Iowa Department of Transportation Office of Contracts

Iowa Department of Transportation Office of Contracts

07:02 Tuesday, May 2, 2017 1

Iowa Department of Transportation -- Office of Contracts

Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting

------

Bid Order: 001 Type of Work: BRIDGE NEW - PPCB Current DBE Goal Assigned: 1.0%

Hwy/Rte/St: U.S. 63 County: BLACK HAWK

Est'd Cost: $20,000,000 - $30,000,000 2.5% DBE Goal: $500,000 - $750,000 5.0% DBE Goal: $1,000,000 - $1,500,000

DBE Work Pct of Est

------

Concrete Barriers 0.9%

Epoxy Coated Reinforcing Steel 0.8%

Bridge Approaches or Medians 0.8%

Handrail and Barrier Rails 0.8%

Removal of Pavement 0.6%

Manholes and Intakes 0.6%

PCC Sidewalks & Trails (Constr/Removal) 0.5%

Construction Survey 0.4%

Subdrains 0.3%

Temporary / Detour Pavement 0.3%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.3%

Erosion Control (Section 2601) 0.2%

Fencing 0.2%

Reinforcing Steel 0.2%

PC Concrete Drives 0.1%

Curb & Gutter 0.1%

Steps, Walls and Footings 0.1%

Trenched Sanitary Sewer/Service & Rmvl 0.0%

Clear & Grubb 0.0%

Full Depth Finish Patches 0.0%

Safety Closures & Road Closures 0.0%

Guardrail 0.0%

------

Bid Order: 002 Type of Work: BRIDGE REPLACEMENT - CCS Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: 130TH ST County: CLAYTON

Est'd Cost: $300,000 - $600,000 2.5% DBE Goal: $7,500 - $15,000 5.0% DBE Goal: $15,000 - $30,000

DBE Work Pct of Est

------

Epoxy Coated Reinforcing Steel 16.6%

Revetment 9.3%

Handrail and Barrier Rails 3.8%

Guardrail 1.8%

Clear & Grubb 0.6%

Metal Pipes & Aprons 0.4%

Erosion Control (Section 2601) 0.2%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.2%

Safety Closures & Road Closures 0.1%

Granular Surfacing of Driveway 0.1%

Signs, Posts, Etc 0.1%

07:02 Tuesday, May 2, 2017 2

Iowa Department of Transportation -- Office of Contracts

Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting

------

------

Bid Order: 003 Type of Work: BRIDGE AND APPROACHES - PPCB Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: R15 County: DECATUR

Est'd Cost: $1,500,000 - $3,000,000 2.5% DBE Goal: $37,500 - $75,000 5.0% DBE Goal: $75,000 - $150,000

DBE Work Pct of Est

------

Epoxy Coated Reinforcing Steel 5.9%

Revetment 5.7%

Handrail and Barrier Rails 2.9%

Bridge Approaches or Medians 2.6%

Reinforcing Steel 2.1%

Guardrail 1.7%

Clear & Grubb 0.6%

Construction Survey 0.6%

Metal Pipes & Aprons 0.4%

Erosion Control (Section 2601) 0.3%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.3%

Removal of Pavement 0.3%

Safety Closures & Road Closures 0.1%

------

Bid Order: 004 Type of Work: BRIDGE REPLACEMENT - CCS Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: 105TH AVE County: JONES

Est'd Cost: $300,000 - $600,000 2.5% DBE Goal: $7,500 - $15,000 5.0% DBE Goal: $15,000 - $30,000

DBE Work Pct of Est

------

Epoxy Coated Reinforcing Steel 11.0%

Clear & Grubb 4.8%

Revetment 4.5%

Guardrail 3.7%

Handrail and Barrier Rails 2.9%

Metal Pipes & Aprons 1.3%

Unclassified Culverts 0.8%

Erosion Control (Section 2601) 0.5%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.3%

