Compare SP2016 to SP2018.docCreated October 20, 2017

Last Revision by CO Special Provisions: 04/20/18Page 1

SP2016
Number / SP2018
Number / Title / Actiontaken
in SP2018 Book
1 / 1 / CONTACT INFORMATION / No change.
1.1 / 2 / CONTACT INFORMATION AND CLARIFICATION PROCESS / No change.
2 / 3 / PRE-LETTING CONFERENCE / No change.
3 / 4 / SPECIAL PROVISIONS RELATING TO INDIAN EMPLOYMENT / No change.
4 / 5 / EQUAL PAY / No change.
5 / 6 / RESPONSIBLE CONTRACTOR / No change.
6 / 7 / COMPLIANCE WITH TAX LAW REQUIREMENTS / No change.
7 / 8 / REFERENCE INFORMATION DOCUMENTS / No change.
EC / -- / REFERENCE INFORMATION DOCUMENTS (TEMPORARY EROSION CONTROL) / Deleted per Ken Graeve.
8 / 9 / EMERALD ASH BORER COMPLIANCE / Revised per Jim Cownie.
9 / 10 / PARTNERING / Revised by Revised per Jim Cownie & Special Provisions Unit.
10 / 11 / USE OF ADHESIVE ANCHORS / No change.
11 / 12 / TARGETED GROUP BUSINESS (TGB) AND VETERAN-OWNED SMALL BUSINESS / No change.
IDIQ / IDIQ / TARGETED GROUP BUSINESS (TGB) AND VETERAN-OWNED SMALL BUSINESS (IDIQ)
12 / 13 / MINNESOTA REPORT ON JOBS REQUIREMENTS / Revised by Special Provisions Unit.
13 / 14 / ELECTRONIC SUBMISSION OF PAYROLLS AND STATEMENTS AND BIDDERS LISTS FOR FEDERALLY FUNDED PROJECTS / Revised by Charlie Groshens
14 / 15 / ELECTRONIC SUBMISSION OF PAYROLLS AND STATEMENTS AND BIDDERS LISTS FOR STATE FUNDED PROJECTS / Revised by Charlie Groshens
14.1 / 16 / (1103) DEFINITIONS / No change.
IDIQ / IDIQ / (1301) CONSIDERATION OF PROPOSALS (INDEFINITE DELIVERY/INDEFINITE QUANTITY) / No change.
14.2 / 17 / (1301) CONSIDERATION OF PROPOSALS (LANE RENTAL METHOD) / Revised per Jim Cownie.
14.3 / 18 / (1301) CONSIDERATION OF PROPOSALS (A+B METHOD) / Revised per Jim Cownie.
15 / 19 / (1302) AWARD OF CONTRACT / Revised by Revised per Jim Cownie & Special Provisions Unit.
IDIQ / IDIQ / (1305) REQUIREMENT OF CONTRACT BOND / No change.
16 / 20 / (1306) EXECUTION AND APPROVAL OF CONTRACT / No change.
ELLA / ELLA / (1306) EXECUTION AND APPROVAL OF CONTRACT / Updated each fiscal year.
17 / -- / BLANK / Deleted
18 / 21 / (1404) MAINTENANCE OF TRAFFIC & (2563) TRAFFIC CONTROL / Revised per Ted Ulven.
IDIQ / IDIQ / (1404) MAINTENANCE OF TRAFFIC & (2012) TRAFFIC CONTROL / Revised per Ted Ulven.
19 / 22 / (1505) COOPERATION BY CONTRACTORS / No change.
20 / 23 / (1505) COOPERATION BY CONTRACTORS (BRIDGE) / No change.
21 / 24 / (1507) UTILITY PROPERTY & SERVICE / Revised per Jim Cownie.
22 / 25 / (1508) CONSTRUCTION STAKES, LINES & GRADES / No change.
23 / 26 / (1508) CONSTRUCTION STAKES, LINES & GRADES / No change.
24 / 27 / (1508) CONSTRUCTION STAKES, LINES & GRADES / No change.
25 / 28 / (1508) CONSTRUCTION STAKES, LINES & GRADES / No change.
26 / 29 / (1508) CONSTRUCTION STAKES, LINES & GRADES / No change.
