MCH SOUTH WING HVAC REFURBISHMENTPROJECT NO: 5244/A4S-072/966199
university of california, san diego
PREQUALIFICATION QUESTIONNAIRE
For
B- GENERAL BUILDING CONTRACTOR
MCH SOUTH WING HVAC REFURBISHMENT
5244/A4S-072/966199
SUBMITTED BY:
please enter your company name here
UNIVERSITY OF CALIFORNIA, SAN DIEGO
CAPITAL PROGRAM MANAGEMENT
10280 NORTH TORREY PINES ROAD
LA JOLLA, CA 92037
ISSUE DATE: WEDNESDAY, MARCH 7, 2018
MANDATORY PREQUALIFICATION MEETING: THURSDAY, 1:30 P.M., MARCH 15, 2018
MANDATORY MEETING LOCATION: CPM, LARGE CONFERENCE ROOM, SUITE 466
SUBMITTALS DUE: WEDNESDAY, MARCH 21, 2018
(Where a time period is given, such as the last ten [10] years, the period is to be measured backwards from the date this prequalification questionnaire is required to be submitted to the University of California at San Diego.)
Note: Submission of an incomplete and/or unclear Prequalification Questionnaire may result in the determination of the prospective Contractor as NON-PREQUALIFIED.
SUBMITTED BY:
(Name and Title) Printed or Typed
(Signature)
(Firm Name. If a Joint Venture, state name if JV Entity)
(Contact Name for all notices and correspondence)
(Address)
(City, State, Zip Code)
______
(Telephone Number)(Facsimile Number)
(E-mail Address)
Each prospective Contractor must have the following California General Building Contractor’s License:License Classification: B, current, active and in good standing with the California Contractor’s State License Board on the date and time of the Prequalification Questionnaire submittal is due.This Prequalification Questionnaire with all portions completed, including required attachments must be submitted.
Each prospective Contractor must answer all of the following questions and provide all requested information, where applicable. Any prospective Contractor failing to do so may be deemed non responsive and not responsible with respect to this Prequalification at the sole discretion of the University. Each prospective Contractor must submit three (3)printed sets andone (1) flashdrive with complete submittal of the questionnaire. All Contractors that have submitted a Prequalification Questionnaire will be notified in writing of either successfully or not successfully achieving prequalification status. The decision of the University is final and is not appealable within the University of California system.
All information submitted for Prequalification evaluation will be considered official information acquired in confidence, and the University will maintain its confidentiality to the extent permitted by law.
It is critical that the prospective Contractor complete all information required herein accurately, completely, truthfully and to the best of their knowledge. Ambiguous or incomplete information may lead to an unfavorable rating and subsequent status as non-prequalified.
WHERE NECESSARY, COPY THE FORMS IN THIS PACKAGE. USE ONLY THESE FORMS.
1.PREQUALIFICATION DECLARATION
I, ______, hereby declare that I am the
(Printed Name)
______of ______
(Title)(Name of Firm)
submitting this Prequalification Questionnaire; that I am duly authorized to sign this Prequalification Questionnaire on behalf of the above-named firm; and that all information set forth in this Prequalification Questionnaire and all attachments hereto are, to the best of my knowledge, true, accurate and complete as of its submission date.
The undersigned declares under penalty of perjury that all of the prequalification information submitted with this form is true and correct and that this declaration was executed in
______(County), ______, (State)
on ______(Date).
______
(Signature)
2.ATTENDANCE AT MANDATORY PREQUALIFICATION CONFERENCE
Did a representative of your firm attend the Mandatory Prequalification Conference at the University of California, San Diego, La Jolla?
YES NO
General ContractorPage 1 of 25Prequalification Questionnaire
GC P/Q Quest
(UCSD Rev. 10/04/17)
MCH SOUTH WING HVAC REFURBISHMENTPROJECT NO: 5244/A4S-072/966199
university of california, san diego
Name/names of those attending: ______
Date of Meeting Attended:______
3.LICENSE AND REGISTRATION
A.Does your firm hold the following California contractor's license, which is current, valid, and in good standing with the California Contractor's State License Board?
License Classification: B - General Building Contractor
YESNO
1.If the entity submitting this prequalification questionnaire is a Joint Venture, does the Joint Venture entity itself currently hold a (B – General Building Contractor) California contractor's license, which is current, valid, and in good standing with the California Contractor's State License Board?