Granular Surfacing of Driveway 0.2%

Safety Closures & Road Closures 0.1%

------

07:02 Tuesday, May 2, 2017 3

Iowa Department of Transportation -- Office of Contracts

Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting

------

Bid Order: 005 Type of Work: BRIDGE REPLACEMENT - CCS Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: 1ST AVE County: JONES

Est'd Cost: $600,000 - $1,000,000 2.5% DBE Goal: $15,000 - $25,000 5.0% DBE Goal: $30,000 - $50,000

DBE Work Pct of Est

------

Revetment 14.6%

Bridge Approaches or Medians 9.3%

Epoxy Coated Reinforcing Steel 8.4%

Handrail and Barrier Rails 2.3%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 2.1%

Removal of Pavement 1.9%

Erosion Control (Section 2601) 1.3%

Subdrains 1.1%

Clear & Grubb 0.8%

Construction Survey 0.7%

Paved Shoulders 0.4%

Manholes and Intakes 0.4%

Subgrade Stabilization Material 0.2%

Metal Pipes & Aprons 0.1%

Safety Closures & Road Closures 0.0%

------

Bid Order: 006 Type of Work: BRIDGE REPLACEMENT - CCS Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: B-40 County: KOSSUTH

Est'd Cost: $300,000 - $600,000 2.5% DBE Goal: $7,500 - $15,000 5.0% DBE Goal: $15,000 - $30,000

DBE Work Pct of Est

------

Epoxy Coated Reinforcing Steel 14.7%

Guardrail 6.9%

Handrail and Barrier Rails 3.6%

Revetment 2.8%

Safety Closures & Road Closures 0.1%

------

Bid Order: 007 Type of Work: BRIDGE NEW - PPCB Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: U.S. 30 County: LINN

Est'd Cost: $1,500,000 - $3,000,000 2.5% DBE Goal: $37,500 - $75,000 5.0% DBE Goal: $75,000 - $150,000

DBE Work Pct of Est

------

Epoxy Coated Reinforcing Steel 8.7%

07:02 Tuesday, May 2, 2017 4

Iowa Department of Transportation -- Office of Contracts

Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting

------

Bridge Approaches or Medians 8.0%

Revetment 4.1%

Handrail and Barrier Rails 2.9%

Reinforcing Steel 2.1%

Construction Survey 1.6%

TraffCntl & Temp Barrier Rails 1.0%

Paved Shoulders 0.3%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.1%

------

Bid Order: 008 Type of Work: BRIDGE NEW - OTHER Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: 1ST AVE County: LINN

Est'd Cost: $1,500,000 - $3,000,000 2.5% DBE Goal: $37,500 - $75,000 5.0% DBE Goal: $75,000 - $150,000

DBE Work Pct of Est

------

PC Concrete Drives 0.9%

Manholes and Intakes 0.7%

TraffCntl & Temp Barrier Rails 0.3%

Removal of Pavement 0.2%

Construction Survey 0.2%

Safety Closures & Road Closures 0.1%

PCC Sidewalks & Trails (Constr/Removal) 0.0%

------

Bid Order: 010 Type of Work: BRIDGE AND APPROACHES - CCS Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: 340TH STREET (L66) County: POTTAWATTAMIE

Est'd Cost: $600,000 - $1,000,000 2.5% DBE Goal: $15,000 - $25,000 5.0% DBE Goal: $30,000 - $50,000

DBE Work Pct of Est

------

Epoxy Coated Reinforcing Steel 10.9%

Bridge Approaches or Medians 10.8%

Revetment 5.8%

Handrail and Barrier Rails 2.6%

Guardrail 2.5%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 1.0%

Removal of Pavement 0.5%

Reinforcing Steel 0.5%

Erosion Control (Section 2601) 0.4%

Clear & Grubb 0.2%

Safety Closures & Road Closures 0.0%

------

07:02 Tuesday, May 2, 2017 5

Iowa Department of Transportation -- Office of Contracts

Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting

------

Bid Order: 011 Type of Work: BRIDGE RPLC - STEEL GIRDER Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: I-29 County: POTTAWATTAMIE