27 / 30 / (1514) MAINTENANCE DURING CONSTRUCTION / Deleted Self Propelled Pavement Broom W/Operator line per Jenny Carlson.
28 / 31 / (1601) SOURCE OF SUPPLY & QUALITY / Revised per Jim Cownie.
29 / 32 / (1602) NATURAL MATERIAL SOURCES / No change.
30 / 33 / (1606) STORAGE OF MATERIALS / No change.
-- / 33.1 / (1701) LAWS TO BE OBSERVED (PROMPT PAY AND RETAINAGE) / New write-up for the SP2018 book.
31 / 34 / (1701) LAWS TO BE OBSERVED (WETLANDS) / No change.
32 / 35 / (1701) LAWS TO BE OBSERVED (BUILDINGS REMOVALS OR MOVES) / Revised per Mark Vogel & Jim Cownie.
33 / 36 / (1701) LAWS TO BE OBSERVED (BRIDGE) / Revised per Mark Vogel & Jim Cownie.
34 / 37 / (1701) LAWS TO BE OBSERVED (CULTURAL RESOURCES – FEDERALLY FUNDED) / Revised per Jim Cownie.
35 / 38 / (1701) LAWS TO BE OBSERVED (CULTURAL RESOURCES – STATE FUNDED) / No change.
35.1 / 39 / (1701) LAWS TO BE OBSERVED – CARGO PREFERENCE ACT, USE OF UNITED STATES - FLAGGED VESSELS / No change.
35.2 / 40 / (1701) LAWS TO BE OBSERVED – CERTIFICATION OF NONDISCRIMINATION AGAINST ISRAEL / No change.
36 / 41 / (1706) EMPLOYEE HEALTH & WELFARE / Revised per Jim Cownie.
37 / 42 / (1707) PUBLIC CONVENIENCE AND SAFETY / No change.
38 / 43 / (1712) PROTECTION AND REST. OF PROPERTY / No change.
39 / 44 / (1717) AIR, LAND, AND WATER POLLUTION (CONCRETE GRINDING) / Revised per Jim Cownie.
40 / 45 / (1717)MPCA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION STORM WATER (CSW) PERMIT / Revised by Special Provisions Unit.
41 / 46 / (1717) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FOR TRIBAL LANDS / No change.
42 / 47 / (1718) FURNISHING RIGHT OF WAY / Revised per Jim Cownie.
43 / 48 / IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER POLLUTION CONTROL ACT / Revised per Jim Cownie.
44 / 49 / (1801) SUBLETTING OF CONTRACT / No change.
45 / -- / BLANK / Deleted.
46 / 50 / (1802) TRAINING FOR CONSTRUCTION TRUCK OPERATORS / No change.
48 / 51 / (1803) PROGRESS SCHEDULES / Revised per OCIC.
47 / 52 / (1804) PROSECUTION OF WORK (ADA) / Added (1804) to title so that it matches the 2018 spec book and moved so that it is in the proper order. Revised per Jim Cownie. Revised by Joe Zilka.
49 / 53 / (1803)(1804) LIMITATION OF OPERATIONS - NIGHT CONSTRUCTION / Changed (1803) to (1804) so that it matches the 2018 spec book. Revised per Jim Cownie. Revised by Joe Zilka.
50 / 54 / (1806) DETERMINATION & EXT. OF CONTRACT TIME / Updated for use with 2018 spec book.
IDIQ / IDIQ / (1806) DETERMINATION & EXT. OF CONTRACT TIME / No change.
51 / 55 / (1806) DETERMINATION AND EXTENSION OF CONTRACT TIME (LANDSCAPING) / Revised by Special Provisions Unit.
52 / 56 / (1807) FAILURE TO COMPLETE THE WORK ON TIME / Updated for use with 2018 spec book.
IDIQ / IDIQ / (1807) FAILURE TO COMPLETE THE WORK ON TIME / No change.
IDIQ / IDIQ / (1903) COMPENSATION FOR ALTERED QUANTITIES / No change.
53 / 57 / (1910) COST ESCALATION / No change.
IDIQ / IDIQ / (1910) COST ESCALATION (IDIQ) / No change.
