Decision after a negative result of a first formal vote on a FprEN, FprCEN/TS or FprCEN/TR or of a first UAP on a FprEN (for work items neither mandated nor covered by a Specific Agreement)

DECISION number taken by CEN/TC number on CCYY-MM-DD

Subject: / CEN/TC number - Decision after a negative result of a first formal vote on FprEN or FprCEN/TS or FprCEN/TR number or a first UAP on FprEN number which is neither mandated nor covered by a Specific Agreement

CEN/TC number and title,

-  considering the negative result of the first formal vote or UAP on FprEN or FprCEN/TS or FprCEN/TR number and title

-  having checked the consistency of all the negative votes, according to resolution BT 85/1996;

-  considering the resolution BT 60/1996, requesting to determine as soon as possible a forward strategy upon the failed formal vote or UAP;

-  considering the resolution BT 27/1998 delegating the decision for the follow up after the negative result of a first formal vote or a UAP;

-  having considered the comments made during the first formal vote or UAP which 'do' or 'do not' lead to fundamental changes in the draft standard;

-  confirming that the work item is neither mandated nor covered by a Specific Agreement;

(Option 1 )

decides to submit a modified version of FprEN number (WI number) to a second formal vote - Target date for stage 45.99: CCYY-MM.

(Option 2 )

decides to submit a modified version of FprCEN/TS to FprCEN/TR or FprCEN/TR to FprCEN/TS number (WI number) to a second formal vote,

-  foreseen to take place by correspondence

Target date for stage 30.99: CCYY-MM.

-  foreseen to take place during a meeting

Target date for stage 30.99: CCYY-MM.

(Option 3 )

decides to submit a modified version of prEN number (WI number) to a UAP of 5 months - Target date for stage 30.99: CCYY-MM.

(Option 4 )

decides to submit a fundamentally modified version of prEN number (WI number) to a CEN enquiry followed by a formal vote with the following target dates:

Stage 30.99: CCYY-MM; Stage 45.99: CCYY-MM.

(Option 5 )

decides to change the deliverable from CEN/TS to CEN/TR for prCEN/TS number (WI number) with the following target date:

Stage 30.99: CCYY-MM.

(Option 6 )

decides to change the deliverable from CEN/TR to CEN/TS for prCEN/TR number (WI number) with the following target date:

Stage 30.99: CCYY-MM.

(Option 7 )

- decides to change the deliverable from EN to CEN/TS or CEN/TR for FprEN number (WI number) with the following target date:

Stage 30.99: CCYY-MM.

The standstill on this work item is released

(Option 8 )

- decides to delete the work item number and title.

- and decides to release the standstill on this work item in case of prEN.

The decision was taken by unanimity or simple majority with N positive votes, N negative vote(s) and N abstention(s).