YESNON/A
B.Provide the following information about your firm's contractor's license:
1.Name of license holder exactly as on file with the California Contractor's State License Board:
______
- License Classification: ______
- License Number: ______
4.Date Issued: ______
5.Expiration Date: ______
C.Is your firm currently registered with the California Department of Industrial Relations pursuant to California Labor Code Section 1725.5 and 1771.1?
YESNO
If Yes, provide Public Works Contractor Registration Number: ______
If currently not registered, it will be required that Contractor and all Subcontractors, regardless of tier be registered at time of bid.
D.Can you truthfully state that your firm's contractor's license hasn’t been suspended or revoked by the California Contractor's State License Board within the last five (5) years?
YES NO
If answer is “No,” explain on attached additional sheets.
If the entity submitting this prequalification questionnaire is a Joint Venture, can the Joint Venture entity truthfully state that no member of the Joint Venture has ever had their firm's contractor's license suspended or revoked by the California Contractor's State License Board?
YES NO N/A
If answer is “No,” explain on attached additional sheets.
E.Has a complaint ever been filed with the Contractor’s State License Board against your company that required a formal hearing or inquiry?
YES NO
F.Does your firm have experience utilizing CPM logic, Primavera Project Planner scheduling software on your projects and would you utilize this experience on this project?
YES NO
If“No,” name the software application(s) used or the software application you would propose for use on this project for scheduling.
G.Did your firm complete and submit the UC San Diego Capital Program Management Company Registration form located on our website (
YES NO
General ContractorPage 1 of 25Prequalification Questionnaire
GC P/Q Quest
(UCSD Rev. 10/04/17)
MCH SOUTH WING HVAC REFURBISHMENTPROJECT NO: 5244/A4S-072/966199
university of california, san diego
4.SURETY
Prospective Contractor desiring to be prequalified is informed that they will be subject to and must fully comply with all bid conditions including 100% payment and 100% performance bonds.
Prospective Contractor shall submit the below form, signed by representative of surety and notarized. If firm has used current surety for less than ten years, list surety(ies) previously used and indicate number of years used to demonstrate ten (10) complete years of surety history.
A.Is the surety to be used listed in the latest published State of California Department of Insurance list of Insurance Organizations Authorized by the Insurance Commissioner to Transact Business of Insurance in the State of California?
YES NO
B.Is the prospective Contractor able to obtain bonding up to and including the cost for this construction contract estimated at $600,000of which no more than 50% is currently committed to other projects?
YES NO
1.If the entity submitting this prequalification questionnaire is a Joint Venture, is the Joint Venture entity itself able to obtain bonding up to and including the cost for this construction contract estimated at $600,000 of which no more than 50% is currently committed to other projects?
YES NO N/A
C.Is it true that the surety has not paid out any monies for the construction activities of the prospective Contractor whatsoever within the last ten (10) years?
YES NO
If answer is “No,” explain on attached additional sheets.
1.If the entity submitting this prequalification questionnaire is a Joint Venture, is it true that the surety has not paid out any monies for the construction activities of any member of the Joint Venture within the last ten (10) years?
YES NO N/A
D.How long has the Prospective Contractor been with this surety? years
E.Surety Declaration:
Provide this Declaration of your surety(ies) for completion. Do not have the surety submit this information directly to the University.
The undersigned declares under penalty of perjury that all of the above surety information is true and correct and that this declaration was executed in
County, California, on (date).
(Signature)
(Name and Title - Printed or Typed)
(Representing [Surety Name])
(Surety License Number)
(Firm Name)
(Address)(City, State, Zip Code)
______
(Telephone Number)(Facsimile Number)
(Email Address)
(ATTACH NOTARIZATION of SURETY REPRESENTATIVE’S SIGNATURE)
General ContractorPage 1 of 25Prequalification Questionnaire
GC P/Q Quest
(UCSD Rev. 10/04/17)
MCH SOUTH WING HVAC REFURBISHMENTPROJECT NO: 5244/A4S-072/966199
university of california, san diego
5.INSURER
Prospective Contractor desiring to be prequalified are informed that they will be subject to and must fully comply with all bid conditions including the following insurance coverage and associated limits.
Prospective Contractor shall submit the below form, signed by representative of insurer and notarized. If firm has used current insurer for less than ten years, list insurer(s) previously used and indicate number of years used to demonstrate ten (10) complete years of insurer history.
