TEMPORARY TRAFFIC MANAGEMENT- CONDITIONS OF OPERATIONS

Suburb: / Location:
Description of work:

GENERAL CONDITIONS

  1. There are to be no variation to the conditions listed below, or on page 2 of this form, or to any approved plan, drawing or sketch.
  1. The traffic control devices as shown on the approved plan(s) must be maintained for the duration of the work.
  1. Traffic control devices that are left over-night must be delineated as per AS1742.
  1. The traffic control devices are to conform to AS1742.
  1. The following Emergency Services are to be notified 48 hours prior to commencement of work.

Australian Federal Police:Telephone:(02) 62457224

Fax:(02) 62457316 with a copy of the approved drawing(s)

ACT Ambulance Service:Telephone:(02) 6207 9988

ACT Fire Brigade:Telephone:(02) 6207 8363

  1. Contractor to notify all directly affected parties, in writing, seven days prior to commencement of work

(e.g. local business in the area)

  1. SPECIAL CONDITIONS(OFFICE USE ONLY)


Traffic Management required after nominated hours:
  1. CONTACTS

Organisation / Contact Name / Phone
(Work) / Phone
(After hours)
Contractor
Superintendent
Principal
  1. DATES AND DRAWINGS

Proposed start date of works / Related standards and drawings
Proposed end date of works
Work to be undertaken between / ………………. and ………………
  1. RECOMMENDED FOR AUTHORISATION(To be signed by qualified person responsible for the TTM design)

Organisation / Name / Phone / Signature
  1. APPROVAL

Authorised pursuant to Part 5 of Road Transport (Safety and Traffic Management) Act 1999


Signed:

(Minister’s Delegate)

TEMPORARY TRAFFIC MANAGEMENT- CONDITIONS OF OPERATIONS

  1. ROAD OPENING PERMIT REQUIRED?YES NO

Any excavation on roads, medians, verges or car parks requires a Road Opening Permit. This can be obtained from the Operational Support Unit (02) 6207 2500. A copy of the approved TTM plan must be attached.

  1. ROAD CLOSURE NOTICE REQUIRED?YES NO

Any total closure of a road or car park requires the completion of a ‘Request for Temporary Road Closure’ form and a minimum of 2 weeks notice prior to the Closure. Details can be obtained from the Operational Support Unit(02) 6207 2500.

  1. PARKING IMPACT REQUIRES CONSULTATION?YES NO

Work that affects the operation of car parks, parking meters, loading zones etc will require consultation with Parking Operations (02) 6207 7200. Formal agreement may be required.

Name and Position

/ Signature
  1. LEASING OF PUBLIC LAND REQUIRED?YES NO

Any use of public land for storage etc. will require a formal agreement with Asset Use (02) 6207 6821

Name and Position

/ Signature
  1. WORK NEAR TREES CONSULTATION REQUIRED?YES NO

Work near trees or landscape area will require consultation with Canberra UrbanParks & Places

(02) 6207 2500. Formal agreement may be required.

Name and Position

/ Signature
Endorsed
  1. LOADING ZONE IMPACT REQUIRES CONSULTATION?YES NO

Work that affects loading zones may require consultation with the Transport Workers Union, CanberraBranch (02) 6280 9353. Formal agreement may be required.

Name and Position

/ Signature

Endorsed

  1. TAXI ZONE IMPACT REQUIRES CONSULTATION?YES NO

Work that affects a taxi zone may require consultation with the Canberra Cabs Administration

Ph: (02) 6126 1500 Fax: (02) 6126 1549

Name and Position

/ Signature
  1. TRAFFIC LIGHTS IMPACT REQUIRES CONSULTATION? YES NO

Any work or TTM arrangement that affects the operation of a set of traffic light or is within 75m of a set of traffic lights, must be reported to Traffic Lights Unit (02) 6207 5223.

Name and Position

/ Signature
  1. BUS ROUTE IMPACT REQUIRES CONSULTATION? YES NO

Any work or TTM arrangement that affects a bus route must be reported at lease 48 hours for minor and,

7 days for major works in advance to Action Buses, Assistant General Manager for the appropriate area(s). Formal agreement may be required.

TUGGERANONG and WODEN: CITY, BELCONNEN and GUNGAHLIN: ph: 13 17 10 - please state suburb

Name and Position

/ Signature