CR/NOV/2015

CLAWSON, HOSE & HARBY PARISH COUNCIL

REPORT BY THE CLERK TO THE PARISH COUNCIL FOR THE MEETING TO BE HELD ON MONDAY 16TH NOVEMBER 2015 AT LONG CLAWSON METHODIST CHURCH

The Ordinary Meeting will commence at 7pm but will be postponed for 15 minutes should any member of the public, Borough Councillor or Police representative, wish to discuss any matter with, or give a report to, the Parish Council.

Correspondence relating to the items below will be available to Cllrs at the meeting.

1. APOLOGIES FOR ABSENCE

2. NOTIFICATION OF DECLARATION OF INTERESTS

3. MINUTES OF THE ORDINARY MEETING dated 19th October 2015 (copy attached)

4. PLANNING MATTERS

4a Planning Decisions - Permission granted

i Mr B Pick 15/00648/FULHH (10 West End, Long Clawson)

Rear single storey extension

ii Marstons PLC 15/00195/FUL (Nag’s Head Inn, 20 Main St, Harby)

Alterations to existing ventilation system to catering kitchen

iii Marstons PLC 15/00221/LBC (Nag’s Head Inn, 20 Main St, Harby)

Alterations to existing ventilation system to catering kitchen

iv Mr A King 15/00708/FULHH (Dovecote House, 43 East End, long Clawson)

Conversion of single storey outbuilding for use as home office & various external works

v Mr H Thomas 15/00370/TCA (The Cedars, 5 Harby Lane, Hose)

To lop a Common Lime tree back

vi Ms L Parker 15/00689/FUL (land adjacent 27 Dairy Lane, Hose)

Construction of one detached dwelling

vii Mrs S-A Tucker 15/00723/FUL (Ashleigh, Broughton Lane, Long Clawson)

Demolition of existing 4 bedroom dwelling and replace with new 4 bedroom dwelling

viii Long Clawson Primary School 15/00785/TCA (LC Church of England Primary School)

Top pruning to 4 x trees to liberate telephone cables

Permission refused:

4b Appeals lodged / Inspector’s decisions

4c Planning Applications

i Mr & Mrs Wiles 15/00797/FUL (Brinvale Farm, Broughton Lane, Long Clawson)

Proposed extension of agricultural building for the purposes of farming and bird food manufacturing

ii Mr & Mrs Martino 15/00850/FULHH (Courtyard House, 4 The Sands, Long Clawson)

One and a half storey rear extension, 2 storey rear extension, raised ridge height

iii Mrs P Thurley 15/00828/FULHH (Church Cottage, 1 Church Walk, Hose)

Extension to form wc & shower room

iv Mr J Jesson 15/00338/LBC (Valley Christian Centre, Main Street, Harby)

Internal secondary glazing all windows. Fit loft access ceiling of main hall & install loft insulation

v Mr T Pruce 15/00866/FULHH (The Shires, 26 Church Lane, Long Clawson)

Proposed internal and external alterations to existing bungalow with associated detached garage

4d Planning Correspondence

i MBC 4.11.15: 15/00777/GDOCOU (Hill Farm, Waltham Lane, Harby)

Convert 3 buildings into 3 separate dwellings - Application withdrawn 28.10.15

5. MATTERS TO REPORT

5a The following items required no further action and are discharged:

15/100 Cllrs present

15/101 Apologies for absence

15/105c 14/19 Harby Village Hall plans

5.97/103a-d Acceptance of Section 3a-d of the Clerk’s Report

97/91a Planning Development – Woolmer (97/82a)

97/92d Damaged Street Lights - Main Street, Harby (97/56k)

97/94b v Gas Governor – Harby Lane, Hose.

97/103g Accounts for payment – street light charges (97/91a).

.97/103a-d Acceptance of Section 3a-d of the Clerk’s Report

97/91a Planning Development – Woolmer (97/82a)

97/92d Damaged Street Lights - Main Street, Harby (97/56k)

97/94b v Gas Governor – Harby Lane, Hose.

97/103g Accounts for payment – street light charges (97/91a).