A.Is the insurer to be used listed by Best with a rating of A- or better and a financial classification of VIII or better (or an equivalent rating by Standard & Poor’s or Moody's)?
YES NO
Indicate Best Rating:
Indicate Best Financial Classification:
B.Is the prospective Contractor able to obtain insurance in the following limits for each of these construction contracts?
YES NO
1.If the entity submitting this prequalification questionnaire is a Joint Venture, is the Joint Venture entity itself able to obtain insurance in the following limits for each of these construction contracts?
YES NO N/A
Minimum
Comprehensive or Commercial Form General Liability Insurance - Limits of LiabilityRequirement
Each Occurrence - Combined Single Limit for Bodily Injury and Property Damage $1,000,000
Products - Completed Operations Aggregate $2,000,000
Personal and Advertising Injury $1,000,000
General Aggregate - Not Applicable to Comprehensive Form $2,000,000
Business Automobile Liability Insurance - Limits of Liability
Each Accident - Combined Single Limit for Bodily Injury and Property Damage $1,000,000
C.How long has the Prospective Contractor been with this insurer? years
General ContractorPage 1 of 25Prequalification Questionnaire
GC P/Q Quest
(UCSD Rev. 10/04/17)
MCH SOUTH WING HVAC REFURBISHMENTPROJECT NO: 5244/A4S-072/966199
university of california, san diego
- Insurance Declaration:
Provide this Declaration to your insurance carrier for completion. Do not have the carrier submit this information to the University.
The undersigned declares under penalty of perjury that all of the above insurer information is true and correct and that this declaration was executed in
County, California, on (date).
(Signature)
(Name and Title - Printed or Typed)
(Representing [Insurer Name])
(Insurer’s License Number)
(Firm Name)
(Address)(City, State, Zip Code)
(Telephone Number)(Facsimile Telephone Number)
(Email Address)
(ATTACH NOTARIZATION of INSURER REPRESENTATIVE’S SIGNATURE)
General ContractorPage 1 of 25Prequalification Questionnaire
GC P/Q Quest
(UCSD Rev. 10/04/17)
MCH SOUTH WING HVAC REFURBISHMENTPROJECT NO: 5244/A4S-072/966199
university of california, san diego
6.CONSTRUCTION EXPERIENCE
Submit Project Data on a minimum of three (3) and a maximum of five (5)comparable projects successfully completed within the last ten (10) years constructed in the United States of America,two of which were constructed in the State of California.
A comparable project is defined as having a construction cost at the bid date of at least $600,000 or a total of $1,800,000 for the projects submitted, and the following example building types:
- Hospital or Clinical medical facilityunder OSHPD jurisdiction,
- Addition to an existing hospital or clinical medical facility while the facility remains in full operation,
- Replacement and/or rehabilitation of existing mechanical systems in a hospital or medical facility while the facility remains in full operations.
Such projects should have possessed the following construction challenges:
- Urban site work with limited construction and staging areas
- Repair of buildings requiring proactive and innovative solutions due to noise, dust, and pedestrian traffic while building is occupied
- Renovations/expansions requiring proactive and innovative solutions due to unknown and/or unforeseen field conditions.
- Project complexity requiring tracking of multiple functions and phases
- Complex phasing plan development and execution
Such projects should include these specific components:
- Coordination with multiple trades working on the site
- HVAC work including the following: Existing air-handler repair and overhaul, humidification, ductwork, water and steam piping, DDC controls, test and balance
- Critical shutdown of smoke evacuation systems for an occupied hospital
A.If the entity submitting this prequalification questionnaire is a Joint Venture, the Joint Venture entity itself must demonstrate adequate previous construction experience. Joint Venture teams newly-formed to pursue this prequalification opportunity are not eligible for prequalification.
B.Listed projects must have been managed and constructed under the business name submitted for prequalification. Projects completed by employees for former employers are not acceptable.
C.Submit the following Project Data Sheets for each project submitted as evidence of your firm's Contractor expertise.
General ContractorPage 1 of 25Prequalification Questionnaire
GC P/Q Quest
(UCSD Rev. 10/04/17)
MCH SOUTH WING HVAC REFURBISHMENTPROJECT NO: 5244/A4S-072/966199
university of california, san diego
PROJECT DATA SHEET
(A separate sheet must be prepared for each project submitted.)