54 / 58 / (2011) CONSTRUCTION SURVEYING / Revised by Special Provisions Unit.
54.1 / 59 / (2011) CONSTRUCTION SURVEYING (METRO) / Revised by Special Provisions Unit.
54.2 / 60 / (2011) CONSTRUCTION SURVEYING (DIGITAL SURFACE MODEL METHOD USING THE AMG-EXCAVATION SYSTEM) / Revised per Rebecca Embacher.
55 / 61 / (2011) CONSTRUCTION SURVEYING FOR ASPHALT BOND BREAKER LAYER UNDER CONCRETE OVERLAYS / No change.
56 / 62 / (2011) AS-BUILTS / Revised by Special Provisions Unit & Anthony Wotzka.
57 / 63 / (2013) ROAD/WEATHER SENSOR AND CABLE / Revised by Special Provisions Unit.
58 / 64 / (2013) ROAD WEATHER INFORMATION SYSTEM (R/WIS) / Revised by Special Provisions Unit.
59 / 65 / (2016) QUALITY MANAGEMENT - PAVER MOUNTED INFRARED TEMPERATURE EQUIPMENT FOR THERMAL PROFILES / Revised per Rebecca Embacher.
60 / 66 / (2016) QUALITY MANAGEMENT SPECIAL – INTELLIGENT COMPACTION (IC) METHOD / Revised per Rebecca Embacher.
IDIQ / IDIQ / (2021) MOBILIZATION / No change.
61 / 67 / (2031) FIELD OFFICE AND LABORATORY / No change.
62 / 68 / (2031) FIELD OFFICE AND LABORATORY – BROADBAND SERVICES / No change.
63 / 69 / (2031) COMBINATION FIELD-LAB OFFICE / Revised by Special Provisions Unit.
64 / 70 / (2041) ON-THE-JOB TRAINING PROGRAM / Revised by Lee Zutz.
65 / 71 / (2051) MAINTENANCE & RESTORATION OF HAUL ROADS / Revised by Special Provisions Unit.
66 / 72 / (2101) CLEARING AND GRUBBING / The first two statements dealing with the bats are to remain as is per Chris Smith. All the rest of the write-up has been deleted per Tina Markeson due to them now being in the 2018 spec book.Revised by Special Provisions Unit.
67 / 73 / (2102) PAVEMENT MARKING REMOVAL / Revised per Ethan Peterson.
68 / 74 / (2103) BUILDING REMOVAL / Revised per Mark Vogel.
69 / 75 / (2103) CONSTRUCTION WASTE MANAGEMENT AND DEBRIS RECYCLING REQUIREMENTS / No change.
70 / 76 / (2104) REMOVING PAVEMENT AND MISCELLANEOUS STRUCTURES / No change.
71 / 77 / (2104) REMOVE AND HAUL TREATED WOOD / No change.
72 / 78 / (2104) REMOVE TANK(HISTORICAL/POSSIBLE TANKS POSSIBLE) / Title changed and revised per Sarah Jarman.
-- / 79 / (2104) REMOVE TANK (KNOWN TANK OR FACILITY) / New write-up for the SP2018 book.
73 / 80 / (2104) ABATE ASBESTOS-CONTAINING PIPES OR CULVERTS / Revised per Mark Vogel.
73.1 / 81 / (2104) ASBESTOS CONTAINING WASTE MATERIAL ABATEMENT
(2104) ASBESTOS DUMP REMOVAL (ASBESTOS CONTAINING WASTE MATERIAL ABATEMENT) / Name changed and revised per Mark Vogel. Also revised by Special Provisions Unit.
74 / 82 / (2104) ASBESTOS AND REGULATED WASTE ASSESSMENT / Revised per Mark Vogel.
75 / 83 / (2104) REGULATED WASTE ASSESSMENT (BRIDGE) / No change.
76 / 84 / (2104) REMOVAL OF ASBESTOS AND REGULATED WASTE (BRIDGE) / Revised per Mark Vogel.
77 / 85 / (2104) REMOVE ASBESTOS AND REGULATED WASTE MATERIAL / Revised per Mark Vogel.
78 / 86 / (2104) HAUL SALVAGED MATERIALS / No change.
79 / 87 / (2104) ABANDON PIPE SEWER / Revised by Special Provisions Unit.
