07:02 Tuesday, May 2, 2017 1
Iowa Department of Transportation -- Office of Contracts
Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting
------
Bid Order: 001 Type of Work: BRIDGE NEW - PPCB Current DBE Goal Assigned: 1.0%
Hwy/Rte/St: U.S. 63 County: BLACK HAWK
Est'd Cost: $20,000,000 - $30,000,000 2.5% DBE Goal: $500,000 - $750,000 5.0% DBE Goal: $1,000,000 - $1,500,000
DBE Work Pct of Est
------
Concrete Barriers 0.9%
Epoxy Coated Reinforcing Steel 0.8%
Bridge Approaches or Medians 0.8%
Handrail and Barrier Rails 0.8%
Removal of Pavement 0.6%
Manholes and Intakes 0.6%
PCC Sidewalks & Trails (Constr/Removal) 0.5%
Construction Survey 0.4%
Subdrains 0.3%
Temporary / Detour Pavement 0.3%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.3%
Erosion Control (Section 2601) 0.2%
Fencing 0.2%
Reinforcing Steel 0.2%
PC Concrete Drives 0.1%
Curb & Gutter 0.1%
Steps, Walls and Footings 0.1%
Trenched Sanitary Sewer/Service & Rmvl 0.0%
Clear & Grubb 0.0%
Full Depth Finish Patches 0.0%
Safety Closures & Road Closures 0.0%
Guardrail 0.0%
------
Bid Order: 002 Type of Work: BRIDGE REPLACEMENT - CCS Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: 130TH ST County: CLAYTON
Est'd Cost: $300,000 - $600,000 2.5% DBE Goal: $7,500 - $15,000 5.0% DBE Goal: $15,000 - $30,000
DBE Work Pct of Est
------
Epoxy Coated Reinforcing Steel 16.6%
Revetment 9.3%
Handrail and Barrier Rails 3.8%
Guardrail 1.8%
Clear & Grubb 0.6%
Metal Pipes & Aprons 0.4%
Erosion Control (Section 2601) 0.2%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.2%
Safety Closures & Road Closures 0.1%
Granular Surfacing of Driveway 0.1%
Signs, Posts, Etc 0.1%
07:02 Tuesday, May 2, 2017 2
Iowa Department of Transportation -- Office of Contracts
Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting
------
------
Bid Order: 003 Type of Work: BRIDGE AND APPROACHES - PPCB Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: R15 County: DECATUR
Est'd Cost: $1,500,000 - $3,000,000 2.5% DBE Goal: $37,500 - $75,000 5.0% DBE Goal: $75,000 - $150,000
DBE Work Pct of Est
------
Epoxy Coated Reinforcing Steel 5.9%
Revetment 5.7%
Handrail and Barrier Rails 2.9%
Bridge Approaches or Medians 2.6%
Reinforcing Steel 2.1%
Guardrail 1.7%
Clear & Grubb 0.6%
Construction Survey 0.6%
Metal Pipes & Aprons 0.4%
Erosion Control (Section 2601) 0.3%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.3%
Removal of Pavement 0.3%
Safety Closures & Road Closures 0.1%
------
Bid Order: 004 Type of Work: BRIDGE REPLACEMENT - CCS Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: 105TH AVE County: JONES
Est'd Cost: $300,000 - $600,000 2.5% DBE Goal: $7,500 - $15,000 5.0% DBE Goal: $15,000 - $30,000
DBE Work Pct of Est
------
Epoxy Coated Reinforcing Steel 11.0%
Clear & Grubb 4.8%
Revetment 4.5%
Guardrail 3.7%
Handrail and Barrier Rails 2.9%
Metal Pipes & Aprons 1.3%
Unclassified Culverts 0.8%
Erosion Control (Section 2601) 0.5%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.3%
Granular Surfacing of Driveway 0.2%
Safety Closures & Road Closures 0.1%
------
07:02 Tuesday, May 2, 2017 3
Iowa Department of Transportation -- Office of Contracts
Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting
------
Bid Order: 005 Type of Work: BRIDGE REPLACEMENT - CCS Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: 1ST AVE County: JONES
Est'd Cost: $600,000 - $1,000,000 2.5% DBE Goal: $15,000 - $25,000 5.0% DBE Goal: $30,000 - $50,000
DBE Work Pct of Est
------
Revetment 14.6%
Bridge Approaches or Medians 9.3%
Epoxy Coated Reinforcing Steel 8.4%
Handrail and Barrier Rails 2.3%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 2.1%
Removal of Pavement 1.9%
Erosion Control (Section 2601) 1.3%
Subdrains 1.1%
Clear & Grubb 0.8%
Construction Survey 0.7%
Paved Shoulders 0.4%
Manholes and Intakes 0.4%
Subgrade Stabilization Material 0.2%
Metal Pipes & Aprons 0.1%
Safety Closures & Road Closures 0.0%
------
Bid Order: 006 Type of Work: BRIDGE REPLACEMENT - CCS Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: B-40 County: KOSSUTH
Est'd Cost: $300,000 - $600,000 2.5% DBE Goal: $7,500 - $15,000 5.0% DBE Goal: $15,000 - $30,000
DBE Work Pct of Est
------
Epoxy Coated Reinforcing Steel 14.7%
Guardrail 6.9%
Handrail and Barrier Rails 3.6%
Revetment 2.8%
Safety Closures & Road Closures 0.1%
------
Bid Order: 007 Type of Work: BRIDGE NEW - PPCB Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: U.S. 30 County: LINN
Est'd Cost: $1,500,000 - $3,000,000 2.5% DBE Goal: $37,500 - $75,000 5.0% DBE Goal: $75,000 - $150,000
DBE Work Pct of Est
------
Epoxy Coated Reinforcing Steel 8.7%
07:02 Tuesday, May 2, 2017 4
Iowa Department of Transportation -- Office of Contracts
Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting
------
Bridge Approaches or Medians 8.0%
Revetment 4.1%
Handrail and Barrier Rails 2.9%
Reinforcing Steel 2.1%
Construction Survey 1.6%
TraffCntl & Temp Barrier Rails 1.0%
Paved Shoulders 0.3%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.1%
------
Bid Order: 008 Type of Work: BRIDGE NEW - OTHER Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: 1ST AVE County: LINN
Est'd Cost: $1,500,000 - $3,000,000 2.5% DBE Goal: $37,500 - $75,000 5.0% DBE Goal: $75,000 - $150,000
DBE Work Pct of Est
------
PC Concrete Drives 0.9%
Manholes and Intakes 0.7%
TraffCntl & Temp Barrier Rails 0.3%
Removal of Pavement 0.2%
Construction Survey 0.2%
Safety Closures & Road Closures 0.1%
PCC Sidewalks & Trails (Constr/Removal) 0.0%
------
Bid Order: 010 Type of Work: BRIDGE AND APPROACHES - CCS Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: 340TH STREET (L66) County: POTTAWATTAMIE
Est'd Cost: $600,000 - $1,000,000 2.5% DBE Goal: $15,000 - $25,000 5.0% DBE Goal: $30,000 - $50,000
DBE Work Pct of Est
------
Epoxy Coated Reinforcing Steel 10.9%
Bridge Approaches or Medians 10.8%
Revetment 5.8%
Handrail and Barrier Rails 2.6%
Guardrail 2.5%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 1.0%
Removal of Pavement 0.5%
Reinforcing Steel 0.5%
Erosion Control (Section 2601) 0.4%
Clear & Grubb 0.2%
Safety Closures & Road Closures 0.0%
------
07:02 Tuesday, May 2, 2017 5
Iowa Department of Transportation -- Office of Contracts
Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting
------
