Final design of the Brekovica bridge over Una river at regional road Brekovica – Bihać

Spans and total length: L=20,90+21,20+20,9=63,00m

Construction method: composite precast T beams with monolithic slab

Material of superstructure: prestressed concrete

Client: Public Company Roads Federation of Bosnia and Herzegovina

Location: Brekovica, intersection of regional and major road M14

Date: from December 2014 to January 2015

Final design of the Počitelj bridge over Neretva river from km 3+445 to km 4+390 at Počitelj – Zvirovići motorway section.

Spans and total length: L=105 + 5×147 + 105=945,00m

Construction method: balanced cantilever method

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Počitelj – Zvirovići motorway section

Date: from January 2014 to December 2014

Final design of the Vrbovac underpass at Svilaj – Odžak motorway section in km 3+500

Spans and total length: L=24+34+24=82,00m

Construction method: on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Roads Federation of Bosnia and Herzegovina

Location: Vrbovac near Svilaj

Date: from July 2014 to August 2014

Final design of the Gradina overpass at Počitelj – Zvirovići motorway section.

Arch span and total length: Lspan=33m, Llength=37m

Construction method: arch on falsework

Material of superstructure: reinforced concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Počitelj – Zvirovići motorway section

Date: from January 2014 to May 2014

Final design of 4 underpasses at Počitelj – Zvirovići motorway section.

Span and total length: Lspan=9 -18m, Ltotal=45m

Construction method: on falsework

Material of superstructure: reinforced concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Počitelj – Zvirovići motorway section

Date: from January 2014 to May 2014

Final design of the bridge M05.0-2-08 rehabilitation over Pliva river at major road M5

Spans and total length: L=25 +25 +25 =75,00m

Construction method: incremental launching method

Material of superstructure: steel – concrete composite bridge

Client: Public Company Roads Federation of Bosnia and Herzegovina

Location: Jajce

Date: from September 2013 to December 2013

Final design of the Bojnik bridge at Butile - -Vlakovo motorway section

Spans and total length: L=20 + 3×25 +20=115,00m

Construction method: span by span, on fixed falsework

Material of superstructure: prestressed concrete

Client: JV Euroasfalt Sarajevo Ltd & ŽGP Ltd Sarajevo

Location: Bojnik, Sarajevo bypass

Date: from August 2013 to October 2013

Final design of the Treševine overpass at Butila - -Vlakovo motorway section

Spans and total length: L=47m

Construction method: on fixed falsework

Material of superstructure: prestressed concrete

Client: JV Euroasfalt Sarajevo Ltd & ŽGP Ltd Sarajevo

Location: Treševine, Sarajevo bypass

Date: from August 2013 to October 2013

Final design of the Dubravice bridge at Kaonik – Vitez expressway section

Spans and total length: L=24 + 6×30 + 24=228,00m

Construction method: span by span, on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Kaonik - Vitez expressway section

Date: from January 2013 to March 2013

Final design of the Kaonik 1 bridge at Kaonik – Vitez expressway section

Spans and total length: L=27 + 3×34 + 27=156m

Construction method: span by span, on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Kaonik - Vitez expressway section

Date: from January 2013 to March 2013

Final design of the Kaonik 2 bridge at Kaonik – Vitez expressway section

Spans and total length: L=27 + 2×34 + 27=122m

Construction method: span by span, on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Kaonik - Vitez expressway section

Date: from January 2013 to March 2013

Detailed design of the Pavlovići viaduct at Zvirovići – Kravice motorway section

Spans and total length: L=33 + 7×43 +33=367m

Construction method: incremental launching method

Material of superstructure: prestressed concrete

Client: OHL ŽS Brno, Czech Republic

Location: Pavlovići, Zvirovići – Kravice motorway section

Date: from August 2012 to January 2013

Final design of the Zukići 1 viaduct at Tarčin - Konjic motorway section

Spans and total length: L=24 + 4×30 + 27=171m

Construction method: span by span, on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Zukići, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Zukići 2 viaduct at Tarčin - Konjic motorway section

Spans and total length: L=45 + 3×50 + 45=240m

Construction method: incremental launching method

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Zukići, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Podhrastovi viaduct at Tarčin - Konjic motorway section