80 / 88 / (2104) REMOVE SEALANT MATERIALS / No change.
81 / 89 / (2104) REMOVESEALANT MATERIALS / No change.
82 / 90 / (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) / Revised by Joe Zilka.
82.1 / -- / BLANK / Deleted.
82.2 / 91 / (2105/2106) EXCAVATION AND EMBANKMENT (DIGITAL SURFACE MODEL METHOD USING THE AMG-EXCAVATION SYSTEM) / Revised per Rebecca Embacher.
-- / 92 / (2105) EXCAVATION & EMBANKMENT / Correction to 2018 spec book.
83 / 93 / (2105) ROCK BLASTING SPECIFICATIONS / Revised by Special Provisions Unit.
84 / 94 / (2105) ROCK EXCAVATION (PRODUCTION BLASTING) / Revised by Special Provisions Unit.
85 / 95 / (2105) SETTLEMENT PLATES / Revised by Special Provisions Unit.
86 / 96 / (2105) CONSTRUCT TURN LANE / Revised by Special Provisions Unit.
87 / 97 / (2105) WEEP TRENCH / No change.
88 / 98 / (2105) SHOULDER TRENCHING / No change.
89 / 99 / (2105) SOIL STABILIZATION GEOGRID / No change.
89.1 / 100 / (2105) GEOTEXTILE FABRIC BOND BREAKER INTERLAYER FOR CONCRETE OVERLAY / Revised per Maria Masten.
90 / -- / (2105) GEOTEXTILE FOR SEPARATION (STABILIZATION) / Deleted per Terry Beaudry. Now in 2018 spec book.
91 / 101 / (2105) CONTROLLED EXCAVATION / Revised by Special Provisions Unit.
91.1 / 102 / (2105) SUBGRADE SOIL MODIFICATION / No change.
92 / -- / (2105) RAILROAD TRACK SUB-BALLAST / Deleted per Jim Weatherhead.
93 / 103 / (2106) EXCAVATION & EMBANKMENT / Deleted the one from the SP2016 book since it is in the 2018 spec book. The one in the SP2018 book corrects the 2018 spec book.
93.1 / -- / BLANK / Deleted.
93.2 / -- / BLANK / Deleted.
94 / 104 / (2112) SHOULDER PREPARATION / Revised by Special Provisions Unit.
94.1 / 105 / (2118) AGGREGATE SURFACING / Deleted the one from the SP2016 book since its in 2018 spec book. The one in the SP2018 book corrects the last pay item description in the 2018 spec book.
95 / -- / (2118) AGGREGATE SURFACING (CV) CLASS __ / Deleted. Now in 2018 spec book.
96 / 106 / (2123) TRACTOR MOUNTED BACKHOE / No change.
97 / 107 / (2123) CRAWLER MOUNTED BACKHOE / No change.
98 / -- / BLANK / Deleted.
99 / -- / (2211) AGGREGATE BASE / Deleted.
99.1 / BLANK / Deleted.
100 / 108 / (2215) RECLAMATION / Deleted the SP2016 write-up per Terry Beaudry. The write-up in the SP2018 book corrects the 2018 spec book.
100.1 / -- / BLANK / Deleted.
101 / -- / (2221)SHOULDER BASE AGGREGATE / Deleted.
102 / 109 / (2231) BITUMINOUS PATCHING MIXTURE / Revised per Greg Johnson.
103 / 110 / (2231) PAVEMENT SEATING / Revised per Greg Johnson and Special Provisions Unit.
104 / 111 / (2231) PAVEMENT CLEANING / Revised per Greg Johnson and Special Provisions Unit.
105 / 112 / (2231) PAVEMENT CRACKING / Revised per Greg Johnson and Special Provisions Unit.
106 / 113 / (2231) BIT. SURFACE (CRACK AND JOINT REPAIR) / Revised per Greg Johnson and Special Provisions Unit.
107 / 114 / (2231) PAVEMENT BREAKING (RUBBLIZING) / Revised by Special Provisions Unit.
108 / -- / BLANK / Deleted.
109 / 115 / (2232) MILLED RUMBLE STRIPS / Revised per Ethan Peterson and by Special Provisions Unit.