Est'd Cost: $20,000,000 - $30,000,000 2.5% DBE Goal: $500,000 - $750,000 5.0% DBE Goal: $1,000,000 - $1,500,000

DBE Work Pct of Est

------

Construction Survey 1.6%

Epoxy Coated Reinforcing Steel 0.9%

Reinforcing Steel 0.7%

TraffCntl & Temp Barrier Rails 0.2%

Crash Cushions 0.2%

Paved Shoulders 0.2%

Safety Closures & Road Closures 0.1%

Revetment 0.1%

Clear & Grubb 0.0%

Fencing 0.0%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.0%

Removal of Pavement 0.0%

Guardrail 0.0%

------

Bid Order: 012 Type of Work: RCB CULVERT RPLC - SINGLE BOX Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: CREEK TOP ROAD County: POTTAWATTAMIE

Est'd Cost: $1,500,000 - $3,000,000 2.5% DBE Goal: $37,500 - $75,000 5.0% DBE Goal: $75,000 - $150,000

DBE Work Pct of Est

------

Epoxy Coated Reinforcing Steel 11.7%

PCC Sidewalks & Trails (Constr/Removal) 0.8%

Removal of Pavement 0.3%

Subgrade Stabilization Material 0.3%

Fencing 0.3%

Erosion Control (Section 2601) 0.2%

Clear & Grubb 0.2%

Subdrains 0.2%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.1%

PC Concrete Drives 0.0%

Safety Closures & Road Closures 0.0%

------

07:02 Tuesday, May 2, 2017 6

Iowa Department of Transportation -- Office of Contracts

Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting

------

Bid Order: 013 Type of Work: BRIDGE AND APPROACHES - PPCB Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: DOGWOOD AVE (K24) County: SIOUX

Est'd Cost: $300,000 - $600,000 2.5% DBE Goal: $7,500 - $15,000 5.0% DBE Goal: $15,000 - $30,000

DBE Work Pct of Est

------

Epoxy Coated Reinforcing Steel 8.3%

Bridge Approaches or Medians 5.4%

Guardrail 4.1%

Handrail and Barrier Rails 3.2%

Removal of Pavement 0.3%

Safety Closures & Road Closures 0.1%

------

Bid Order: 014 Type of Work: BRIDGE DECK OVERLAY Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: ALBIA ROAD County: WAPELLO

Est'd Cost: Less than $300,000 2.5% DBE Goal: $0 - $7,500 5.0% DBE Goal: $0 - $15,000

DBE Work Pct of Est

------

Bridge Approaches or Medians 22.2%

Handrail and Barrier Rails 10.4%

Guardrail 8.3%

Removal of Pavement 2.2%

Construction Survey 0.8%

Erosion Control (Section 2601) 0.6%

Flowable Mortar 0.6%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.6%

Safety Closures & Road Closures 0.3%

------

Bid Order: 015 Type of Work: BRIDGE NEW - OTHER Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: FLOYD RIVER TRAIL County: WOODBURY

Est'd Cost: $1,500,000 - $3,000,000 2.5% DBE Goal: $37,500 - $75,000 5.0% DBE Goal: $75,000 - $150,000

DBE Work Pct of Est

------

PCC Sidewalks & Trails (Constr/Removal) 6.8%

Fencing 3.4%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 1.7%

Erosion Control (Section 2601) 1.3%

Epoxy Coated Reinforcing Steel 1.2%

Revetment 1.0%

07:02 Tuesday, May 2, 2017 7

Iowa Department ofTransportation -- Office of Contracts

Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting

------

Concrete Pipes & Aprons 0.8%

Construction Survey 0.7%

Reinforcing Steel 0.4%

Safety Closures & Road Closures 0.0%

------

Bid Order: 103 Type of Work: PCC OVERLAY - UNBONDED Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: N-65 County: POCAHONTAS

Est'd Cost: $3,000,000 - $5,000,000 2.5% DBE Goal: $75,000 - $125,000 5.0% DBE Goal: $150,000 - $250,000

