(NEW 145)
NAME OF APPLICANT/COMPANY:
CONTACT PERSON: TELEPHONE#:
E MAIL:
ADDRESS:
MAINTENANCE: 3230AVIONICS: 5230PTRS #:
REPAIR STATION PRECERT/FINAL NUMBER:
CPM:
PREAPPLICATION PHASE
Insp. Date
A.RESPOND TO INITIAL INQUIRY
B.DISCUSS WITH APPLICANT
- Technical expertise required, to include:
Aviation-related experience
Proposed organizational structure
Knowledge of the specific maintenance functions
to be performed
- The rating required for type of work
- Requirements for sufficient personnel
- Facility requirements for ratings sought
- Requirements for current technical data
- Point of contact
C.PREAPPLICATION STATEMENT OF INTENT (PASI)
FAA FORM 8400-6
- Advise applicant of complexity of process
- Provide applicant an estimated time frame for completion
- Advise applicant to develop time line
D.INITIATE CERTIFICATION PROCESS
1.Review PASI
Review for acceptance & completeness
Notify the regional office
2.Obtain Precertification Number: see above
3.Check “Information Only” block, enter date PASI received/reviewed
- “Remarks” section enter “Proceeding with formal certification”
and precertification #
5.Certification team designated see above
CPM contacts applicant to arrange preapplication meeting
Insp. Date
E.CONDUCT PREAPPLICATION MEETING N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
1.Discuss regulations applicable
- Provide the following:
AC 145-9
FAA Form 8310-3
FAA Form 8610-2, if applicable
- Inform applicant about formal application
Completed FAA Form 8310-3
Repair station manual and quality control manual
Letter requesting application be processed
Letter of compliance
Repairman application & Letter of Recommendation
Limited Rating-make & model of particular item
Class 2 propeller rating-list by make of propeller
Limited Specialized Services-specification reviewed
by FSDO & ACO, could cause delay
Inspector/Team evaluates results of preapplication meeting
Remarks:
FORMAL APPLICATION PHASE
Insp. Date
A.RECEIVE FORMAL APPLICATION N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
B.EVALUATE THE APPLICATION PACKAGE
C. APPLICATION MEETING N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
Remarks:
DOCUMENT COMPLIANCE PHASE
A.REVIEW THE APPLICATION PACKAGE N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
- A completed FAA Form 8310-3
- Repair Station Manual
- Quality Control Manual
- Training Manual
- Letter of Compliance
- Application for Repairman Certificate and Letter of Recommendation
- List of makes and models of particular item(s) to be maintained
and the nature of the work to be performed
** SEE NOTE ORDER 8300.10, VOLUME 2, CHAPTER 162**
- List by make of the propeller for a Class 2 Propeller Rating
- A copy of the approved specification for the work to be performed
for a Specialized Service rating
- A copy of a capabilities list, if applicable (§145.215)
B.DOCUMENT ANY DEFICIENCIES
DEMONSTRATION & INSPECTION PHASE
Insp. Date
A.COORDINATE AND SCHEDULE AN INSPECTION N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
1.Verify Repair Station Manual and Quality Control Manual are followed
2.Use Letter of Compliance to confirm facility meets
requirements of regulations
B.PERFORM A HOUSING AND FACILITY INSPECTION N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
1.Work being done protected from weather elements, dust, and, heat.
2.Temperature control, humidity, and other climatic conditions
**ALL TOOLS AND EQUIPMENT MUST BE IN PLACE AT TIME OF CERTIFICATION OR RATING APPROVAL (§145.51(B))**
- Inspection System: Order 8300.10, Volume 2, Chapter 164
Employees familiar with & capable of performing duties
Facilities are adequate to perform functions
defined in RSM & QCM
RS has Quality Control System which ensures articles airworthy
- Maintenance recordkeeping system: §43 & §145.219
- System for reporting serious defects or unairworthy conditions
to ensure compliance with §145.221
- Tooling & equipment properly stored and maintained in working order
Calibration is performed at established intervals §145.109
Special equipment and tools obtained as needed per §145.109,
- Material
Ensure RS has proper controls for stored material and
recordkeeping system that has document traceability
back to place of purchase
Traceability off all materials in the supply room must have
documentation to show the material qualification
If necessary, RS surveillance program of suppliers to meet
the above
- Calibration Standards
Calibration standards of all test and measuring equipment
manufactured in the US must meet manufacturers standards
Foreign equipment must meet standards of manufacturer
Test & measuring equipment manufactured by RS must
meet the calibrations standards recommended by the
manufacturer of the article be measured or tested
C.EVALUATE MAINTENANCE ORGANIZATION N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
- Sufficient number of personnel to satisfy volume & type,
as required by part 145, subpart D.
Ensure an employee is designated as the Accountable Manager
Ensure qualified personnel are provided to plan, supervise,
perform, and approve for return to service the work for
which it is rated
Ensure it has a sufficient number of employees with
training or knowledge and experience in accomplishing
the work being performed
Determine the abilities of its non-certificated employees
performing maintenance functions based on training,
knowledge, experience, or practical tests.
- Personnel roster(s) available that includes:
Management, supervisory, and inspection personnel
responsible for the repair station operations, oversight of
maintenance functions, and personnel authorized to sign a
maintenance release for approving and article for return
to service (§145.161)
- Management, supervisory, and inspection personnel employment
summaries for those persons listed in the above paragraph
D.ANALYZE DEFICIENCIES
- If deficiencies are noted, notify the applicant in writing or meet
with the applicant to review deficiencies in detail
- Corrective action must be taken and the CPM notified in writing
by the applicant in order for the certification process to continue.
- Each deficiency and corrective action must be fully documented
and recorded in the certification file
Remarks:
CERTIFICATION PHASE
A.PREPARE CERTIFICATES N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
- Complete blocks 6-9 of FAA Form 8310-3 to show:
Findings and recommendations
Any remark or discrepancy noted during inspection
Date of inspection
Office and signature of the CPM
- Prepare FAA Form 8000-4, Air Agency Certificate
- Prepare FAA Form 8000-4-1, Operation Specifications
- If applicable, issue FAA Form 8060-4 with appropriate ratings
B.AIR AGENCY CERTIFICATES N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
See Order 8300.10, Volume 2, Chapter 162, page 162-9, paragraph 13(B)
C.OPERATIONS SPECIFICATIONS N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
See Order 8300.10, Volume 2, Chapter 162, page 162-10, paragraph 13(C)
D.PREPARE CERTIFICATION REPORT N/AKKBABBGTBRDDRHDMJFKJFCLJJAJTCKRWLJEPRDRDHS
- Report must include name & title of each ASI on the team
- Signed by the CPM & contain the following:
Copy of PASI
FAA Form 8310-3, completed
Letter of Compliance
Copy of Air Agency Certificate
Copy of issued Ops Specs
Copy of Temporary Airman Certs
Summary of all discrepancies
TASK OUTCOMES
Insp. Date
A.FILE PTRS DATA SHEET
B.COMPLETION OF CERTIFICATION TASK
- Issuance of certificate and Ops Specs
- Letter to applicant indicating that certificate is denied
- Letter to applicant confirming termination of certification process
C.DISTRIBUTE CERTIFICATION REPORT
- Retain the original certification report in the district office
- Forward one copy of the certificate report to all involved
district and regional offices
D.DOCUMENT TASK
1.File all supporting paperwork in the certificate holder/applicant’s
office file and update the VIS
FUTURE ACTIVITIES
District office must ensure that there is an orderly transition from the certification process to certificate management. Perform follow-up and surveillance inspections as required.
Remarks:
1