110 / 116 / (2232) MILLED RUMBLE STRIPS / Revised per Ethan Peterson.
112 / 117 / (2232) MILLED RUMBLE STRIPS - INTERMITTENT / Revised per Ethan Peterson and moved by Special provisions Unit.
110.1 / 118 / (2232) MILLED SINUSOIDAL RUMBLE STRIPS / Revised per Ethan Peterson.
111 / -- / (2232) MILLED RUMBLE STRIPS (CONCRETE) / Deleted per Ethan Peterson.
111.1 / 119 / (2232) MILLED SINUSOIDAL RUMBLE STRIPS (CONCRETE) / Revised per Ethan Peterson.
112.1 / 120 / (2232) MILLED SINUSOIDAL RUMBLE STRIPS – INTERMITTENT / Revised per Ethan Peterson.
-- / 121 / (2232) MILLED SINUSOIDAL RUMBLE STRIPS (CONCRETE) - INTERMITTENT / New write-up for SP2018 book from Ethan Peterson.
113 / 122 / (2232) MILL AND PATCH BITUMINOUS PAVEMENT (ADA) / Revised by Joe Zilka.
-- / 123 / (2232) MICRO MILL BITUMINOUS PAVEMENT SURFACE / New write-up from Elliot Keyes for the SP2018 book.
114 / -- / (2301) CONCRETE PAVEMENT FOR ALTERNATE BID / Deleted per Maria Masten.
115 / 124 / (2301) CONCRETE PAVEMENT / Revised per Maria Masten.
115.1 / 125 / (2301) DOWEL BAR / No change.
116 / 126 / (2301) DRILL AND GROUT REINFORCEMENT BAR (EPOXY COATED) / Revised by Special Provisions Unit.
117 / 127 / (2301) HIGH PERFORMANCE DOWEL BAR – 1.25 inch / No change.
118 / 128 / (2301) HIGH PERFORMANCE DOWEL BAR – 1.5 inch / No change.
119 / 129 / (2301) CONCRETE PAVEMENT LUGS / No change.
120 / 130 / (2301) SLAB JACKING / No change.
121 / -- / BLANK / Deleted.
122 / 131 / (2302) CONCRETE PAVEMENT REHABILITATION (CPR) / Revised per Maria MastenSpecial Provisions Unit.
123 / 132 / (2302) CONCRETE GRINDING / No change.
124 / 133 / (2302) CONCRETE GRINDING WITH NO INCENTIVES / No change.
125 / 134 / (2331) BITUMINOUS JOINT SAWING AND SEALING / Revised per Greg Johnson and Special Provisions Unit.
126 / 135 / (2331) PAVEMENT JOINT ADHESIVE / Revised per Greg Johnson.
-- / 136 / (2331) BITUMINOUS EMULSION FOR OTTA SEAL / New for SP2018 from Elliot Keyes.
127 / -- / (2331) COLD-IN-PLACE RECYCLED (CIR) BITUMINOUS-AGENCY MIX DESIGN / Deleted per Terry Beaudry. Now in 2018 spec book.
127.1 / -- / (2331) COLD CENTRAL PLANT RECYCLING (CCPR) BITUMINOUS / Deleted per Terry Beaudry. Now in 2018 spec book.
128 / 137 / (2331) MASTIC FOR VOID FILLING / Revised per Elliot Keyes and by Special Provisions Unit.
129 / 138 / (2331) BITUMINOUS PAVEMENT CRACK TREATMENT / Revised per Elliot Keyes. He combined SP2016-129 and SP2016-130 into one write-up for the SP2018 book.
130 / -- / (2331) BITUMINOUS PAVEMENT CRACK TREATMENT CLEAN AND SEAL / Deleted per Elliot Keyes.
130.1 / 139 / (2353) ULTRATHIN BONDED WEARING COURSE (UTBWC) (MSCR) / Revised per Elliot Keyes.
-- / 140 / (2356) BITUMINOUS SEAL COAT AND BITUMINOUS UNDERSEAL / Correction to 2018 spec book.
131 / -- / (2356) BITUMINOUS SEAL COAT / Deleted per Elliot Keyes.
132 / -- / (2356) BITUMINOUS UNDERSEAL / Deleted per Elliot Keyes.