DBE Work Pct of Est

------

TraffCntl & Temp Barrier Rails 3.2%

Erosion Control (Section 2601) 2.6%

Metal Pipes & Aprons 1.8%

Repair Patches 1.0%

Concrete Pipes & Aprons 0.8%

Granular Surfacing of Driveway 0.6%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.5%

Bridge Approaches or Medians 0.5%

Guardrail 0.5%

Clear & Grubb 0.5%

Removal of Pavement 0.5%

Subgrade Stabilization Material 0.1%

Safety Closures & Road Closures 0.0%

------

Bid Order: 104 Type of Work: PCC PAVEMENT - GRADE/REPLACE Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: 5TH STREET County: TAMA

Est'd Cost: $600,000 - $1,000,000 2.5% DBE Goal: $15,000 - $25,000 5.0% DBE Goal: $30,000 - $50,000

DBE Work Pct of Est

------

Manholes and Intakes 9.5%

Removal of Pavement 8.3%

PCC Sidewalks & Trails (Constr/Removal) 4.3%

PC Concrete Drives 3.8%

Subdrains 2.6%

Signs, Posts, Etc 1.5%

Erosion Control (Section 2601) 0.9%

Safety Closures & Road Closures 0.3%

Subgrade Stabilization Material 0.2%

------

07:02 Tuesday, May 2, 2017 8

Iowa Department of Transportation -- Office of Contracts

Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting

------

Bid Order: 155 Type of Work: HMA PAVEMENT - GRADE/NEW Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: 76TH STREET County: SCOTT

Est'd Cost: $3,000,000 - $5,000,000 2.5% DBE Goal: $75,000 - $125,000 5.0% DBE Goal: $150,000 - $250,000

DBE Work Pct of Est

------

PCC Sidewalks & Trails (Constr/Removal) 6.2%

Curb & Gutter 4.3%

Manholes and Intakes 3.3%

Revetment 3.2%

TraffCntl& Temp Barrier Rails 1.8%

Temporary / Detour Pavement 1.7%

Subdrains 1.4%

Fencing 1.0%

Reinforcing Steel 0.7%

Removal of Pavement 0.6%

Erosion Control (Section 2601) 0.6%

Trenched Storm Sewer & Removal 0.6%

Concrete Pipes & Aprons 0.5%

Full Depth Finish Patches 0.5%

Construction Survey 0.4%

Water Pollution Cntrl, Soil Erosion (Sect 2602) 0.4%

Subgrade Stabilization Material 0.3%

PC Concrete Drives 0.3%

Clear & Grubb 0.2%

Trenched Sanitary Sewer/Service & Rmvl 0.0%

Safety Closures & Road Closures 0.0%

Granular Surfacing of Driveway 0.0%

Signs, Posts, Etc 0.0%

Relocation of Mail Box 0.0%

------

Bid Order: 202 Type of Work: PCC PATCHING Current DBE Goal Assigned: 0.0%

Hwy/Rte/St: VARIOUS ROUTES County: MARION

Est'd Cost: $1,000,000 - $1,500,000 2.5% DBE Goal: $25,000 - $37,500 5.0% DBE Goal: $50,000 - $75,000

DBE Work Pct of Est

------

Full Depth Finish Patches 29.6%

Curb & Gutter 13.2%

PC Concrete Drives 5.2%

Subdrains 3.8%

Removal of Curb 2.1%

PCC Sidewalks & Trails (Constr/Removal) 1.9%

Manholes and Intakes 1.7%

Removal of Pavement 1.6%

Erosion Control (Section 2601) 0.9%

07:02 Tuesday, May 2, 2017 9

Iowa Department of Transportation -- Office of Contracts

Summary of DBE Work on Federal-Aid projects associated with Bid Orders in the 20jun2017 Letting

------

Construction Survey 0.7%

Signs, Posts, Etc 0.4%

Relocation of Mail Box 0.2%

Safety Closures & Road Closures 0.1%

------