Spans and total length: L=50 + 90 +125 +90 +50=405m

Construction method: balanced cantilever method

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Podhrastovi, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Pirići viaduct at Tarčin - Konjic motorway section

Spans and total length: L=24 + 2×30 + 27=111m

Construction method: span by span, on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Pirići, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Vrbljani 1 viaduct at Tarčin - Konjic motorway section

Spans and total length: L=35 + 7×50 + 35=420m

Construction method: incremental launching method

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vrbljani, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Vrbljani 2 viaduct at Tarčin - Konjic motorway section

Spans and total length: L=40 + 3×50 + 40=230m

Construction method: incremental launching method

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vrbljani, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Kanjina 1 viaduct at Tarčin - Konjic motorway section

Spans and total length: L=43 + 6×54 +43 =410m

Construction method: incremental launching method

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Kanjina, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Kanjina 2 viaduct at Tarčin - Konjic motorway section

Spans and total length: L=70 + 125 +70=265m

Construction method: balanced cantilever method

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Podhrastovi, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Galjevo 1 viaduct at Tarčin - Konjic motorway section

Spans and total length: L=29 + 45 + 3×50 +45 +32=301m

Construction method: incremental launching method

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Galjevo, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Galjevo 1 viaduct at Tarčin - Konjic motorway section

Spans and total length: L=29 + 45 + 3×50 +45 +32=301m

Construction method: incremental launching method

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Galjevo, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Donje Selo viaduct at Tarčin - Konjic motorway section

Spans and total length: L=32 + 40 +2×50 +40 =212m

Construction method: incremental launching method

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Donje Selo, Tarčin - Konjic motorway section

Date: from Januar 2012 to Decembar 2012

Final design of the Bila bridge at Vitez – Nević polje expressway section

Spans and total length: L=27 + 6×34 + 27=258m

Construction method: span by span, on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vitez – Nević polje expressway section

Date: from May 2011 to December 2011

Final design of the Mali Mošunj 1 bridge at Vitez – Nević polje expressway section

Spans and total length: L=24 + 4×30 + 24=168m

Construction method: span by span, on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vitez – Nević polje expressway section

Date: from May 2011 to December 2011

Final design of the Mali Mošunj 2 bridge at Vitez – Nević polje expressway section

Spans and total length: L=27 + 34 + 27=88m

Construction method: on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vitez – Nević polje expressway section

Date: from May 2011 to December 2011

Final design of the Stara Bila 1 bridge at Vitez – Nević polje expressway section

Spans and total length: L=30m

Construction method: on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vitez – Nević polje expressway section

Date: from May 2011 to December 2011

Final design of the Stara Bila 2 and 3 bridge at Vitez – Nević polje expressway section

Spans and total length: L=32m

Construction method: on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vitez – Nević polje expressway section

Date: from May 2011 to December 2011

Final design of the Nova Bila bridge at Vitez – Nević polje expressway section

Spans and total length: L=32m

Construction method: on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vitez – Nević polje expressway section

Date: from May 2011 to December 2011

Final design of the Pećuhe bridge at Vitez – Nević polje expressway section

Spans and total length: L=21 + 23 +21 =65m

Construction method: on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vitez – Nević polje expressway section

Date: from May 2011 to December 2011

Final design of the Nević polje 1 bridge at Vitez – Nević polje expressway section

Spans and total length: L=24 + 3×30 +24 =138m

Construction method: span by span on fixed falsework

Material of superstructure: prestressed concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vitez – Nević polje expressway section

Date: from May 2011 to December 2011

Final design of the Nević polje 2 bridge at Vitez – Nević polje expressway section

Spans and total length: L=20m

Construction method: on fixed falsework

Material of superstructure: reinforced concrete

Client: Public Company Motorways Federation of Bosnia and Herzegovina

Location: Vitez – Nević polje expressway section

Date: from May 2011 to December 2011

Preliminary Design for Interchange Johovac and conceptual designs for objects at inter-regional interchange

