1 / NameoftheApplicantapplyingforShortTerm
OpenAccess
2 / Addressforcorrespondence
3 / AuthorisedContactPerson
(i)Name
(ii)Designation
(iii)PhoneNumbers
(iv)Fax
(v)E-Mail
4 / AuthorisedPersonforscheduling
(i)Name
(ii)Designation
(iii)PhoneNumbers
(iv)Fax
(v)E-Mail
5 / OpenAccessPeriodRequired
(i)Fromdate
(ii)ToDate
(iii)Period

Annexure-1

RajasthanRajyaVidyutPrasarnNigamLimited

(StateTransmissionUtility)

APPLICATIONFORMFORGRANTOFSHORTTERMOPENACCESS

6 / Detailsofpowertransferrequirement
i.Quantumofpowertobetransmitted
(MW)
ii.Peakloadtobetransferred(MW)
iii.Averageloadtobetransferred(MW)
7 / Detailsatinjectionpointinintra-statetransmission
system
(i)Nameofinjectingutility/party/generating
station
(ii)VoltageLevel
(iii)Pointofinjection(nameofEHVStationof
RVPN)
(iv)IfpowerisinjectedatotherthanRVPN
EHVGSSofRVPN,nameandownerof
S/SforO&M
(v)SingleLineDiagramatInjectingPoint
8 / Detailsatpointofdrawalfromintra-state
transmissionsystem
(i)Nameofutility/party/generatingstation
(ii)VoltageLevel
(iii)Pointofdrawal(nameofEHVStationof
RVPN)
(iv)IfpowerisdrawnatotherthanRVPNEHV
GSSofRVPN,nameandownerofS/Sfor
O&M
(v)SingleLineDiagramatdrawalPoint
9 / IncaseofInter-StateOpenAccessfurnishdetails
(i)Nameofinjectingutility/party/generating
station
(ii)VoltageLevel
(iii)Pointofinjection(nameofEHVStation
wherepowerisinjectedininter-state
Transmissionsystem
(iv)FurnishCTU/RLDCapprovalforinter-state
openaccess
(v)SingleLineDiagramatInjectingPoint
10 / Detailsatinjectionpointindistributionsystem
(i)NameofDiscominwhosedistribution
systempowertobeinjected
(ii)VoltageLevel
(iii)Pointofinjection(nameofDistribution
Sub-StationofDiscom)
(iv)IfpowerisinjectedatotherthanDiscom’s
sub-stationnameandownerofS/S.
(v)SingleLineDiagramatInjectionPointin
Distributionsystem
11 / Detailsatpointofdrawalindistributionsystem
(i)NameofDiscominwhosedistribution
systempowertobedrawn
(ii)VoltageLevel
(iii)Pointofdrawal(nameofDistributionSub-
StationofDiscom)
(iv)IfpowerisdrawnatotherthanDiscom’s
sub-stationnameandownerofsub-station.
(v)SingleLineDiagramatdrawalPointin
Distribution
12 / DetailsofAgreementandMOU
(i)ForPowertobeinjected
(ii)ForpowertobeDrawn
(iii)ForBalancingandMismatchpower
requirement
(iv)ForInter-StateTransmissionOpenAccess
ifinvolved
(v)Agreementwithtradersifanyinabove
transaction
13 / IncaseofinjectionthroughGeneratingStationnot
connectedtoGrid
i.Nameofthepromoter
ii.GenerationCapacity
iii.LocationoftheGenerationplant
iv.No.ofUnitsCapacityofeachunit
v.Typeoffuel
vi.Baseloadstationorpeakingloadstation
vii.Ifpeakingload,thenwhatistheestimated
hoursofrunning
viii.Ifitisahydroplant,thenwhetheritis–Run
oftheriver/Reservoir/Multipurpose/Pump
storage
ix.MUgenerationinanyearincaseofHydro
plant
x.Specifythestep-upgenerationVoltage–
400kVor220kVoranyothervoltage
xi.IncaseofHydelplants,whetheritisa
identifiedprojectofCEA
xii.IsitacaptivePowerPlant(Yes/No)
IfYes,detailsofutilization
xiii.StatusoftheProject:Existing/Extensionof
existingProject/Newproject
14 / BankDraftforApplicationProcessingFee
(i)NameofBank
(ii)DraftNo.Date
(iii)Amount
(iv)PayableatBank

Itisherebycertifiedthattheapplicantunequivocallyconfirmstothetermsandconditionsand

hasfullyunderstoodtheguidelinesissuedbyRVPNforShort-termopenaccess.

