November 2006doc.: IEEE 802.11-06/1674r0
IEEE P802.11
Wireless LANs
Date: 2006-11-07
Author(s):
Name / Company / Address / Phone / email
Peter Ecclesine / Cisco Systems / MS SJ-10-5
170 W. Tasman Dr., San Jose, CA95134-1706 / +1-408-527-0815 /
Minutes from Nov7th 2006 TGy Teleconference Call
Agenda:
1)Call to order & Roll call
2)Approval/discussion of telcon agenda
3)IEEE Patcom Statement reading (
4)Summary of progress since the Oct 24th telecon
5)Review of P802.11y Draft D0.01 Technical Comments received and draft changes indicated. 06/1609r2 is the TR comment database. Revised versions of 06/864, 06/955, 06/1432
6)Discussion of any other items – next meeting 14 November 08:00 CT
7)Adjourn at or before 16:00 ET
Proceedings:
- Chair calls telecon to order 13:01 ET
- Roll call
- Chair reviews proposed telecon Agenda and asks for approval of same
- Hearing no objections, the telecon agenda is approved
- Chair reads IEEE patent policy statement (Patcom Statement)
- Chair asks: "Are you aware of, and understand the IEEE patent policy? If not refer the correct section or IEEE Patcom URL: ”
- Chair asks: “..does anyone not understand the IEEE patent policy as read?" No reply is heard
- Chair asks: “Are there matters that the WG chair needs to be informed of?” No reply from those on the call
- Summary of progress and discussions/emails since last telecon calls
Discussion and Review of WG technical review comments on D0.01
- Review 06/1432r1 Extended Channel Switch Announcement
- Motion: Move to accept 06/1432r1 as written and instruct the editor to replace the 06/1432r0 text with this text in the creation of D0.02
- Moved: VictoriaP
- Seconded: ScottB
- No discussion
- Approved by unanimous assent
- Review 06/864r4 3650 MHz Mobile Service Enablement
- Scott B proposes to replace “base station” with “enabling station” everywhere in the draft
- There is unanimous agreement to do so
- Annex A, p9 A.4.17 should be DSE functions
- Discussion of A.4.17 concludes that MS1 is Fixed station operation, MS2 is Enabling station operation, and MS3 is Dependent station operation, with Status CFy:O,3
- Enabling station creation of BSA, and Enabling station operation with DSE become MS2.1 and MS2.2, with Status MS2:M
- 11.10.3 changes reviewed, and it was agreed to add an additional statement after the last statement:
- -Every dependent STA shall count the sum of the changes to dot11TransmittedFragmentCount, dot11MulticastTransmittedFrameCount and dot11ReceivedFragmentCount, and create a Probe Response DSE having the enabling station’s DSE registered location element and having the Dependent STA bit set to TRUE. This Probe Response shall be scheduled for transmission to self whenever another [256] changes have been counted.
- Motion: Move to accept 06/864r4 with the above changes and instruct the editor to replace the 06/864r3 text with this text in the creation of D0.02
- Moved: VictoriaP
- Seconded: ScottB
- No discussion
- Approved by unanimous assent
- Review 06/955r3 OFDM PHY 3650 MHz Band
- OF2.19.3.2 is for CCA-ED Mode 2
- Six typos in OF3.3.13, 14, 15, PF4.14, 15, 16 as REV-ma D9.0 forces numbering change to become OF3.2.7
- Motion: Move to accept 06/955r3 with the above changes and instruct the editor to replace the 06/955r2 text with this text in the creation of D0.02
- Moved: VictoriaP
- Seconded: RichK
- No discussion
- Approved by unanimous assent
- Long discussion of required channel widths for Fixed (MS1), Enabling (MS2) and Dependent (MS3) Stations. Agreement to use the 5.2.7 Licensed operation in shared bands paragraphs as the place to specify these requirements, then adjust Annex A PICs accordingly. Current PICS states 20 MHz must be supported by all, 10 MHz is mandatory for enabling stations, 5 MHz is mandatory for enabling and dependent stations.
- Chair will post a separate mail on TGy list to focus discussion of this topic.
Update the WG internal technical review comment database
- Motion: Move to update 06/1609r3 noting these comment resolutions and document numbers with changed text
- Moved: ScottB
- Seconded: VictoriaP
- No discussion
- Approved by unanimous assent
Actions Going Forward..
- Discussion of coming November Plenary Session, especially Nov 14th 08:00-10:00 meeting that does not overlap TGn, and where we should get agreement on all PHY matters.
- Chair request motion to adjourn telecom at 14:52 ET
Motion: Adjourn the telecon
Mover: Scott Blue
2nder: Victoria Poncini
Motion carries: Meeting adjourned at 53 minutes past
- Attendance:
Date of Conference Call
Attendee / Nov 7thPeter Ecclesine / X
Victoria Poncini / X
Scott Blue / X
Dan Lubar / X
Rich Kennedy / X
Jim Raab / X
Naveen Kakani / X
References:
FCC 05-56 ( )
IEEE 802.11 Drafts (in IEEE Member Area)
P802.11-REVma-D9.0.pdf
P802.11y-D0.01.pdf
TGy Reference Docs: (in ftp.ieeewirelessworld.com)
11-06-0571-00-000y-cbp-tg-telecon-minutes-19-april.doc
11-06-0607-00-000y-TGy-telecon-minutes-3May.doc
11-06-0668-01-000y-3650-3700-mhz-fcc-action.ppt
11-06-0680-01-000y-may-chairs-report.ppt
11-06-0740-00-000y-joint-tgy-rr-tag-may-minutes.doc
11-06-0855-03-000y-Annex-and-J-3650-MHz-band.doc
11-06-0863-02-000y-tgy-june-14th-2006-conference-call-minutes.doc
11-06-0864-04-000y-3650-mhz-mobile-service-enablement.doc
11-06-0867-02-000y-references-mobile-service-enablement.doc
11-06-0873-00-000y-tgy-june-28th-2006-conference-call-minutes.doc
11-06-0922-00-000y-tgy-july-11th-2006-conference-call-minutes.doc
11-06-0955-03-000y-ofdm-phy-3650-mhz-band.doc
11-06-1023-01-000y-proposal-tgy.ppt
11-06-1024-02-000y-tgy-july-chairs-report.ppt
11-06-1120-00-000y-Minutes-from-San-Diego-Plenary-2006.doc
11-06-1374-00-000y-aug15th-and-aug29th-2006-conference-call-minutes.doc
11-06-1427-00-000y-sept12th-2006-conference-call-minutes.doc
11-06-1432-01-000y-extended-channel-switch-announement-normative-text.doc
11-06-1433-00-000y-extended-channel-switch-announement-presentation.ppt
11-06-1466-01-000y-TGy-September-chairs-report.ppt
11-06-1536-00-000y-proprosed-draft-revision.doc
11-06-1537-00-000y-melbourne-minutes-september.doc
11-06-1561-00-000y-tgy-sept-26th-2006-conference-call-minutes.doc
11-06-1609-03-000y-tgy-internal-review-comment-submissions.xls
Acronyms/Abbreviations
DSE – dependent station enablement
CCA – Clear Channel Assessment
ED – Energy Detect
CSMA/CD – Carrier Sense Multiple Access/Collision Detect
DFS – Dynamic Frequency Selection
TPC – Transmit Power Control
CBP – Contention-Based Protocol
LCI – Location Configuration Information
STA – Station
CSA – Channel Switch Announcement
PICS – Protocol Implementation Conformance Statement
HAGM – Height Above Ground in Meters
Submissionpage 1Peter Ecclesine, Cisco Systems