Investor: Ministry of communications and transport B&H

Year: 2011

Main Design for highway Interchange Lašva - Interchange Nević polje

Investor: Federal Office for Roads

Year: 2011

Surveying of current condition of antenna pole 250 m height in Donje Moštre – Visoko

Investor: Public Television Service B&H

Year: 2010

Conceptual Design for the route and objects on Main Road Foča-Plužine

Investor: European commission

Year: 2010

Main Design for overpass Kamenica on displaced main road M5

Investor: Federal Office for Roads

Year: 2010

Main Design for Bridge Mrežnica at displaced main road M5

Investor: Federal Office for Roads

Year: 2010

Main Design for reconstruction of Bridge Lukavac at main road M.4 Doboj-Šički over abandoned riverbed

Investor: Federal Office for Roads

Year: 2010

Main Design for structures along the Corridor Vc Motorway section Svilaj-Vukosavlje (LOT1)-Bridges M1-M5

Investor: Ministry of communications and transport B&H

Year: 2010

Main Design for structures along the Corridor Vc Motorway section Svilaj-Vukosavlje (LOT1)-Overpasses NP1-NP4

Investor: Ministry of communications and transport B&H

Year: 2010

Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Underpass Rudanka

Investor: Ministry of communications and transport B&H

Year: 2010

Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Bridge Rudanka

Investor: Ministry of communications and transport B&H

Year: 2010

Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Bridge Kraševo

Investor: Ministry of communications and transport B&H

Year: 2010

Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Viaduct Putnikovo brdo

Investor: Ministry of communications and transport B&H

Year: 2010

Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Bridge Lukavička rijeka

Investor: Ministry of communications and transport B&H

Year: 2010

Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Bridge Bosna

Investor: Ministry of communications and transport B&H

Year: 2010

Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Bridges Usora 1,2,3

Investor: Ministry of communications and transport B&H

Year: 2010

Main Design for structures along the Corridor Vc Motorway section Johovac-Doboj Jug (LOT3)-Overpass Prisade

Ministry of communications and transport B&H

Year: 2010

Main Design for reconstruction of bridge over River Poričnica at main road M.16.3

Investor: Federal Office for Roads

Year: 2010

Main Design for reconstruction of bridge over Jala River at main road M.18.0

Investor: Federal Office for Roads

Year: 2010

Main Design for noise protection panels at Corridor Vc Motorway sections, LOT 1, LOT 3 and section Vlakovo-Lepenica

Investor: Ministry of communications and transport B&H

Year: 2010

Main Design for 7 facilities of TMCC complex Drivuša

Investor: P.E. Federal Office for construction, managing and maintaining of Motorway

Year: 2009

Main Design for the bridge over River Bosna, on Corridor Vc Motorway section Drivuša- Bilješevo

Investor: P.E. Federal Office for construction, managing and maintaining of Motorway

Year: 2009

Main Design for Bridge M1, at Corridor Vc Motorway section Drivuša- Bilješevo

Investor: P.E. Federal Office for construction, managing and maintaining of Motorway

Year: 2009

Main Design for bridge and uderpass Drivuša at Corridor Vc Motorway section Drivuša- Bilješevo

Investor: P.E. Federal Office for construction, managing and maintaining of Motorway

Year: 2009

Main Design for viaduct Bilješevo at Corridor Vc Motorway section Drivuša- Bilješevo

Investor: P.E. Federal Office for construction, managing and maintaining of Motorway

Year: 2009

Main Design for underpass Lučani 1, Lučani 2 and Lučani 3 at Corridor Vc Motorway section Drivuša- Bilješevo

Investor: P.E. Federal Office for construction, managing and maintaining of Motorway

Year: 2009

Main Design for retaining walls at Corridor Vc Motorway section Drivuša- Bilješevo

Investor: P.E. Federal Office for construction, managing and maintaining of Motorway

Year: 2009

Main Design for retaining walls on regional road R445, section Drivuša- Bilješevo

Investor: P.E. Federal Office for construction, managing and maintaining of Motorway

Year: 2009

Main Design for Bridge no.8 at Interchange Kamenica on newly designed route of Bypass Bihać

