April 2008doc.: IEEE 802.11-08/0470r1
IEEE P802.11
Wireless LANs
Date: 2008-4-22
Author(s):
Name / Company / Address / Phone / email
Peter Ecclesine / Cisco Systems / 170 W. Tasman Dr.
MS SJ-10-5
San Jose, CA 95134-1706 / +1-408-527-0815 /
Rich Kennedy / OakTree Wireless/ETS-Lindgren / Austin, TX / +1-281-222-6299 /
Minutes from April 22nd 2008 TGy Teleconference Call
Agenda:
Preliminary22 April Agenda:
1) Roll call
2) Approval of agenda
3) "Are you aware of, and understand the IEEE patent policy",
if not "Refer the correct section or IEEE Patcom URL"
4) Review and approve1 April teleconf minutes,08/0447r1
5)Review of comment validity rules(
6) Discussion ofP802.11yD10.0 (in the member's area)and D10Comment spreadsheet 08/0467r0, andgoing to recirculation SB.
7)Plansto workuntil it ends
8) Any other discussion – nextteleconf29 April 13:00 ET will be cancelled if P802.11y SB recirculationis underway
9) Adjourn at or before14:30 ET
Proceedings:
- Chair calls telecon to order 13:05 ET
- Roll call – Chair Peter Ecclesine (Cisco Inc.),Dan Lubar (RelayServices), Charles Cook (Quest), Dick Roy (Connexis
- Chair reviews proposed telecon Agenda and modifications and asks for approval of same.
- Hearing no objections, the telecon agenda is approved.
- Chair asks: "Are you aware of, and understand the IEEE patent policy? If not refer the correct section or IEEE Patcom URL: ”
- Chair asks: “..does anyone not understand the IEEE patent policy?" No reply is heard.
- Chair asks: “Are there matters regarding essential patent claims that the WG chair should be made aware of?” No reply is heard.
- (notes taken by Dan Lubar and edited by Peter Ecclesine)
- Document Standards Board Operations Manual section 5.4.3.2 Recirculation reviewed (Paragraph from url in email)
Comments from 2nd recirc (2001, 2002) reviewed to allow review of new comment 3002
Prior ballot resolution status review (Accept In Principle vs Accept)
Among those is comment 52. Changed from Accept In Principle to Accept because commenter was satified with resolution, and the changed text was recirculated in recirc-1.
Detail of SB-OM 5.4.3.2: Noted that scope of 11y recirc-3 are
- comments from prev round recirc (2001, 2002) or
- direct changes to document, or text whose meaning is changed by those changes (D10 Annex I)
Discussion of revcom & excom report contents
MyBallot system is a read only system (i.e., don't post until you are done)
It is noted on the call that there were no other comments on the sentence changed by comment 52 in any 11y recirc
Further discussion of the origin of comment 52. Review of Clause 17.3.8.3.1 language. Reference to clause 5's language
Discussion of the fact that 11y has no QoS data frames.
Response to 3002 discussed (not out of scope, but reject).The why's and when's of the ballots in question are again discussed.
Three things that are needed to finish our work.
- MyBallot response, write up motion for vote on next week's call,
Roll call strawpoll of how to treat comment 3002 3-0-0 to reject - Report to ExCom
- Report to RevCom
- Chair asked if there was any further discussion. None heard.
- Dick R moved to adjourn, Dan L seconded, and no one objected to the motion, so we adjourned at 13:55 ET.
