MassDEP Policies for Public Water Systems

Table of Contents

87-04 Procedures for Use of EPA’s Proposed Maxium Contaminant Levels

87-05Declaration of State of Water Supply Emergency (revised 2/97)

87-06Boil Water Orders or Do Not Drink Orders

87-17Water Vending Machine Policy

87-17a Water Vending Machine Policy Addendum

87-18 DEP Sampling and Analysis for Public Water Systems

87-25Items to Consider When Conditioning New Source Approvals

87-27Procedures Relative to the Detection of Contaminants During the New Source

Approval Process

88-03Interim Wellhead Protection/Area

88-06Estimated Registration Statement

88-10Daily Consumption per Person

88-11Public Water System Determination

88-12Procedure for Changing Public Water Supply Classification

88-14Secondary Standards Exceedances

88-16Volatile Organic Compound Sampling: Confirmation Sampling and Discounting Results

88-19Request for Final Inspection of New or Improved Treatment Facilities

88-23Consecutive Public Water Systems – Bacterial Contamination Validation Sampling

88-25Policy on Metering Requirements for Water Management Act Registrants and

Permit Applicants

89-01New Product or Technology Review Policy

89-04Review of Water Conservation Plans Submitted by Public Water Suppliers for Water Management Permits

89-06Public Notice Requirements – Water Management Act Application

90-04Pilot Study Requirements for Proposed Treatment

91-02Treatment for Radionuclide Removal

91-05Follow-up Action for Coliform positive Results from a Single Routine Sampling Point

91-06Variances from the Total Coliform Rule

91-07Acceptability of Results from Radiological Laboratories Certified Outside Massachusetts

91-09Use of Bottled Water by Public Water Suppliers

92-05Procedure for Determining the Activity Type and Status of a Drinking Water Source

92-07Bulk Water Suppliers – Sampling Requirements and Transport Responsibility

93-01aRequirement for Disinfection with Water Supply Treatment

93-02Operation and Maintenance Manuals

94-02Determination of Public or Private Water System Type for Establishments Serving Food

94-03Implementation of Zone I Requirements

95-04PWS Control of Zone I Within Publicly Owned Lands

96-02Safe Drinking Water Act Assessment Billing and Collection Policy

97-01Zone II Status Policy

98-01 Antennae Policy Guidelines

DWS G98-01

DWP 98-01

03-01Review of Sewer Line and Water Supply Protection (updated for Jan 2003)

06-01Small Water System Operator Requirements

08-01Substantial Modifications to a Public Water System that Require a Permit

08-02Actions to Protect Public Health in the Period between Federal Rule Promulgation and State Promulgation

09-02Pipe Bursting of Potable Water Mains Using Pre- and Post-Chlorinated HDPE Pipe

Superseded MassDEP Drinking Water Policies

The following policies have been deleted from the policy page because they have been superseded by: (1) subsequent policy changes, (2) incorporation into the Drinking Water Regulations of Massachusetts (310 CMR 22.00), or (3) incorporation into the Guidelines and Policies for Public Water Systems.

Deleted

PolicyName of Deleted Policy

86-01Submission of Hydrogeological Reports by Hydrogeologists

86-02Procedure for New Groundwater Source Approvals

86-03Non-Municipal Water Quality Analysis (incorporated into 310 CMR 22.11A)

87-02Procedure for Performance of Sanitary Surveys by the Boston Office

87-09Adoption of DWS Water Supply Contamination Correction Policies WSCC-1 through WSCC-6

87-12Quality Assurance for Groundwater Modeling

87-14Microbiological Sampling - Bad and Excluded Samples (incorporated into310 CMR 22.05(3))

87-19Definition of a New Source

87-20The Determination and Management of the Protective Radius (Zone II) for Public Water Supply Wells

87-26Steps for New Source Approval for Wells With Yields Less Than 100,000 Gallons Per Day

88-01Trichloroethylene (TCE) Air Stripper Policy

88-02Review of Sewer Line/Water Supply Protection

88-04aProcedures for Determining Whether a Potentially Productive Aquifer Constitutes a Potential Public Groundwater Source

88-05Adoption of DWS Water Supply Contamination Correction Policies WSCC-7 through WSCC-12

88-07aPoint of Use and Point of Entry Drinking Water Treatment Devices

88-09Watershed Resource Protection Plan Policy

88-13Use of Registered Well Drillers Only

88-21Coordination of New Source Approval and Water Management Act Permits

89-03Policy on Issuance of Interim Permits

89-07Developmental Procedures for Low Yield Bedrock Public Water Supply Wells

89-09Watershed Resource Protection Plan

89-10Developmental Procedures for High Yield Bedrock Public Water Supply Wells

89-11Developmental Procedures for All Confined Aquifer Public Supply Wells

91-10When to Use a Pre-enforcement Letter

91-11Minimum Information for the Cover Page of the Notice of Non-compliance

92-01Interim Wellhead Protection Area Policy for Small Wells

92-03Developmental Procedures for the Use of Springs as Public Water Supplies

92-04Procedure for Approving an Exception to an Established DWS Policy /Guideline

92-06Division of Water Supply – Operational Consistency

92-08Use of Floordrains in Water Supply Pump Houses

94-01Viability Assessment and Assurance

94-04Process for Redelineating and Approved Zone II

94-06Default Radii for IWPA and Zone I Areas for Non-Community Wells