Bid Order: 011 Type of Work: BRIDGE RPLC - STEEL GIRDER Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: I-29 County: POTTAWATTAMIE
Est'd Cost: $20,000,000 - $30,000,000 2.5% DBE Goal: $500,000 - $750,000 5.0% DBE Goal: $1,000,000 - $1,500,000
DBE Work Pct of Est
------
Construction Survey 1.6%
Epoxy Coated Reinforcing Steel 0.9%
Reinforcing Steel 0.7%
TraffCntl & Temp Barrier Rails 0.2%
Crash Cushions 0.2%
Paved Shoulders 0.2%
Safety Closures & Road Closures 0.1%
Revetment 0.1%
Clear & Grubb 0.0%
Fencing 0.0%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.0%
Removal of Pavement 0.0%
Guardrail 0.0%
------
Bid Order: 012 Type of Work: RCB CULVERT RPLC - SINGLE BOX Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: CREEK TOP ROAD County: POTTAWATTAMIE
Est'd Cost: $1,500,000 - $3,000,000 2.5% DBE Goal: $37,500 - $75,000 5.0% DBE Goal: $75,000 - $150,000
DBE Work Pct of Est
------
Epoxy Coated Reinforcing Steel 11.7%
PCC Sidewalks & Trails (Constr/Removal) 0.8%
Removal of Pavement 0.3%
Subgrade Stabilization Material 0.3%
Fencing 0.3%
Erosion Control (Section 2601) 0.2%
Clear & Grubb 0.2%
Subdrains 0.2%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.1%
PC Concrete Drives 0.0%
Safety Closures & Road Closures 0.0%
------
07:02 Tuesday, May 2, 2017 6
Iowa Department of Transportation -- Office of Contracts
Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting
------
Bid Order: 013 Type of Work: BRIDGE AND APPROACHES - PPCB Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: DOGWOOD AVE (K24) County: SIOUX
Est'd Cost: $300,000 - $600,000 2.5% DBE Goal: $7,500 - $15,000 5.0% DBE Goal: $15,000 - $30,000
DBE Work Pct of Est
------
Epoxy Coated Reinforcing Steel 8.3%
Bridge Approaches or Medians 5.4%
Guardrail 4.1%
Handrail and Barrier Rails 3.2%
Removal of Pavement 0.3%
Safety Closures & Road Closures 0.1%
------
Bid Order: 014 Type of Work: BRIDGE DECK OVERLAY Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: ALBIA ROAD County: WAPELLO
Est'd Cost: Less than $300,000 2.5% DBE Goal: $0 - $7,500 5.0% DBE Goal: $0 - $15,000
DBE Work Pct of Est
------
Bridge Approaches or Medians 22.2%
Handrail and Barrier Rails 10.4%
Guardrail 8.3%
Removal of Pavement 2.2%
Construction Survey 0.8%
Erosion Control (Section 2601) 0.6%
Flowable Mortar 0.6%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.6%
Safety Closures & Road Closures 0.3%
------
Bid Order: 015 Type of Work: BRIDGE NEW - OTHER Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: FLOYD RIVER TRAIL County: WOODBURY
Est'd Cost: $1,500,000 - $3,000,000 2.5% DBE Goal: $37,500 - $75,000 5.0% DBE Goal: $75,000 - $150,000
DBE Work Pct of Est
------
PCC Sidewalks & Trails (Constr/Removal) 6.8%
Fencing 3.4%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 1.7%
Erosion Control (Section 2601) 1.3%
Epoxy Coated Reinforcing Steel 1.2%
Revetment 1.0%
07:02 Tuesday, May 2, 2017 7
Iowa Department ofTransportation -- Office of Contracts
Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting
------
Concrete Pipes & Aprons 0.8%
Construction Survey 0.7%
Reinforcing Steel 0.4%
Safety Closures & Road Closures 0.0%
