Continuation Training Program 2017 to 2019
EMBRAER 170 /190 Airframe, Engines, Avionics
List of Airworthiness publications /
ISSUED BY: DAVID TAYLOR, TECHNICAL DIRECTOR
PLEASE READ EACH PDF FILE AND INITIAL EACH ITEM. PRINT/SCAN AND EMAIL YOUR COMPLETED SHEETS TO

AviationLearning.net

"Your Online Training Resource"

Number / Issued by / Issue date / Subject / Approval Holder / Type Designation / Effective date / Read and Tick Understood
and Date / Pdf
File
BR-2016-07-01 / / 2016-11-02 / Flight Controls - Gust Lock Lever - Replacement / EMBRAER
EMB-135
EMB-145 / 2016-07-18 / 244 kb
BR-2016-03-01 / / 2016-03-18 / Navigation - Pitot #1 and Pitot #2 Tube Assembly Lines - Installation / Replacement / Airplane Flight Manual (AFM) Revision / EMBRAER
EMB-135
EMB-145 / 2016-03-11 / 250 kb
BR-2015-03-01 / / 2015-03-25 / Fuel - Electric Fuel Pump Harness - Inspection / Installation / EMBRAER
EMB-135
EMB-145 / 2015-03-23 / 24 kb
BR-2014-06-01 / / 2014-06-16 / SUPERSEDED BY ANAC BRAZIL AD 2016-03-01 / EMBRAER
EMB-135
EMB-145 / 2014-06-17 / 467 kb
BR-2014-01-01 / / 2014-01-08 / Fuselage / Pylons - Revision of Maintenance or Inspection Program / EMBRAER
EMB-135
EMB-145 / 2014-01-20 / 26 kb
BR-2013-12-02 / / 2013-12-19 / [Correction] Periodic Inspections - Maintenance or Inspection Programme - Revision / EMBRAER
EMB-135 / 2013-12-27 / 31 kb
BR-2013-10-02 / / 2013-10-22 / Fuselage - Attaching Parts of the Lower Eyelet Fitting of the Cockpit Windshield Center-Post - Inspection / Modification / EMBRAER
EMB-135 / 2013-10-23 / 22 kb
BR-2013-10-01 / / 2013-10-04 / Fuselage - Cockpit Windshields Center Post Attaching Parts Lower Eyelet Fitting - Inspection / Replacement / EMBRAER
EMB-135
EMB-145 / 2013-10-03 / 24 kb
BR-2012-08-04 / / 2013-02-07 / NOT ADOPTED - EASA INFORMATION ATTACHED / EMBRAER
EMB-120
EMB-135
EMB-145
ERJ-170
ERJ-190 / 2012-10-29 / 55 kb
392 kb
BR-2012-03-02 / / 2012-03-08 / Engine Controls - Operational Limitation on the Aircraft Flight Manual (AFM) / EMBRAER
EMB-135
EMB-145 / 2012-03-20 / 37 kb
BR-2011-11-01 / / 2011-11-21 / Stabilizers - Tailboom Lightning Protection - Modification / EMBRAER
EMB-135
EMB-145 / 2011-11-30 / 24 kb
BR-2011-02-02 / / 2011-03-16 / NOT ADOPTED - SUPERSEDED BY ANAC AD 2012-08-04 / EMBRAER
EMB-120
EMB-135
EMB-145
ERJ-170
ERJ-190 / 2011-03-14 / 14 kb
233 kb
US-2010-19-01 / / 2010-09-23 / SUPERSEDED BY FAA AD 2013-26-06 / ROLLS-ROYCE CORPORATION (USA)
AE 3007 / 2010-10-27 / 500 kb
BR-2010-06-03R1 / / 2010-08-30 / Fuselage - APU Firewall - Inspection / Repair / Replacement / EMBRAER
EMB-135
EMB-145 / 2010-09-20 / 108 kb
US-2010-07-02 / / 2010-03-30 / HONEYWELL, INC. - Primus II RNZ-850( ) / RNZ-851( ) INUs - Aircraft Flight Manual (AFM) Revision / Inspection / APPLIANCES
ATA 34 NAVIGATION / 2010-05-03 / 56 kb
US-2009-24-04 / / 2009-12-01 / Turbofan Engines - Fan Spinner - Replacement / ROLLS-ROYCE CORPORATION (USA)
AE 3007 / 2009-12-28 / 27 kb
BR-2009-08-03 / / 2009-08-24 / Airworthiness Limitation Section (ALS) - Revision / EMBRAER
EMB-135
EMB-145 / 2009-08-20 / 31 kb
BR-2009-05-02 / / 2009-06-02 / Airworthiness Limitations Items (ALI) - Modification / EMBRAER
EMB-135
EMB-145 / 2009-06-01 / 31 kb

© AviationLearning.net FOR TRAINING PURPOSES ONLY