11 18 13

BULLET RESISTANT TRANSACTION DRAWER

(6003)

PART 1 GENERAL

1.1 REFERENCE

The publication below forms a part of this specification

UNDERWRITERS LABORATORY UL 752 11th Edition

Standard for Bullet Resisting Equipment dated Sept. 5, 2005

1.2 DESIGN

The unit shall consist of a sliding drawer assembly consisting of a dip tray and full capacity bin. This assembly is actuated by a locking handle which prohibits the opening of the drawer from the outside. The dip tray or full capacity bin can be covered by a sliding lid if desired during periods of inactivity. An integral speaker grill shall be part of the front flange assembly to provide for an optional audio system if desired. Units must be manufactured in strict accordance with the specifications, design and details. No field alterations to the construction of the units fabricated under the acceptable standards shall be allowed unless approved by the manufacturer and the architect. All welds shall be in accordance with the requirements and standard practices of the American Welding Society. All exposed welds shall be ground flush and finished smooth.

1.3 SUBMITTALS

The following shall be submitted in accordance with Division 1 and the SPECIAL CONTRACT REQUIREMENTS: Catalog cuts, shop drawings, specifications, size, type and spacing of anchors, welding details, details of joints and connections. The provider of this drawer must be ISO 9001:2008 Certified by an accredited registrar and provide proof of such. Provide proof of possession of PRODUCT LIABILITY INSURANCE in an amount not less than five million U.S. dollars

1.4 WARRANTY

All material and workmanship shall be warranted against defects for a period of one (1) year from the date of receipt at the jobsite.

PART 2 PRODUCTS

2.1 MANUFACTURER

Transaction Drawer unit to be model 6003 as indicated on the contract drawings and manufactured by Armortex, Schertz, Texas. Phone: 210-661-8306, 800-880-8306, Fax: 210-661-8308.

2.2 FRAME

The side and rear of frame to be manufactured of 12 ga. hot rolled steel and the top surface shall be no less than 16 ga. stainless steel, with a # 3 finish. The front flange assembly shall be 12 ga. stainless steel with a #3 finish with the dip tray and bin assembly no less than 22 ga. stainless steel with a #3 finish.

BULLET RESISTANT TRANSACTION DRAWER (cont.)

2.3 WINDOW LEDGE

Provide a window ledge not less than 5" deep. The ledge to be full width of the complete drawer housing.

2.4 BULLET RESISTANT PROTECTION

Provide a bullet resistant barrier in the main frame housing offering UL Level ______(Protection levels available are through UL 8 & AP.)

PART 3 EXECUTION

3.1 INSTALLATION

Set drawer in accordance with the manufacturer’s printed recommendations. Installation of the interior frame may be accomplished by bolting or welding as desired.

3.2 PROTECTION

It shall be the responsibility of the contractor to see that the unit is properly stored in a dry location and covered to protect them from damage before and after installation.

3.3 CLEANING

Upon completion, clean exposed surfaces of assemblies thoroughly in accordance with manufacturer's instructions.

** End of Section **

3/11/10 11 18 13

S:BINDER SPECS/SSTDrawer Specs