------
Bid Order: 103 Type of Work: PCC OVERLAY - UNBONDED Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: N-65 County: POCAHONTAS
Est'd Cost: $3,000,000 - $5,000,000 2.5% DBE Goal: $75,000 - $125,000 5.0% DBE Goal: $150,000 - $250,000
DBE Work Pct of Est
------
TraffCntl & Temp Barrier Rails 3.2%
Erosion Control (Section 2601) 2.6%
Metal Pipes & Aprons 1.8%
Repair Patches 1.0%
Concrete Pipes & Aprons 0.8%
Granular Surfacing of Driveway 0.6%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.5%
Bridge Approaches or Medians 0.5%
Guardrail 0.5%
Clear & Grubb 0.5%
Removal of Pavement 0.5%
Subgrade Stabilization Material 0.1%
Safety Closures & Road Closures 0.0%
------
Bid Order: 104 Type of Work: PCC PAVEMENT - GRADE/REPLACE Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: 5TH STREET County: TAMA
Est'd Cost: $600,000 - $1,000,000 2.5% DBE Goal: $15,000 - $25,000 5.0% DBE Goal: $30,000 - $50,000
DBE Work Pct of Est
------
Manholes and Intakes 9.5%
Removal of Pavement 8.3%
PCC Sidewalks & Trails (Constr/Removal) 4.3%
PC Concrete Drives 3.8%
Subdrains 2.6%
Signs, Posts, Etc 1.5%
Erosion Control (Section 2601) 0.9%
Safety Closures & Road Closures 0.3%
Subgrade Stabilization Material 0.2%
------
07:02 Tuesday, May 2, 2017 8
Iowa Department of Transportation -- Office of Contracts
Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting
------
Bid Order: 155 Type of Work: HMA PAVEMENT - GRADE/NEW Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: 76TH STREET County: SCOTT
Est'd Cost: $3,000,000 - $5,000,000 2.5% DBE Goal: $75,000 - $125,000 5.0% DBE Goal: $150,000 - $250,000
DBE Work Pct of Est
------
PCC Sidewalks & Trails (Constr/Removal) 6.2%
Curb & Gutter 4.3%
Manholes and Intakes 3.3%
Revetment 3.2%
TraffCntl& Temp Barrier Rails 1.8%
Temporary / Detour Pavement 1.7%
Subdrains 1.4%
Fencing 1.0%
Reinforcing Steel 0.7%
Removal of Pavement 0.6%
Erosion Control (Section 2601) 0.6%
Trenched Storm Sewer & Removal 0.6%
Concrete Pipes & Aprons 0.5%
Full Depth Finish Patches 0.5%
Construction Survey 0.4%
Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.4%
Subgrade Stabilization Material 0.3%
PC Concrete Drives 0.3%
Clear & Grubb 0.2%
Trenched Sanitary Sewer/Service & Rmvl 0.0%
Safety Closures & Road Closures 0.0%
Granular Surfacing of Driveway 0.0%
Signs, Posts, Etc 0.0%
Relocation of Mail Box 0.0%
------
Bid Order: 202 Type of Work: PCC PATCHING Current DBE Goal Assigned: 0.0%
Hwy/Rte/St: VARIOUS ROUTES County: MARION
Est'd Cost: $1,000,000 - $1,500,000 2.5% DBE Goal: $25,000 - $37,500 5.0% DBE Goal: $50,000 - $75,000
DBE Work Pct of Est
------
Full Depth Finish Patches 29.6%
Curb & Gutter 13.2%
PC Concrete Drives 5.2%
Subdrains 3.8%
Removal of Curb 2.1%
PCC Sidewalks & Trails (Constr/Removal) 1.9%
Manholes and Intakes 1.7%
Removal of Pavement 1.6%
Erosion Control (Section 2601) 0.9%
07:02 Tuesday, May 2, 2017 9
Iowa Department of Transportation -- Office of Contracts
Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting
------
Construction Survey 0.7%
Signs, Posts, Etc 0.4%
Relocation of Mail Box 0.2%
Safety Closures & Road Closures 0.1%
------