133 / 141 / (2356) OTTA SEAL / Revised per Elliot Keyes.
134 / -- / (2357) BITUMINOUS TACK COAT / Deletedper Elliot Keyes.
135 / 142 / (2357) BITUMINOUS MATERIAL FOR SHOULDER TACK / Revised per Elliot Keyes.
135.1 / -- / (2358) BITUMINOUS PRIME COAT / Deleted by Special Provisions Unit.
136 / -- / BLANK / Deleted.
137 / -- / BLANK / Deleted.
137.1 / 143 / (2360) PLANT MIXED ASPHALT PAVEMENT (MSCR) / Revised per Greg Johnson and by Special Provisions Unit.
138 / -- / BLANK / Deleted.
138.1 / 144 / (2360) PLANT MIXED ASPHALT PAVEMENT (LOCAL AGENCY) (MSCR) / Revised per Greg Johnson and by Special Provisions Unit.
139 / -- / BLANK / Deleted.
139.1 / -- / (2360) PLANT MIXED ASPHALT PAVEMENT FOR ALTERNATE BID (MSCR) / Deleted by Special Provisions Unit.
140 / 145 / (2360) POROUS ASPHALT PAVEMENT / Revised per Greg Johnson and by Special Provisions Unit.
140.1 / 146 / (2360) FINE-GRADED (4.75 mm) ASPHALT MIXTURE / Revised per Greg Johnson and by Special Provisions Unit.
141 / 147 / (2360) PLANT MIXED ASPHALT PAVEMENT - THICKNESS PAYMENT SCHEDULE / Revised per Greg Johnson and by Special Provisions Unit.
141.1 / -- / BLANK / Deleted.
141.2 / 148 / (2363) PERMEABLE ASPHALT STABILIZED STRESS RELIEF COURSE (PASSRC) AND PERMEABLE ASPHALT STABILIZED BASE (PASB) (MSCR) / Revised per Greg Johnson.
142 / -- / BLANK / Deleted.
142.1 / 149 / (2365) STONE MATRIX ASPHALT - SMA (MSCR) / Revised per Greg Johnson.
-- / 150 / (2390) COLD-IN-PLACE RECYCLED (CIR) BITUMINOUS AND COLD CENTRAL PLANT RECYCLING (CCPR) BITUMINOUS / Correction to 2018 spec book.
143 / 150.1 / (2399) PAVEMENT SURFACE SMOOTHNESS / Deleted the write-up from the SP2016 book. That is in the new spec book. The 2399 in the SP2018 book corrects the 2018 spec book.
144 / -- / (2399) PAVEMENT SURFACE SMOOTHNESS FOR ALTERNATE BID / Deleted.
145 / -- / (2406) BRIDGE APPROACH PANELS / Deleted per Maria Masten.
146 / 151 / (2411) CONSTRUCT CONCRETE OR MASONRY PLUG / No change.
147 / 152 / (2411) MECHANICALLY STABILIZED EARTH WALLS WITH PRECAST CONCRETE PANELS / No change.
148 / 153 / (2411) PREFABRICATED MODULAR BLOCK WALL (PMBW) WITH AND WITHOUT SOIL REINFORCEMENT / No change.
149 / 154 / (2442) REMOVAL OF EXISTING BRIDGES / Revised per Chris Smith and by Special Provisions Unit.
149.1 / -- / (2451) STRUCTURE EXCAVATION AND BACKFILLS / Deleted. This is now in the 2018 spec book.
150 / 155 / (2452) STEEL SHEET PILING - TEMPORARY / No change.
151 / 156 / (2461) STRUCTURAL CONCRETE / Revised per Maria Masten.
152 / 157 / (2462) PRECAST CONCRETE / Revised per Maria Masten.
153 / 158 / (2471) STRUCTURAL METALS / Revised per Mark Spafford & Jihshya Lin.
-- / 158.1 / (2472) METAL REINFORCEMENT / Correction to 2018 spec book.
154 / 159 / (2501) PIPE TIES / No change.
155 / 160 / (2501) BULKHEAD CULVERT / No change.
156 / 161 / (2501) PLUG FILL AND ABANDON PIPE CULVERT / Revised by Special Provisions Unit.