Place:

Date:

AuthorizedSignatory

ShortTermOpenAccessCustomer

Name:

Designation:

Seal:

Annexure-2

RajasthanRajyaVidyutPrasaranNigamLimited

TermsandConditionsforShorttermOpenAccess

(PursuancetoClause10ofRajasthanElectricityRegulatoryCommission(TermsandConditions

forOpenAccess)Regulations,2004)

Weherebyconfirmtoagreeandabidebythefollowingtermsandconditionsofopenaccessfor

intra-statetransmissionsysteminRajasthangrid.

(1)WeshallabidetheRajasthanElectricityRegulatoryCommission(TermsandConditions

forOpenAccess)Regulations,2004.

(2)WeagreethattheallotmentprioritytousforShortTermOpenAccessshallbeasper

Regulation8ofRERC(TermsConditionsofOpenAccess)Regulations2004.

(3)WeagreeforcurtailmentpolicyasperRERCRegulations.

(4)Weagreetofurnishtherequisitedata/informationforthesystemstudiesandsuch

additionalinformationasmayberequiredbyRVPN.

(5)WeshallcomplywiththeprovisionsofRajasthanGridCodeinforcefromtimetotime.

(6)WeshallindemnifyRVPNforanylossordamagearisingasaconsequenceoutofthe

studyconductedbythem.

(7)Weshallnottransferrightsobligationspecifiedintheagreementswithouttheprior

approvalbyRERCandshallbesubjecttopaymentofcompensation,asdeterminedby

theRVPN.

(8)Weagreeforpaymentofthetransmissionanddistributionwheelingchargesas

determinedbyRERCandalsoagreetopayotherchargesapplicableforavailingopen

accessasperRERC(TermsandConditionsforOpenAccess)Regulations2004.

(9)Weagreeforthepaymentforthereactiveenergychargesinaccordancewiththescheme

applicabletogeneratorsandconsumersforreactivechargeinputanddrawalrespectively

asmaybedeterminedbytheCommissionfromtimetotime.

(10)Weagreeforthepaymentforun-scheduleinterchangeandmismatchbetweenthe

scheduleandtheactualdrawalasperthepricingmechanismspecifiedbythe

CommissionfortheStatefromtimetotime.

(11)WeagreeforpaymentofschedulingandsystemoperationchargestotheSLDCas

determinedbytheCommissionfromtimetotime.

(12)WeconfirmthattheEnergylossesonaccountofuseofthetransmissionand/or

distributionsystemshallbebornebyusinproportionoftheenergydrawalbyusbased

ontheactuallossesduringpreviousyearinthetransmissionanddistributionsystemfor

theconnectedopenaccessvoltagelevel.

(13)WeconfirmthatweshallmaintainwithRVPNasecuritydepositamountequivalentto3

monthsamountoftheaveragebillingonthebasisofagreedcontractdemandor

scheduleddrawaltowardstransmissioncharges.

(14)WeconfirmthatweshallmaintainwithSLDCasecuritydepositofamountequivalentto

3monthsoftheaveragebillingtowardsStateLoadDispatchCentrecharges.

(15)WeconfirmthatweshallmaintainwithDistributionLicenseeanamountequivalentto3

monthsoftheaveragebillingtowardswheelingcharges,surchargeandadditional

surchargetowardssecuritydeposit.

(16)Weconfirmthatthesecuritydepositsrequiredtomaintainedbyusatserialnumber13,

14and15shallbefurnishedbyuseitherinCashorweshallmaintainLetterofCredit(s)

fortheamountatthetimeofAgreementbutinanycasebeforeconnectingintosystem.

