BC Hydro F2006 Open Call for Power - Seller’s Plant Description Form

CFT FORM # 2

SELLER’S PLANT DESCRIPTION FORM

Note: This is a form field document. Enter data only in the form fields. All other text is in read only format. Do not otherwise modify or supplement this document. Information required in sections 4 and 5 of this document may be updated and amended when the Tender is submitted, and is also subject to further update and amendment after award under section 6.3 of the EPA. Capitalized terms used in this form have the meanings given in the CFT or the EPA.

Full Legal Name of Registered Bidder:

Project Name:

1.Location: The Seller’s Plant is located at:

The approximate latitude and longitude of the site of the power house forming part of the Seller’s Plant is: (latitude) and (longitude)

2.Site: The Seller’s Plant is located on property legally described as:

3.Energy Source: The primary Energy Source for the Seller’s Plant is which accounts for % (+/-5%) of the annual Energy Source for the Seller’s Plant. The following additional Energy Sources are used at the Seller’s Plant (including applicable annual percentages (+/-5%)):

[Note to Bidders: The percentages listed above should total to 100%.]

Where more than one Energy Source is used at the Seller’s Plant, describe whether the Energy Sources are consumed separately or whether multiple Energy Sources are consumed at the same time:

Describe all storage facilities for the Energy Source(s):

4.Principal Equipment: The Seller’s Plant includes the following principal equipment:

Type of Equipment / Description of Function/Location / Manufacturer / Model / Key Technical Parameters (include nameplate capacity of generators and state applicable units)

5.Key Structures: The Seller’s Plant includes the following key structures:

Structure / Location / Description of Structure (including approx. size in square meters)

6.Access Roads: Access to the site on which the Seller’s Plant is located is via which is owned by: .

7.Interconnection Facilities: As described in the F2006 CFT Preliminary Interconnection Study Report prepared by the Transmission Authority or the Distribution Authority (as applicable) dated ______2006.

[Note to Bidders: To the extent that the F2006 CFT Preliminary Interconnection Study Report is not available when this form is pre-tendered, please provide information where possible for the interconnection scenario applicable to your Project.]

i)Direct Interconnection - For Projects interconnected directly to the Transmission System or Distribution System, please provide

  • Point of Interconnection on the Transmission System/Distribution System:
  • Describe metering facilities and configuration (attach diagram if necessary)

ii)Indirect Interconnection - For Projects interconnected indirectly to the Transmission System or Distribution System through a third party including:

a)a host facility;

b)a private transmission or distribution line; or

c)a transmission system owned and/or operated by a third party, other than BCTC, such as the Fortis system;

please provide:

  • Point of Interconnection to the third party facility:
  • Point of Delivery on the Transmission System/Distribution System:
  • Description of the infrastructure between the Point of Interconnection and Point of Delivery (i.e. host facility or the transmission/distribution line owned privately or by a third party):
  • Describe metering facilities and configuration (attach diagram if necessary)

8.Water Supply:

9.Effluent Disposal:

10.Site Layout: Attach depiction of the expected layout of the key facilities in the Seller’s Plant as Schedule 1.

11.Plant Capacity: MW. [Note to Bidders: See definition of “Plant Capacity” in the CFT Glossary.]

Issued 8 December 20051