Prevention of the Spread of Marine Non-native Species.
Template Hazard Analysis and
Critical Control Points Approach
Prepared for
[Identify Company(ies) included]
Prepared by
[Identify authors]
Date [Insert Date] Version [e.g. version 1.0]
1
1
Table of Contents
1
Table of Contents
Section 1.Operation Identification
Section 2. Potential Invasive Non-native Species Assessment
Section 3.Operation Procedures
Section 4.Hazard Analysis Form
Section 5a. Hazard Mitigation Form
Section 5b. Hazard Monitoring Form
Section 5b. Hazard Response Form
Section 1.Operation Identification
Describe the methodof transportation, distribution and storage of crop, gear, boats, etc:
Organisation name:Address:
Species:
Method(s):
Intended use:
Section 2. Potential Invasive Non-native Species Assessment
List all relevant species that you have identified to be associated with the Operation Procedure.
Examples:Crepidula fornicata and Rapana venosa / Invertebrates
Examples:
Alexandrium catanella / Phytoplankton
Examples:
Undaria pinnatifada, Sargassum muticum and Spartina anglica. / Plant/seaweed
Examples: Bacterial or virus pathogens / Pathogens
Section 3.Operation Procedures
List the steps involved in your activity. Only a simple, but complete, description of the procedure is needed. It is important to include all the steps undertaken. Use as many steps necessary to define your procedure.
Step 1Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10
1
Section 4.Hazard Analysis Form
Copy this table for each Step.
1. ActivityAquaculture procedure from Section 1 / 2. Risks
Potential invasive species risk associated with this procedure / 3 Significance
Risks deemed significant (yes/no) / 4. Resourcing
Justify your decision in the significance assessment / 5. Exclusion
What control measures can be implemented to minimise risk / 6. Action
Is this step where action is required (yes/no)?
Operation Procedure Step:__ / Vertebrate species
Invertebrate species
Phytoplankton species
Plant/seaweed species
Pathogens
1
Section 5a. Hazard Control Form
Control measures to reduce risk
Each row answered “yes” in column 6 on the Hazard Analysis Form
Action Point Unique Identifier / Significant Risks (Yes/No) / Control Measure/s / Limits of each control measuresAP_1
AP_2
AP_3
AP_4
AP_5 Add additional rows as required
Section 5b. Hazard Monitoring Form
Monitoring protocols to be employed
Action Point Unique Identifier/ What is been monitored / How will monitoring be progressed / Frequency / Person Responsible
AP_1
AP_2
AP_3
AP_4
AP_5
Section 5b. Hazard Response Form
Actions to be taken when control measures are not successful or are not met
Action Point Unique Identifier/ Indicator/s / Action / Records / Verification/Outcome
AP_1
AP_2
AP_3
AP_4
AP_5
1