(17)Weconfirmtoagreeallothercommercialtermsandconditionssuchas,termsof

payment,creditworthiness,indemnification,andforceMajeureetcasmaybespecifiedby

RVPNfromtimetotimeforopenaccesscustomers.

(18)WeagreethatSTUreservestheirrighttoamendtheabovetermsandconditionswithin

theRegulatoryframework.

()

AuthorisedSignatoryofShort-TermOpenAccessCustomer

Name:

Designation:

Seal:

Place:

Date:

OnLetterHeadofopenAccessCustomer

Ref.No.Date:

TheDirector(PR)

RajasthanRajyaVidutPrasaranNigamLimited,

VidyutBhawan,Janpath,

JaipurRajasthan–302005

Subject:ApplicationforShort-termintrastateopenaccess.

Sir,

WewishtoavailShort-termintrastateopenaccessunderRajasthanElectricityRegulatory

Commission(TermsConditionsforOpenAccess)Regulation,2004andsubmitherewiththe

following:

1.ApplicationFormdulyfilledin

2.Demanddraftno.drawnon(BankBranch)forRs.5,000/-payabletoSr.

AccountsOfficer()RRVPNLtd,Jaipur

3.ConfirmationofacceptanceoftheRVPNtermsandconditionsforShortTermOpen

Access

Itisrequestedthattheenclosedapplicationmaybeprocessedatyourend.

Thankingyou,

Yoursfaithfully,

()

AuthorisedSignatoryofShort-TermOpenAccessCustomer

Name:

Designation:

Seal:

Copyto:

ManagingDirector,------VidyutVitranNigamLimited,------alongwithcopyof

1,23mentionedabove

AuthorisedSignatoryofShort-TermOpenAccessCustomer

RajasthanRajyaVidyutPrasaranNigamLimited

APPROVALFORSHORTTERMOPENACCESS

PursuancetoClause11ofRajasthanElectricityRegulatoryCommission(TermsandConditions

forOpenAccess)Regulations,2004

No.RVPN/Dir(PR)/PPM&R/OpenAccess/D.date

To,

M/s.------

------

------

Sub:ShortTermOpenAccess

Ref.YourapplicationNo.datedforShorttermopenaccess

DearSir.

KindlyreferyourapplicationforShortTermopenAccessonintra-statetransmissionsystem

and/orDistributionsystemunderRajasthanElectricityRegulatoryCommission(Terms

ConditionforOpenAccess)Regulations,2004.

RVPNafterscrutinyandexaminationofyourapplicationforShorttermopenaccessascertained

thattheavailabletransmissioncapacitycanbeallowedtoyouforShort-termopenaccesson

intra-statetransmissionsystemonfollowingconditions:

(a)------

(b)------

(c)------

(d)------.

Subjecttoaboveconditions,theRVPNagreedtoprovideShortopenaccessasperRERC(Terms

ConditionforOpenAccess)Regulationsandonthespecifiedtermsconditionsand

conveyedacceptancetoOpenAccess.Customer.

YouarerequestedtokindlyexecutetheOpenAccessConnectionAgreementintheprescribed

manner.

TheChiefEngineer(PPM&R),RVPN,JaipurisauthorisedsignatoryonbehalfofRVPNandthe

Discom.Youarerequestedtokindlycontacthimatthefollowingaddressforfurtherneedfulin

thematter.

TheChiefEngineer(PPM&R),

RajasthanRajyaVidyutPrasaranNigamLimited,

VidyutBhawan,Janpath,

Jaipur-302005

Tel:0141-2740623

FaxNo.0141-2740794

E-mail:

Kindlynotethatifyoufailtoexecutetheagreementwithin30daysofreceiptofthisconsent

letterouroffershalldeemedtohavedeclinedbyyou.