References:
FCC 05-56 ( )
FCC 07-99 ( )
IEEE 802.11 Drafts (in IEEE 802.11 Member Area)
IEEE Std. 802.11-2007
P802.11k-D13.0
P802.11r-D9.0
P802.11y-D10.0.pdf
TGy Reference Docs:
11-06-0571-00-000y-cbp-tg-telecon-minutes-19-april.doc
11-06-0607-00-000y-TGy-telecon-minutes-3May.doc
11-06-0668-01-000y-3650-3700-mhz-fcc-action.ppt
11-06-0680-01-000y-may-chairs-report.ppt
11-06-0740-00-000y-joint-tgy-rr-tag-may-minutes.doc
11-06-0855-03-000y-Annex-and-J-3650-MHz-band.doc
11-06-0863-02-000y-tgy-june-14th-2006-conference-call-minutes.doc
11-06-0864-04-000y-3650-mhz-mobile-service-enablement.doc
11-06-0867-02-000y-references-mobile-service-enablement.doc
11-06-0873-00-000y-tgy-june-28th-2006-conference-call-minutes.doc
11-06-0922-00-000y-tgy-july-11th-2006-conference-call-minutes.doc
11-06-0955-03-000y-ofdm-phy-3650-mhz-band.doc
11-06-1023-01-000y-proposal-tgy.ppt
11-06-1024-02-000y-tgy-july-chairs-report.ppt
11-06-1120-00-000y-Minutes-from-San-Diego-Plenary-2006.doc
11-06-1374-00-000y-aug15th-and-aug29th-2006-conference-call-minutes.doc
11-06-1427-00-000y-sept12th-2006-conference-call-minutes.doc
11-06-1432-01-000y-extended-channel-switch-announement-normative-text.doc
11-06-1433-00-000y-extended-channel-switch-announement-presentation.ppt
11-06-1466-01-000y-TGy-September-chairs-report.ppt
11-06-1536-00-000y-proprosed-draft-revision.doc
11-06-1537-00-000y-melbourne-minutes-september.doc
11-06-1561-00-000y-tgy-sept-26th-2006-conference-call-minutes.doc
11-06-1609-04-000y-tgy-internal-review-comment-submissions.xls
11-06-1830-00-000y-dse-in-licensed-band-operations.doc
11-06-1675-02-000y-tgy-November-chairs-report-ppt.ppt (from Dallas Plenary)
11-06-1865-00-000y-tgy-brief-intro-to-tgy.doc
11-06-1871-00-000y-TGy-2006-Dallas-Plenary-Minutes.doc
11-06-1934-05-000n-tgn-opening-report-london-jan-07
11-07-0008-09-000y-tgy-lb94-comment-spreadsheet
11-07-0098-03-000y-tgy-january-chairs-report
11-07-0121-00-000y-tgy-meeting-minutes-from-jan-2007-london-interim-session
11-07-0224-00-000y-TGy-Jan-30th-Telecon-Minutes.doc
11-07-0245-02-000y-TGy-LB94-7-10-11-Submission.doc
11-07-0251-00-000y-TGy-February-13th-Telecon-Minutes.doc
11-07-0270-00-000y-TGy-LB94-3-4-5-6-9.8-Submission.doc
11-07-0271-01-000y-11-07-0271-00-000y-TGy-LB94-a-d-i-j-submission-doc.doc
11-07-0272-00-000y-phy-comments.doc
11-07-0282-00-000y-TGy-LB94-17-etc-Submission.doc
11-07-0291-00-0007-TGy-February-27-telecon-minutes.doc
11-07-0373-01-000y-tgy-march-opening-report
11-07-0392-00-000y-tgy-redline-between-draft-d1-0-and-d1-1
11-07-0395-00-000y-tgy-meeting-minutes-mar-2007-orlando-plenary
11-07-0401-03-000y-long-slottime-option-rtscts-procedure
11-07-0473-00-000y-tgy-lb94-submission-editors-resolutions
11-07-0479-00-000y-tgy-redline-between-d1-0-and-d1-2
11-07-0602-06-000y-d2-comments
11-07-0603-01-000y-lb104-dse-reporting-cid-1093
11-07-0673-03-000y-lb104-non-editorial-comments
11-07-0674-04-000y-lb104-editorial-comments-submission
11-07-0679-04-000y-tgy-may-opening-report
11-07-0783-01-000y-meeting-minutes-may-2007-montreal-interim
11-07-0801-01-000y-3-and-11-14-submission
11-07-0821-00-000y-tgy-may-closing-report
11-07-1974-01-000y-tgy-june-5th-telecon-minutes.doc