1.Project Name:______
2.Project Location:______
3.Project Description:______
4.Contract Delivery Method:
5. Size (gross square feet): ______
- What was your company’s role on this project?
Prime (General) Contractor
Subcontractor to GC
2nd Tier Subcontractor
3rd Tier Subcontractor
Prime Subcontractor to Owner
Other: ______
List the Business Entity (name) your company used to perform work for this project: ______
7.If the entity submitting this prequalification questionnaire is a Joint Venture, did the Joint Venture entity itself construct and manage this project?
YES NO N/A
8.How is this project comparable to theMCH SW HVAC REFURBISHMENTproject? ______
______
______
______
______
9.Was the project completed within budget?
Cost At Bid:$
Cost At Completion:$
Explanation: ______
General ContractorPage 1 of 25Prequalification Questionnaire
GC P/Q Quest
(UCSD Rev. 10/04/17)
MCH SOUTH WING HVAC REFURBISHMENTPROJECT NO: 5244/A4S-072/966199
university of california, san diego
10.For any differing amount between cost at completion and cost at bid, distribute the sources and/or causes of these changes into the following categories:
Document Problems:$
Unforeseen Conditions:$
Owner Generated Scope:$
Regulatory Agency:$
Other:$
11.Was construction begun and completed within the last ten (10) years?
YES NO
12.Was the project completed within the original contract time or the adjusted contract time?
YES NO
If completion did not occur within the original or the adjusted contract time, indicate elapsed time in whole calendar days between original or adjusted contract time and actual final completion. For projects that have not reached final completion, indicate current status with respect to contract time:
______
13.Did the project include occupied facilities?
YES NO
14.What communications strategies were used by your firm to assist the project team in mitigating the impacts of construction on the occupied facilities? ______
15.What Infection Control measures were carried out on the project? Describe Infection Control means and methods, types of containment barriers, ICRA Permit process, monitoring and maintenance of containment barriers for the project. Include whether infection control specialty subcontractor was used, or whether in-house personnel performed infection control.
______
______
______
16.Was the project for a university or public institution?
YES NO
17.What strategic decisions did your firm contribute to the project which supported the project’s success (e.g. value engineering, phasing, innovation, new technology, etc.)? ______
18.Did the project include adherence to critical path scheduling?
YES NO
19.Did the project include a quality control/quality assurance program?
YES NO
If “Yes,” explain: ______
20.Did the project require the coordination of multiple trades?
YES NO
If “Yes,” explain: ______
21.Did the project require more than one phase?
YES NO
If “Yes,” explain: ______
22.Did project contain existing air-handler repair and overhaul, humidification, ductwork, water and steam piping, DDC controls, test and balance?
YES NO
23.Did project perform critical shutdown of smoke evacuation systems for an occupied hospital?
YES NO
If “Yes,” explain: ______
24.Did the project include California State Fire Marshal review and approval (planning, scheduling and obtaining State Fire Marshal approval of materials, shop drawings, and systems testing)?
YES NO
25.Did the Owner assess any back-charges?
YES NO
If answer is “Yes,” explain: ______
26.Did the Owner assess any liquidated damages?
YES NO
If answer is “Yes,”explain: ______
27.Name of Project Executive:______
Qualifications of this Project Executive:______
______
28.Name of Project Manager: ______
Qualifications of this Project Manager: ______
______
29.Name of Project Superintendent: ______
Qualifications of this Project Superintendent: ______
______
30.Name of Project Engineer: ______
Qualifications of this Project Engineer: ______
______
31.Did your firm self-perform any of the work?
YES NO
If “Yes,”please specify the trades you self-performed or have the capability to self-perform:
______
______
______
Client Firm Name:Client Contact: / Title:
Client Address: / City, State Zip
Client Phone: / Client Fax:
Client E-mail Address:
Architect/Engineer/
Consultants:
Architect/Engineer
Contact Name: / Phone:
Architect/Engineer
E-mail Address:
(Attach additional pages with other pertinent project information as necessary.)
7.NOT USEDIf this project is UNDER $5M, delete the following section keep numbering and insert “Not Used” (“Past Projects for the Regents of the University of California”):
8.NOT USED
General ContractorPage 1 of 25Prequalification Questionnaire
GC P/Q Quest
(UCSD Rev. 10/04/17)
MCH SOUTH WING HVAC REFURBISHMENTPROJECT NO: 5244/A4S-072/966199
university of california, san diego