Thankingyou,

Yoursfaithfully,

Director(P&R)

RajasthanRajyaVidyutPrasaranNigamLimited,

Copytofollowingforinformationnecessaryaction:

1.TheManagingDirector,---VVNL,Jaipur/Ajmer/Jodhpur

2.TheChiefEngineer(T&C)RVPN,Jaipur

3.TheChiefEngineer(PPM&R)RVPN,Jaipur

4.TheChiefEngineer(LD)RVPN,Jaipur

5.TheSuperintendingEngineer(SOLD)RVPN,Jaipur

6.TheSr.AccountsOfficer(),RRVPNL,Jaipur

SHORTTERMOPENACCESSCONNECTIONAGREEMENT

between

RajasthanRajyaVidyutPrasaranNigamLimited,Jaipur

and

------

(NameofShortTermOpenAccessCustomer)

ThisAgreementforShortTermOpenAccessofStateTransmissionSystem(the“Agreement”)

ismadethe------dayof------

BYANDBETWEEN:

RAJASTHANRAJYAVIDYUTPRASARANNIGAMLIMITED,aCompanyincorporated

undertheCompaniesAct,1956andtheStateTransmissionUtilityandTransmissionLicensee

u/s39oftheElectricityAct2003intheStateofRajasthan,havingitsofficeatVidyutBhawan,

Janpath,Jaipur-302005hereinafterreferredtoas"RVPN"(whichexpressionshall,unless

repugnanttothecontextormeaningthereofincludeitssuccessorsandassignees)asapartyof

thefirstpart;

AND

M/s------aCompanyincorporatedundertheCompaniesAct,1956withits

registeredofficelocatedat------hereinafterreferredtoas"OpenAccess

Customer",(whichexpressionshall,unlessrepugnanttothecontextormeaningthereof,include

itssuccessorsandassignees).

WHEREAS

TheOpenAccessCustomerhasmadeanapplicationtoRVPNforavailingshorttermopen

accessontransmissionsystemofRVPNand/orwheelingpowerondistributionsystemof------

Discomasdetailedatschedule-1undertheRajasthanElectricityRegulatoryCommission(Terms

ConditionsforOpenAccess)Regulations,2004andfurnishedrequireddocumentsincluding

copyofMOU/Agreementsforpowerinjection/drawalincludingbalancingpowerandhave

depositedanapplicationprocessingfeeofRs.5000/-(RupeesFiveThousandsonly).

ANDWHEREAS

RVPNafterscrutinyandanalysingtheapplicationandcarryingoutrequiredsystemstudiesfor

ascertainingthecapacityandfacilitiesavailableopenaccessdecidedtoallowtheshorttermopen

accessonthefollowingtermsconditions:

(a)------

(b)------

(c)------

(d)------.

NOW,THEREFORE,inconsiderationtoaboveandthecovenantsinthisAgreement,RVPNand

theOpenAccessCustomerenterintoanAgreementassetforthhereunder:

Followingconstitutestheintegralpartofthisagreement

(i)Applicationforgrantofshort-termopenaccesssubmittedbyOpenAccessCustomer.

(ii)ConfirmationforabidingandcomplyingwiththeTermsandConditionsforavailing

short-termopenaccess.

(iii)RVPNLetterallocatingtheshorttermopenaccesssubjecttoconditionsmentioned

therein.

TermsandConditionsGoverningAgreementforOpenAccess

TheShortTermOpenAccessisallowedasperprovisionsofRajasthanElectricityRegulatory

Commission(TermsandConditionsforOpenAccess)Regulations,2004.

Theopenaccessshallbegovernedbytheprocedureandthetermsconditionsspecifiedby

RVPNinpursuancetoRajasthanElectricityRegulatoryCommission(TermsandConditionsfor

OpenAccess)Regulations,2004.

Chargesforopenaccess

(1)TheOpenAccessCustomeragreetopaythetransmissionchargesforuseofthe

TransmissionSystemandwheelingchargesforuseofthedistributionsystemofa

distributionlicenseeasthecasemaybeasspecifiedbytheCommissionfromtimetotime.

