FULL PLANS SUBMISSION
The Building Act 1984
The Building Regulations 2010
Building Regulations
Plan Number:
Building Control
Bishops’ College Churchgate
Cheshunt Hertfordshire EN8 9XE
Tel: 01992 785566 Fax: 01992 350386
Email:
Only one copy of this form need be filled in by the person who intends to carry out building work or agent and deposited with a copy of plans and specification and the prescribed plan fee. Please type or use block capitals.
1 /Applicant’s Details
Name:Address:
Post code:Tel No:Mob No: Fax:
E-mail:
2 / Agent’s details(if applicable)
Name:
Address:
Post code:Tel No: Mob No: Fax:
E-mail:
3 /
Location of building to which work relates
Address:Post code:Tel No:Fax:
4 /
Proposed work
Description:Is the works over or within 3 metres of a public sewer? YesNo
Is the work (or part) subject to Partnering or previously LANTAC approved? (Enclose certificates) YesNo
5 /
Use of building
1 If new building or extension please state proposed use:2 If existing building state present use:
3 Is the use of the building controlled under the Regulatory Reform (Fire Safety) Order 2005? YesNo
6 / Conditions
Do you consent to the plans being passed subject to conditions where appropriate? YesNo
7 / Fees (not refundable)(see Table 1 - 3 of Fees)
New Dwelling: Table 1- please select number of new Dwellings: 12345more than 5 Fee: £
Conversion:Table 1 - please select number of Flats created: 23more than 3 Fee: £
Extensions: Table 2/3 - please select floor area: <10m2 10-40m² 40-100m² >100m² Fee: £
Alterations: Table 2/3- please state the estimated cost exc. VAT: £ Fee: £
Other Works:Please contact Building Control ManagerTotal fee enclosed: £
8 /Completion Certificate
A Completion Certificate will be issued on satisfactory completion of work providing that it has been fully inspected and seen to be in compliance with Building Regulations9 /
Planning
If planning permission has already been granted or an application has been submitted please quote the reference number and/or date of submission: 7/ - Date:10 /
Statement
This notice is given in relation to the building work as described, is submitted in accordance with Regulation 12(2)(b) and is accompanied by the appropriate fee. I understand that further fees will normally be payable following the first inspection by the local authority. I agree to the statutory period within which the Council may consider this application being extended to two calendar months from the date of deposit of plans.Name: Signature: Date:
Bc008 –May 2012
1.The applicant is the person on whose behalf the work is being carried out, e.g. the building’s owner.
2. One copy of this notice should be completed and submitted with plans and particulars in duplicate in accordance with the provisions of Building Regulation 14.
3.Subject to certain exceptions a Full Plans Submission attracts fees payable by the person by whom or on whose behalf the work is to be carried out. Most fees are payable in two stages. The first fee must accompany the deposit of the plans and the second fee is payable after the first site inspection of work in progress. The second fee is a single payment in respect of the relevant work to cover all site visits and consultations which may be necessary until it is satisfactorily completed.
Table 1 prescribes the plan and inspection fees payable for new dwellings and conversions into new dwellings. Table 2 prescribes the fees payable for small alterations and extensions to a dwelling home, and the addition of a small garage or carport. Table 3 specifies the fees payable for all other cases.
The appropriate fee is dependent upon a type of work proposed. Fee scales and method and calculations are set out in the Guidance Notes on the fees is available on request. All cheques to be made payable to the Borough of Broxbourne.
4.Subject to certain provisions of the Public Health Act 1936 owners and occupants of premises are entitled to have their private foul and surface water drains and sewers connected to the public sewers where available. Special arrangements apply to trade effluent discharge. Persons wishing to make such connections must give not less than 21 days notice to the appropriate authority.
5.LABC services provides a partner authority scheme and also national type approval for a range of building types, building systems and major building elements where they are used repeatedly.
If this proposal is used the partnering scheme please answer YES and provide further details, including name of partner authority, in section 7. If the work proposed or any part of it is subject to a LANTAC approval please answer YES and enclose a copy of the appropriate current certificates. If there is any variation in this proposal from that shown on LANTAC type approval plans attention should be drawn to it in a covering letter. Further information on LANTAC schemes is available from your local Building Control services office, LANTAC, Local Government House, Smith Square, London, SW1 3HZ or LABC services, address overleaf.
6.Premises that are notcurrently designated for the purpose of the Regulatory Reform (Fire Safety) Order 2005 are:
Asingle private dwelling,and any areas within domestic premises which are not used in common by the occupants of more than one such dwelling.
7.Section 16 of Building Act 1984 provides for the passing of plans subject to conditions. The conditions may specify modifications to the deposited plans and/or that further plans shall be deposited.
8. Persons proposing to carry out building work or make a material change of use of a building are reminded that permission may be required under the Town and Country Planning Acts.
9. Further information and advice concerning the Building Regulations and planning matters may be obtained from the local authority.
Bc008 –May 2012