Environmental analysis

Environmental impacts of proposed options

Option / Key Positive Impacts / Key Negative Impacts
Do nothing /
  • Reversion to natural processes
/
  • Significant increase in flood risk and damage/disruption to people, property, ecology and cultural heritage.

Do minimum /
  • Reversion to natural processes
/
  • Increase in flood risk and damage/disruption to people, property, ecology and cultural heritage.

Option 3: Low Wall /
  • Improved flood protection to Uckfield town centre
  • short construction period with no modification to existing channel
  • opportunity to enhance vegetation around Kennet House and in the car park area through vegetation plantings
  • installation of an interceptor pit on the new surface water outfall
/
  • Removal of several trees and vegetation around Kennet House, which may impact on nesting birds if undertaken from March – August.
  • Minor clearance of vegetation in bypass channel, which may impact on nesting birds if undertaken from March – August.
  • Temporary impact on local community, traffic and transport from construction activities

Option 4: High Wall /
  • Improved flood protection to Uckfield town centre
  • Enhanced flood protection of one listed building, Bridge Cottage
  • opportunity to enhance Local Nature Reserve through tree plantings etc
/
  • Potential tree loss/damage in LNR and in back gardens of properties along Olives Meadows and associated potential impact on bat habitat
  • Potential impact to one Tree Preservation Order (TPOs)
  • Potential impact associated with proposed riverside walk and river crossings leading from Somerfield car park towards Hemstead Mill and south of High St bridge
  • Loss of visual amenity through construction of visually intrusive walls on northern and southern banks of the river
  • Potential for impact to the grounds of two listed buildings, Bridge Cottage and Uckfield Mill which may trigger Listed Building Consent.
  • Increased flood risk to one listed building, Uckfield Mill

Option 5: Wall & downstream Channel /
  • Improved flood protection to Uckfield town centre
  • Scope for access improvements and the development of additional riverside walks potentially with disabled access
  • Potential to enhance fish passage through the bypass channel
  • Enhanced flood protection of one listed building, Bridge Cottage
  • opportunity to enhance Local Nature Reserve through tree plantings etc
/
  • Potential tree loss/damage in LNR and in back gardens of properties along Olives Meadows and associated potential impact on bat habitat and breeding birds (March – August inclusive).
  • Potential damage to LNR through excavation and construction impacts
  • Permanent loss of industrial/commercial properties downstream of High St Bridge
  • Potential impact to one TPO
  • Potential impact associated with proposed riverside walk and river crossings leading from Somerfield car park towards Hempstead Mill and south of High St bridge
  • Loss of visual amenity through construction of visually intrusive walls on northern and southern banks of the river
  • loss of mature trees and bankside vegetation
  • Potential for impact to the curtilage of two listed buildings, Bridge Cottage and Uckfield Mill which may trigger Listed Building Consent.
  • Increased flood risk to one listed building, Uckfield Mill

Option 6: Upstream Storage /
  • Improved flood protection to wider area of Uckfield town centre
  • Provision of additional informal recreation opportunities in the community such as walking, fishing, boating
  • Potential for positive impact to upstream and downstream environment dependant on flooding regime
/
  • Potential tree loss through construction of water retaining structure and associated potential impact on bat habitat
  • Permanent and temporary damage to terrestrial ecology/agricultural land use during flood storage
  • Impact on landscape values and visual amenity
  • Potential archaeological impact, i.e. one SM, ASAs and recorded archaeological sites.
  • Potential negative impact to upstream and downstream environment dependant on flooding regime;
  • Potential for degradation of downstream river habitat due to reduction in scale of flood events

LNR: Local Nature Reserve

TPO: Tree Preservation Order

SM: Scheduled Monument

ASA: Archaeologically Sensitive Area