(2)Transmissionchargesfortransmissionsystemand/orwheelingchargesforadistribution

system,asthecasemaybe,constructedforexclusiveuseoftheopenaccesscustomershall

beasdeterminedbytheRVPNand------Discomforrespectiveyearbasedontariffnorms

specifiedbytheCommissionintheregulationsfordeterminationoftariff.

(3)Entirechargesfordedicatedtransmissionsystemand/oradistributionsystemasthecasemay

beshallbebornebytheopenaccesscustomertillrecoveryofentirechargesforthededicated

systemuptosuchtimethesurpluscapacityisusedbyotherpersonsorotherpurpose

(4)Theinter-stateopenaccesscustomersusingintra-statetransmissionsystemordistribution

systemofDistributionLicenseeinconjunctionwithinter-statetransmissionopenaccess

shallpaytoRVPNthetransmissionchargesand/orwheelingchargestoconcerned

distributionlicenseeforuseofintra-statesysteminadditiontopaymentoftransmission

chargesforinter-statetransmission.

(5)BesidestheTransmissionchargesand/orwheelingchargesforuseoftheRVPN

TransmissionSystemand/orthedistributionsystemof------Discomasthecasemaybe,the

OpenAccessConsumeragreestomakethepaymentoffollowingotherchargesin

accordancewithRajasthanElectricityRegulatoryCommission(TermsConditionsfor

OpenAccess)Regulations,2004:

a.Reactiveenergychargesinaccordancewiththeschemeapplicabletogeneratorsand

consumersforreactivechargeinputanddrawalrespectivelyasmaybedeterminedbythe

Commissionfromtimetotime.

b.Paymentofun-scheduleinterchangeandmismatchnotexceeding5%ofthecontracted

openaccesspowerbetweenthescheduleandtheactualdrawalasperthepricing

mechanismspecifiedbytheCommissionfortheStatefromtimetotime.

c.Paymentforbalancepowerrequirementexceeding5%ofthecontractedopenaccess

powerbetweenthescheduleandtheactualdrawalshallbearrangedbytheOpenAccess

CustomerdirectlyunderaseparateAgreemententeredbetweentheOpenAccess

CustomerandanyDistributionLicensee/TraderorGeneratingCompany.

d.PaymentofschedulingandsystemoperationchargestotheSLDCasdeterminedbythe

Commissionfromtimetotime.

Surcharge

(1)Inadditiontotransmissionchargesand/orwheelingchargesasthecasemaybeaconsumer

availingopenaccessoftheRVPNtransmissionsystemand/ordistributionsystemshallpay

totheDistributionLicenseetowhichheisconnected,asurchargeasdeterminedbythe

Commissionfromtimetotime.

(2)TheOpenAccessConsumersavailingexclusivelytheinter-statetransmissionsystemshall

alsopaythesameamountofsurchargeasdeterminedbytheCommissionforintra-state

transmissionsystem/distributionsystem.

AdditionalSurcharge

Aconsumeravailingopenaccessandreceivingsupplyofelectricityfromapersonotherthanthe

distributionlicenseeofhisareaofsupplyshallpaytothedistributionlicenseetowhichhewas

originallyconnectedanadditionalsurchargetomeetthefixedcostofsuchdistributionlicensee

arisingoutofhisobligationtosupplyintermsofRERC(TermsConditionofOpenAccess)

Regulations,2004.

Non-UtilisationofOpenAccessCapacity

(1)TheOpenAccessCustomermaysurrenderthecapacityallottedtohimbyservinganotice

of30daystoRVPNandStateLoadDespatchCentre,ifheisunableornotinpositionto

utilizethefullorsubstantialpartofthecapacityallottedtohim.

(2)TheOpenAccessCustomershallmakepaymentforun-utilized contractedopenaccess

capacityasdeterminedbyRVPNfromtimetotimebasedonRegulationsforTariff

determinationprescribedbytheCommission.

(3)TheOpenAccessCustomershallalsopaytheSchedulingandSystemOperationandLoad

Despatchchargesforun-utilizedcontractedopenaccesscapacitysurrenderedbyhimfor

theremainingperiodofallocation.