157 / 162 / (2501) TRASH GRATE FOR BOX CULVERT / No change.
158 / 163 / (2501) SAFETY APRON / No change.
159 / 164 / (2501) SAFETY GRATE / Revised.
160 / 165 / (2501) CLEAN PIPE CULVERT / No change.
161 / 166 / (2501) PIPE CULVERTS / Revised per Tim Swanson.
161.1 / 167 / (2501) POLYPROPYLENE PIPE CULVERTS / Revised per Andrea Hendrickson and Tim Swanson.
162 / 168 / (2502) SUBSURFACE DRAINS / Deleted S-.1 per Terry Beaudry. That is now in the 2018 spec book. Revised by Special Provisions Unit.
163 / -- / (2502) INTERCEPTOR DRAINS / Deleted per Terry Beaudry. Now in 2018 spec book.
164 / 169 / (2503) PIPE SEWERS / Revised per Tim Swanson.
165 / 170 / (2503) POLYPROPYLENE PIPE SEWERS / Revised per Andrea Hendrickson and Tim Swanson.
166 / 171 / (2503) CONNECT TO EXISTING STORM SEWER / No change.
167 / 172 / (2503) CONSTRUCT BULKHEAD / No change.
168 / 173 / (2503) SLOTTED DRAIN / No change.
169 / 174 / (2503) PLUG FILL AND ABANDON PIPE SEWER / Revised by Special Provisions Unit.
170 / 175 / (2503) 18" STEEL CASING PIPE / No change.
171 / 176 / (2504) CHANGES IN CITY UTILITY SYSTEM / Revised by Special Provisions Unit.
172 / 177 / (2504) RELOCATE HYDRANT AND VALVE / Revised by Special Provisions Unit.
173 / 178 / (2504) INSTALL HYDRANT / Revised by Special Provisions Unit.
174 / 179 / (2504) INSTALL VALVE AND BOX / Revised by Special Provisions Unit.
175 / 180 / (2504) ADJUST VALVE BOX - WATER / Revised by Special Provisions Unit.
176 / 181 / (2504) ADJUST CURB BOX / Revised by Special Provisions Unit.
177 / 182 / (2504) 18" STEEL CASING PIPE / Revised by Special Provisions Unit.
178 / 183 / (2504) POLYSTYRENE INSULATION / Revised by Special Provisions Unit.
179 / 184 / (2506) MANHOLES AND CATCH BASINS / No change.
180 / 185 / (2506) INFILTRATION AND FILTRATION SYSTEMS / Revised per Beth Neuendorf.
181 / 186 / (2506) CLEAN OUT CATCH BASIN / Revised by Special Provisions Unit.
182 / 187 / (2506) CONNECT INTO EXISTING DRAINAGE STRUCTURE / Revised by Special Provisions Unit.
183 / 188 / (2506) CONSTRUCT CONTROL STRUCTURE / Revised by Special Provisions Unit.
184 / -- / (2514) SLOPE PAVING / Deleted. Now in 2018 spec book.
185 / -- / (2515)REVETMENT SYSTEMS / Deleted per Ken Graeve. Now in 2018 spec book.
185.1 / -- / (2521) CONCRETE WALK SPECIAL / Deleted per Maria Masten. Now in 2018 spec book.
186 / 189 / (2521) CONCRETE WALK (ADA) / No change.
187 / 190 / (2531) CONCRETE CURB AND GUTTER (ADA) / No change.
188 / 191 / (2531) CONCRETE CURB DESIGN V (ADA) / No change.
189 / 192 / (2531) TRUNCATED DOMES / No change.
189.1 / 193 / (2533) CONCRETE MEDIAN BARRIERS / Deleted the SP2016 write-up per Michelle Moser and Maria Masten. The one in the SP2018 book is a correction to the 2018 spec book.
190 / 194 / (2533) PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 / Revised per Michelle Moser.
191 / 195 / (2533) PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 - ANCHORED / Revised per Michelle Moser.
192 / 196 / (2533) CONCRETE MEDIAN BARRIER DESIGN 8308 AND 8309 / No change.
193 / 197 / (2533)RELOCATEPORT. PRECAST CONC. BARRIER DESIGN 8337 / No change.
