Prepared by: ______
Y. Makdisi
Date: ______
Reviewed by: ______
R. Prigl
Date: ______
Approved by: ______
D. Lowenstein
Date: ______
ESRC Walk through Check-Off List for E955 in the U line
The Proton Radiography experiments require users to enter the U-line primary area The users will enter U1 primary are under Controlled Access. Conventional safety issues include, working with small amounts of radioactivity, beryllium, and lead during the preparation of targets.
Checklist Item # /Initial
/ Title * / Description Of Check-Off List Item / PriorityCK-E955-01-01
/ ECR / Update the changes to the Environmental Review of the experiment. / Prior to start of experimentCK-E955-01-02 / FE / Carry out acceptance tests of the trailer fire alarm and magnetic door interlock / Prior to start of experiment
CK-E955-01-03 / LE / Install emergency lights in all the experimental trailers / Prior to start of experiment
CK-E955-01-04 / ES955 / Replace the power cord on the CAMAC crate in the unclassified trailer / Prior to start of experiment
CK-E955-01-05 / ES955 / Separate, where possible, the high voltage and signal cables in the cable trays. / Prior to start of experiment
CK-E955-01-06 / ESHC / Measure as soon as possible, the noise levels in the 919H house and if necessary post accordingly. / Post Start
CK-E955-01-07 / LE / Electrically bond the object stand. / Prior to beam
CK-E955-01-08 / LE / Electrically bond the Dalek controllers located under ZQ2 in the tunnel. / Prior to beam
CK-E955-01-09 / LE / Inspect the operation of all motor drives after installation / Prior to start of experiment
CK-E955-01-10 / ES955 / Provide material for review and approval of the hydrogen chamber to ESRC chair. / Prior to operating the chamber
CK-E957-01-11 / LE / Post “explosive gas” on the tunnel entrance and hydrogen chamber / Prior to start of experiment
CK-E957-01-12 / MCRGL / Check off list is complete / Prior to start of experiment
*
ESHC – ES&H Coordinator, Lori Stiegler
FE – BNL Fire engineering, Joe Levesque
LE – Liaison Engineer, Joseph Scaduto
LP – Liaison Physicist, Ralf Prigl
ES955 – Experiment 955 Spokesperson, Chris Moris
ECR- Environmental Compliance Representative, Gary Schroeder
MCRGL- Main Control Room Group Leader, Peter Ingrassia