(4)HoweverwhentheOpenaccessConsumersurrendersthefullorsubstantialpartofthe

capacityandRVPNacceptssuchreductionorcancellationintheOpenAccessCapacity

andallotssuchreleasedsurrenderedcapacitytoanotherOpenAccessCustomer,the

chargesrecoverablefromoutgoingOpenAccessCustomershallbereducedfortherevised

capacityonly.

Metering

(1)Metersatpointofinjunctionanddrawalandatsuchotherpointsspecifiedbythe

Commissionbasedonvoltage,pointandperiodofsupplyandtariffcategoryasperlatest

amendedMeteringCodeforRajasthanGrid(GridCodepart–III)intransmissionsystem

andasperMeteringCodeofdistributionlicenseesatinter-connectionpointwith

DistributionSystemshallbeprovidedbytheOpenAccessCustomerathisowncost.

(2)Boththepartiesagreethatprovisionsrelatingtometering,jointmeterreading,sealingand

settlementetcshallbegovernedbyRERC(TermsConditionofOpenAccess)

Regulations,2004andMeteringCodeforRajasthanGridandDistributionMeteringCode

ofconcernedDiscom.

Energylosses

TheenergylossesinthetransmissionsystemanddistributionsystemshallbebornebytheOpen

AccessCustomerinproportionoftheenergydrawalbasedontheactuallossesduringprevious

yearinthetransmissionanddistributionsystemfortheconnectedopenaccessvoltagelevel.

ThemonthlystateenergyaccountpreparedandissuedbytheStateLoadDespatchCentreshall

bebindingonbothparties.

SecurityDeposits

(1)Securitydepositamountequivalentto3monthsamountoftheaveragebillingtowards

transmissionchargesontheallocatedopenaccesscapacityshallbemaintainedbyOpen

accessCustomerwithRVPN.

(2)OpenAccessCustomershallfurnishasecuritydepositofamountequivalentto3monthsof

theaveragebillingtowardsStateLoadDispatchCentrechargesandSchedulingChargesto

SLDC.

(3)Asecuritydepositofamountequivalentto3monthsoftheaveragebillingtowards

wheelingchargesonDistributionSystemforOpenAccessshallbefurnishedbyOpen

AccessCustomertoconcernedDiscom..

(4)TheOpenAccessCustomershallfurnishsecuritydepositseitherinCashorLetterof

Credit(s)fortheaboveestimatedaveragebillingamountatthetimeofAgreementbutin

anycasebeforeconnectingintosystem.

ComplianceofGridCodeandDistributionCode

AllthepartiesagreetocomplywiththeprovisionsofRajasthanGridCode,DistributionCodein

forcefromtimetotimeforuseofDistributionSystemofDistributionLicenseeincludingthe

ConnectionConditionsmentionedtherein.

TransmissionPerformanceStandards

BoththepartiesagreesthatallequipmentconnectedtotheStateTransmissionSystemshallbeof

suchdesignandconstructiontoenabletheRVPNtomeettherequirementofPerformance

Standardsspecifiedatinter-connectionpoint.TheOpenAccessCustomerconnectedtoState

TransmissionSystemshallensurethattheirloadsdonotcauseviolationofthesestandards.

UnforeseenCircumstances

Openaccessonthetransmissionsystemandwheelingondistributionsystemshall

besubjecttotransmissionanddistributionsystemconstraints.Theprovisionof

Openaccessshallremainsuspendedduringsuchperiodattheabsolutediscretion

ofSLDC/Distributionlicensee.

SchedulingbySLDC

TheOpenAccessCustomershallabidetheSLDCscheduleandshallcomplywithalldirections

issuedbySLDC.

TermofAgreement

Theopenaccessallowedshallberemainvalidupto-----

Inwitnesswhereofthepartieshavesignedthisagreementontheday,monthandyearfirst

writtenabove.

Forandonbehalfof

Forandonbehalfof

ShortTermOpenAccessCustomer

RajasthanRajyaVidyutPrasaranNigam------

Limited------

InthepresenceofInthepresenceof

11

22