferent reaches on both Banks of River Deojara and Kaldia(Review) under RIDF-XX / 681.21 / 25% / Nil
9 / Protection of B/B from the erosion of River Bhelengi at deferent reaches / 651.33 / 10% / Nil / AA & TS accorded E- tendering started

Under SDRF