Machine Shop / Manufacturing

Machine Shop / Manufacturing

Andrew J. W.

Machine Shop / Manufacturing

I am looking to bring my 20 years of experience in the Steel MFG Industry to succeed in a Machine Shop/ Manufacturing Position

Key Skills

— Shop Management Training — Maintaining Quality control — CNC Machining — Manual Machine Operations- — QA/QC/Management —Traceability of heat codes through the Manufacturing Proccess/MTR’S- Print / Design — Computer Knowledge-

Employer Summary

WALKER INDUSTRIES LLC.

President 4/08 to 2/12

As the owner of a company and we made custom steel frame systems for the wireless cellular industry. Along with steel frames, we also produced a variety of custom steel mounts, brackets, pipe attachment systems and antenna mounting systems. We also offered custom flange products.

ATLANTIC MANUFACTURING AND MACHINE CO. INC.

President 1997 to 4/07

Supervised machine shop that made carbon/alloy pipe flange fittings • We had a lot of older machines, manual W&S turrets , Bullard VTL Cutmaster ‘s, Babin bolt circle drills, plus the CNC machine tools. I was the owner operator of this company, and mainly worked in the shop making the products.

PIPING SUPPLIES INC.

Manufacturing Shop - Foreman, Quality Control Manager 1985 to 1997

QA manager in the implementation of the MIL-F-45208 manual • Material Test reports, certificate of compliances • School and training in CNC programming of 2 axis lathes, and 3 axis-milling machines. • Headed Quality Control programs as QA manager. Receiving inspection of materials, in process and final inspection of all parts, and control of non-conforming material. • Full traceability of HT #’s

WEST JERSEY MANUFACTURING INC.

Union Machine Operator 1983 to 1985

Member of the local 322 pipe fitters union • Trained in the operation of Vertical Turning Lathes, production Turret Lathes, Engine lathes, forklifts, mills, drill presses, bolt circle drilling, ironworkers, brakes, metal shears, and metal cutting saws.

CHEWS LANDING MANUFACTURING CO.

Machine Operator 1981 to 1983

Set up and operated metal saw cutting. • Performed stamping and metal marking for traceability of heat codes.

Project Highlights

• Supplied products to National Filtration for the Westinghouse Filter Skid Division. • B&M Oilfield API Pipe Flange contract with Texaco • Chocolate Confection ate Industry products with Mc Carter Corp. • Sub-structure of steel for Kings Run Plaza • PSE&G West Coast Division flange project • Canadian duplex stainless steel flange project • Center arena score board for the Gund Arena, Ohio

Education & Certifications

  • Cherry Hill East High School 1983 Graduate
  • CNC Control training
  • Union training in manual machine operation
  • Quality Control Management Training
  • Drawing & design
  • Welding & Steel fabricating