194 / 198 / (2533) RELOCATE PORT. PRECAST CONC. BARRIER DESIGN 8337 - ANCHORED / No change.
195 / 199 / (2533) INSTALL CONCRETE MEDIAN BARRIER / No change.
196 / 200 / (2540) MAIL BOX SUPPORT / No change.
197 / 201 / (2540) RELOCATE MAIL BOX SUPPORT / No change.
198 / 202 / (2554) TRAFFIC BARRIERS / Revised per Michelle Moser.
199 / -- / BLANK / Deleted.
200 / 203 / (2554) TRAFFIC BARRIER DESIGN SPECIAL A / No change.
201 / 204 / (2554) END TREATMENT - ENERGY ABSORBING TERMINAL / No change.
202 / -- / BLANK / Deleted.
203 / -- / BLANK / Deleted.
204 / 205 / (2554) END TREATMENT - TANGENT TERMINAL / No change.
204.1 / 206 / (2554) END TREATMENT – TYPE 31 TANGENT TERMINAL / No change.
205 / -- / BLANK / Deleted.
206 / 207 / (2554) END TREATMENT – FLARED TERMINAL / Revised per Michelle Moser.
207 / -- / BLANK / Deleted.
210 / 208 / (2554) CONNECTING PIN / Revised by Special Provisions Unit.
211 / -- / (2554) POST ASSEMBLY - PLATE BEAM / Deleted per Michelle Moser.
212 / -- / (2554) GUARDRAIL TERMINAL POSTS / Deleted per Michelle Moser.
213 / 209 / (2554) GUARDRAIL POST SEAT / Revised by Special Provisions Unit.
214 / 210 / (2554) T-BARRIER BRIDGECONN. DES. 8318 / Revised by Special Provisions Unit.
215 / 211 / (2554) GUIDE POST - TYPE SPECIAL / No change.
216 / -- / (2554) INSTALL CONCRETE ANCHOR BLOCK / Deleted per Michelle Moser.
217 / 212 / (2554) INSTALL ANCHOR ASSEMBLY - 3 CABLE / Revised by Special Provisions Unit.
218 / 213 / (2554) INSTALL ANCHOR ASSEMBLY-PLATE BEAM / Revised by Special Provisions Unit.
219 / 214 / (2554) WATER FILLED BARRIER / No change.
220 / 215 / (2554) RELOCATE WATER FILLED BARRIER / No change.
221 / 216 / (2554) TENSION CABLE GUARDRAIL / No change.
222 / 217 / (2554) TENSION CABLE GUARDRAIL WARRANTY / No change.
208 / 218 / (2554) IMPACT ATTENUATOR BARRELS / Revised and moved in the SP2018 book per Michelle Moser.
209 / 219 / (2554) RELOCATE IMPACT ATTENUATOR BARRELS / Moved in theSP2018 book per Michelle Moser. Revised by Special Provisions Unit.
223 / 220 / (2554) IMPACT ATTENUATOR / No change.
224 / 221 / (2554) IMPACT ATTENUATOR (C-A-T) / No change.
225 / 222 / (2554) IMPACT ATTENUATOR (QUAD GUARD) / Revised per Michelle Moser.
225.1 / 223 / (2554) IMPACT ATTENUATOR(SMART CUSHION) / No change.
226 / 224 / (2554) RELOCATE IMPACT ATTENUATOR / Revised by Special Provisions Unit.
227 / 225 / (2557) FLEXIBLE PLASTIC GLARE SCREEN / Revised by Special Provisions Unit.
228 / 226 / (2557) TEMPORARY GLARE SCREEN / Revised by Special Provisions Unit.
229 / 227 / (2557) INSTALL CHAIN LINK FENCE / Revised by Special Provisions Unit.
230 / 228 / (2563) TRAFFIC CONTROL SUPERVISOR / Revised by Ted Ulven.
231 / 229 / (2563) INTELLIGENT WORK ZONE SYSTEM / Revised by Ted Ulven.
232 / 230 / (2563) ALTERNATE PEDESTRIAN ROUTE / Revised by Ted Ulven.
233 / 231 / (2563) RAISED PAVEMENT MARKERS TEMPORARY / Revised by Ted Ulven.