MuhammadIqbal

Position Applied For: Plant Operator

Postal Address: Disst. Khanewal Teh. Kabirwala p/o sarai sidhu

Mozabaragh sarghana

Mobile No: +92-333-6010628

+92-0306-7373933

Email Address:

PERSONAL INFORMATION

Father's Name:Khan Muhammad
Date of Birth: 10-03-1982

Marital Status: Married

Religion: Islam

Domicile: Khanewal (Punjab)

Nationality: Pakistani

N.I.C #: 36102-0953866-5

Languages: English, Urdu

ACADEMIC QUALIFICATIONIN

F.Sc. (Pre-Engg) with 2nd Division from B.I.S.E. Multan.

SSC. (Science) with 1st Division from B.I.S.E. Multan.

PROFESSIONAL QULIFICATION

ONE YEAR Apprenticeship as Plant Operatorfrom National Fertilizer Corporation (NFC) Institute Of Engineeringand Technological Training Multan

COMPUTER SKILL

3 Month course of Computer Operator from NFC (IET) Multan.

The Main Features are;

1. Ms Word

2. Ms Excel

PROFFESSIONAL EXPERIENCE (+06years)

Pakistan Petroleum Ltd, the pioneer of the natural gas industry in the country, PPL contributes around 26 percent of the country's total natural gas production

Oil & Gas Development Company Ltd Dhodak Gas and Condensate Processing Plant (03years) & Nand poor gas field(02years).

Pakistan Petroleum LimitedChachar Gas Field (July-2009 to date)

Worked as Plant Operator at the following unit:

Gas Sweetening (H2S Removal With MDEA)

Dehydration Unit(TEG)& its Regeneration system)

Field Utilities (R.O Unit, Sour Water treatment / Instrument Air Compressor and Hot Oil system)

Wellhead Operation

Well head compression station (Ariel compressor)

NAND PUR GAS FIELD (OGDCL) (March-2002 to March-2004)

Worked as Plant Operator at the following unit

Dehydration with TEG & its Regeneration system.

Inlet separator & Test Separator.

Manifold Gathering system

DHODAK GAS AND CONDENSATE PROCESSING PLANT

(August-2005 to July-2009)

Worked as Plant Operator at the following unitCentral Control Room DCS(Yokogawa Centum-3000 System Japan)

I have good knowledge of PLC that’s equipments like Electronic Controllers, Alarms Annunciation and Mimic Panels, ESD/OSD Panels, Fire, Gas & Smoke detection Control system, Vibration Monitoring System.

Gas and Condensate Separation by Slug Catcher and Inlet Separators.

Gas De-HydrationwithTEG& Its Regeneration System.

Gas De-Hydration With Molecular Sieves Beds (Adsorption Process)

Condensate Stabilization Unit With Overhead Compressor.(Ariel)

LPG Recovery Unit Using Turbo Expander-Recompressor. (MTC) Mafi Trench Corporation USA. And JT-Valve

Refinery (3000 bpd) Associated Condensate Fractionation Unit) Products (Gasoline, Kerosene, HSD and DFO).

Emergency Condensate Handling System.

Methanol Injection Unit and Dye Blending Package.

L.P.G. Storage Capacity 1000 Metric Tons. Dispatched Via Pipeline & Bouzer Filling Through Metering Station.

PLANTS UTILITIES

Power Generators (Gas & Diesel).

Propane Refrigeration Package (HOWDEN COMPRESSOR)Austcold Australia.

Hot Oil Heater System.

Fire Water System (Fire Water Main &jockey Pumps, Hydrants Monitors DelugeShowering Systems).

Fuel Gas System.

Instrument Air Compressors (Instruments Air /Plant Air/Utility Air).

Nitrogen Package.

Worm Flare & cold Flare System.

Foaming System, Closed Drain & Open drain systems.

Tilted Plate Separator System (TPS).

KEY RESPONSIBILITIES

As a Plant Operator carried out the regular and detailed inspection of all rotating equipment used in operation such as, Electric Motors, Turbo expander-recompress or, Engines, Pumps and Compressors, as well as static equipment such as towers, Vessels, Heat Exchangers to ensure accurate and proper functioning of each items independently.

As a Field Operator analyzing time to time on stream line factors for Plant Operation and maintaining Plant Operation with safe, reliable and healthy conditions.

Remained involved in executing the all type of jobs in plant area during normal operation and annual turn around.