Investor: Federal Office for Roads

Year: 2008

Main Design for Bridge Mrežnica on newly designed route of Bypass Bihać

Investor: Federal Office for Roads

Year: 2008

Bridges Mo-1, Mo-2 and Mo-3 on regional road R445, section Drivuša – Kakanj

Investor: Federal Office for Roads

Year: 2008

Main Design for reconstruction of Bridge Topčić Polje on main road M.17, section Doboj-Zenica-Lašva

Investor: Federal Office for Roads

Year: 2008

Main Design for rehabilitation of bridge in Kiseljak on main road M.5

Investor: Federal Office for Roads

Year: 2008

Main Design for high retaining walls in Lucani on Motorway i Regional road R445

Investor: Federal Office for construction, managing and maintaining of Motorway and Federal Office for Roads

Year: 2008

Main Design for MO-3 bridge on Regional road R-445

Investor: Federal Office for Roads

Year: 2008

Main Design for Moscanica bridge on Motorway Zenica - Sarajevo, section Drivusa- Biljesevo

Investor: Federal Office for construction, managing and maintaining of Motorway

Year: 2008

DOSLA DO OVDJE

Main Design for new bridge M-4 on Zenica-Sarajevo Motorway section Biljesevo-Kakanj

Investor: Federal Office for Roads

Year: 2008

Main Design for Pedestrian bridge over Miljacka river, between streets Obala Kulina-bana and Obala Maka Dizdara

Investor: Municipality Centar, Sarajevo

Year: 2008

Main Design for rehabilitation of bridge over Lepenica river in Kiseljak

Investor: Federal Office for Roads

Year: 2008

Main Design for rehabilitation of Flying control object on Podgorica Airport

Investor: Podgorica Airport

Year: 2008

Main Design for side toll stations in Visoko and Podlugovi

Investor: Federal Office for construction, managing and maintaining of Motorway

Year: 2008

Main Design for the bridge over Bosna river on access road of Drivuša interchange on Motorway section Zenica - Sarajevo, section Drivuša – Bilješevo

Investor: Federal Office for construction, managing and maintaining of Motorway

Year: 2008

Main Design for underpass Drivuša

Investor: Federal Office for construction, managing and maintaining of Motorway

Year: 2008

Main Design for underpass Lucani

Investor: Federal Office for construction, managing and maintaining of Motorway

Year: 2008

Main Design for rehabilitation of landslide Bogatići retaining walls

Investor: Federal Office for Roads

Year: 2007

Main Design for reservoirs in Tešanj , Mostar, Zenica, Vukosavlje and near Tunnel Vijenac (V=100m3 i 600m3)

Investor: Municipalities

Year: 2007

Main Design for rehabilitation of Bridge Brloški Potok on Main Road M.18

Investor: Federal Office for Roads

Year: 2007

Main Design for rehabilitation of Bridge over Railway in Šićki Brod M.18

Investor: Federal Office for Roads

Year: 2007

Main Design for the Bridge over River Bosna, railway line and local road (“Zli Brijeg”) on Corridor Vc route

Investor: Federal Office for Roads

Year: 2007

As-built design for of Krsmanovića foundation in Brčko

Investor: Brčko District Government

Year: 2007

Main Design for closed reception facility for irregular migrants in BH

Investor: IOM-EU

Year: 2007

Main Design for reconstruction and additional building for Air traffic control center in Sarajevo

Investor: Federal Ministry of transport and communications

Year: 2007

Main Design for rehabilitation of bridge over railway tracks in Sicki Brod at km 1+004 on M 18.0-2

Investor: Federal Office for Roads

Year: 2007

Main Design for rehabilitation of old airport building in Podgorica

Investor: Podgorica Airport

Year: 2007

Main Design for rehabilitation ofnrailway stations in Niksic, Slap, Stubica, Ostrog and Danilovgrad on Niksic-Podgorica railway

Investor: OHL ŽS, a.s. (Željeznica Crne Gore)

Year: 2007

Main Design for rehabilitation of bridge over Brloski potok near Kladanj on main road M 18.0-2

Investor: Federal Office for Roads

Year: 2007

Main Design for revitalisation of Bridge of Blaz Jovanovic over Moraca river in Podgorica

Investor: Construction agency Podgorica