11-07-2038-02-000y-tgy-june-26th-telecon-minutes.doc
11-07-2060-00-000y-tgy-july-3rd-telecon-minutes.doc
11-07-2066-01-000y-coexistence-assurance
11-07-2105-00-000y-july-10th-telecon-minutes
11-07-2143-03-000y-tgy-july-opening-report
11-07-2197-00-000y-discussion-on-cca-ed
11-07-2208-02-000y-802-11y-conditional-sponsor-ballot-report
11-07-2263-00-000y-tgy-july-closing-report
11-07-2264-00-000y-tgy-redline-between-draft-3-2-and-3-1
11-07-2268-00-000y-tgy-redline-between-draft-4-0-and-3-0
11-07-2353-01-000y-august-28th-telecon-minutes.doc
11-07-2366-00-000y-tgy-sept-4th-telecon-minutes
11-07-2382-00-000y-lb109-non-editorial-comments
11-07-2383-01-000y-lb109-editorial-comments
11-07-2384-00-000y-lb109-dse-comments
11-07-2464-01-000y-tgy-sept-opening-report
11-07-2480-00-000v-lb108-ecsa-comment-resolutions
11-07-2505-00-0000-meeting-minutes-sept-2007-waikoloa-interim
11-07-2571-00-000y-tgy-d4-0-submission-for-mib-changes
11-07-2579-00-000y-redline-between-draft-4-2-and-4-0
11-07-2623-04-000y-D5-comments.xls
11-07-2655-00-000y-tgy-oct-16th-telecon-minutes
11-07-2656-03-000y-LB112-ECSA-comments
11-07-2660-00-000y-october-23rd-telecon-minutes
11-07-2683-03-000y-lb112-submission-for-non-ecsa-comments
11-07-2702-00-000y-tgy-oct-30th-telecon-minutes
11-07-2724-00-000y-tgy-nov-6th-telecon-minutes
11-07-2752-02-000y-tgy-nov-opening-report
11-07-2753-02-000y-tgy-nov-closing-report
11-07-2864-00-000y-proposed-draft-text-for-action-no-ack-brianh
11-07-2896-00-000y-redlined-draft-p802-11y-d5-2-compared-to-draft-p802-11y-d5-1
11-07-2902-00-000y-redlined-draft-p802-11y-d6-0-compared-to-draft-p802-11y-d5-0
11-07-2945-00-000y-d6-comments
11-07-2951-00-000y-lb116-comments-submission
11-07-2956-00-000y-Dec-11th-telecon-minutes
11-07-2958-00-0007-802.11y-Sponsor-Ballot-Report
11-08-0080-01-000y-tgy-jan-opening-report
11-08-0099-00-000y-january-2008-interim-meeting-minutes
11-08-0123-00-000y-tgy-jan-closing-report
11-08-0226-06-000y-d7-comment-spreadsheet
11-08-0244-00-000y-dse-power-constraint
11-08-0245-00-000y-february-19th-telecon-minutes
11-08-0250-00-000y-redlined-draft-p802-11y-d7-1-compared-to-draft-p802-11y-d7-0
11-08-0254-00-000y-tgy-february-26th-telecon-minutes
11-08-0255-00-000y-redlined-draft-p802-11y-d8-0-compared-to-draft-p802-11y-d7-0
11-08-0277-04-000y-d8-comments-spreadsheet
11-08-0318-01-000y-tgy-march-report
11-08-0319-02-000y-802-11y-mar-conditional-sponsor-ballot-report
11-08-0359-00-000y-march-2008-plenary-meeting-minutes
11-08-0443-03-000y-d9-comments-spreadsheet
11-08-0447-01-000y-april-1st-telecon-minutes
11-08-0467-00-000y-d10-comments-spreadsheet
11-08-0470-00-000y-april-22nd-telecon-minutes (this document)
Acronyms/Abbreviations
CBP – Contention-Based Protocol
CCA – Clear Channel Assessment
CSA – Channel Switch Announcement
CSMA/CD – Carrier Sense Multiple Access/Collision Detect
DFS – Dynamic Frequency Selection
DSE – dependent station enablement
E-CSA – Extended Channel Switch Announcement
ED – Energy Detect
LCI – Location Configuration Information
PICS – Protocol Implementation Conformance Statement
STA – Station
TPC – Transmit Power Control
Submissionpage 1Peter Ecclesine, Cisco Systems