Archaeological Research FacilityUC Berkeley
SokkiaSET530r3 Total Station #2UCB # 2008-1000-416
Procedures / Checklist / checked out /checked in
1.Please reserve the Total Station in advance.
- If you must ship the unit, please use its original box, which should be returned with the instrument.
- If taking the SET510 out of the country, you must make sure that supplemental insurance has been purchased (UC Deductible Buy-Down).
- When checking out the unit, use the adjoining checklist to note whether all items are present and which ones are taken to the field.
- A copy of the checklist is included in the back of the instruction manual to facilitate keeping track of everything in the field.
- The instrument and its accessories must be clean before being returned.
- The checklist will be used to verify the return of all items.
- Please note if anything is lost or in need of repair or servicing.
Large Orange Case
Sokkia SET530r3 instrument + case / / User’s manual / /
plumb bob / /
lens cloth (blue) / /
batteries (2) / /
battery charger / /
Sokkia serial - USB cable / /
compact flash card (in sideplate) / /
lens cap / /
tool pouch (w/ 4 tools) / /
tubular compass / /
lens hood/sunshade / /
shoulder straps / /
shipping box for instrument / /
yellow “Laser Radiation” sign / /
SokkiaLink install CD and Cable Driver CD / /
Other
orange soft case with prism
/ / long prism rod
/ / spike for base of rod
/ / cardboard box for long prism rod
/ / tripod
/ / cardboard box for tripod
/ / golf club case for tripod and long prism rod
/ / short prism rod
/ / cardboard box for short prism rod
/ / I acknowledge that I have read the above procedures and agree to abide by them, and I take full responsibility for the care and treatment of the Sokkia Total Station until it is returned:
Signature:______Date:______
09/24/18