4b Necessary actions have been taken on the following items (Cllrs confirm where necessary)

15/47fvii Vacant Hose allotments to Harby & LC & asking Harby tenants if they wished to give up 3rd

15/79 Allotment & Summer Keep rent letters

15/103 Minutes of previous meeting on 21.9.15

15/104 Planning matters

15/105 Matters to report

15/105dBHalf pipe removed from the Leys

15/106 Accounts for payment

15/107 Correspondence

15/113 Grounds maintenance/Verge grass cutting 2016 & /hedge cutting Winter 2015/16 contracts

5c Responses awaited to actions on the following items:

14/93d iv MBC Hard copy of Landscape capacity and sensitivity study

15/85f vi Handyman cutting ivy stem on street light in garden Preston’s Yard to ascertain its condition

15/85fvii Quotes for tree work VG 64

15/88 LCC Tree Survey of LC Churchyard, Cemetery & Hose closed Churchyard

15/96 Midlands Rural Housing Project Delivery Manager: final Housing Needs Survey

15/107bi Village War Memorial for the City area, The Sands by Clawson Christians Together after discussion with LC Cllrs re dimensions and site

15/107bvi LCC re Licence for bench on roadside verge

15/115 LCC re highways right of way at junction of Burden Lane/School Lane, Harby

15/116 MBC re trees blocking light at bungalows on King’s Road, LC

5d Items awaiting further action which may not yet be discharged:

A Tasks Outstanding – Clerk

09/31f Obtain CiLCA qualification as part of Quality Status requirements

12/124d Trial of online mapping site for Risk Assessment recording unique ref numbers/inspection dates

13/13f i Online mapping of PC property for use by Risk Assessment Working Group

14/32f ii Memorials checked – letters to be sent to owners & update cemetery plan

15/94 Complete nomination forms for Community Right to Bid – Asset register

B Items requiring action from Cllrs/third parties

15/92 Cllr Tillayrd: quote for a new wooden Leys PC sign

C Deferred Items/Reminders for Future Tasks

14/108c Planting of ‘Warden’ pear tree in Harby QEII Community Orchard autumn 2015

15/30d C Parking problems in Long Clawson. Cllrs Dunn & Seddon would put various ideas for discussion

in a paper for a future PC meeting

15/37 Future work in Harby Nature Reserve: Discussion with volunteer Warden when it was cleared

15/68biv Planting replacement fruit trees autumn 2015 in the QEII Community Orchard

5e The following matters to be noted: -

i 15/107cvii PC tree for Harby Christmas Tree Festival organised by Mrs Tillyard

ii 15/93 LCC training for Community Speed watch Harby in Harby VH 21.4.16

5f Reports from Councillors/Clerk : -

i Risk Assessment Working Group: 13/13f i Date to be agreed when online mapping completed

ii Cemetery and Churchyard Working Group:

iii Playground Safety Working Group

iv Finance Working Group:

v Street Lights Working Group:

vi Report from Clerk:

· Incident Register:

· Playgrounds: Hose Cllrs – damage to wooden multiplay wall, Hose VG

· Allotments & Summer keep: amendment to Stathern Lane allotments

· LC Cemetery: application for Memorial in respect of Mr L C Clinch from AE Herbert Ltd

· 15/114 anonymous donation of bench for Village Green 64 East End, LC

vii 15/104d iv Notes on public meeting re Planning & Neighbourhood Plans on 21.10.15 (copy attached)

viii 15/105fvii Cllrs Dames, Dunn & Tillyard second meeting with Practice Manager, LC Surgery

ix 15/107bv Cllr Wheatley on Harby PCC bin for Churchyard

6 ACCOUNTS FOR PAYMENT

Invoices and bank statements will be available for inspection at the meeting. Items i & ii were agreed under Minute 15/108 and cheques signed by 3 Cllrs on the 21st October

i Sovereign Design Play Systems Ltd (1870) £960.00 Installation play equipment

ii Sovereign Design Play Systems Ltd (1871) £6240.00 New play equipment Leys

iii HMRC (Bacs) £180.73 Employees tax & NI

iv Mr B Mills (Bacs) £282.18 Handyman wages/expenses

v Mrs E Crowther (Bacs) £799.38 Clerk wages/expenses

vi Valley Christian Fellowship (1872) £36.00 Room hire PC mtg 19.10.10

vii AC Grounds Maintenance (1873) £259.20 LCC Verge grass cutting

viii E.ON Energy Solutions Ltd (1874) £2112.00 PL all night Hose 14/180

ix Mr R D Fletcher (1875) £82.00 Grant Hose Church 15/111

x E.ON UK plc (1876) £437.92 Electricity supply Oct

xi Summerlands (1877) £1340.00 Grounds maintenance

xii Wicksteed Leisure Ltd (1878) £464.82 3 x new swing seats 15/109

xiii Playground Supplies Ltd (1879) £570.00 Repairs Pingle Dyke 15/110

xiv TSB Bank plc (DD) £15.73 Bank charges

7. CORRESPONDENCE

7a Correspondence Tabled for Information (detailed below & available to Cllrs)

i Retired officers of Leics Fire & Rescue Service 22.10.15: Concerns regarding “Towards 2020, Leics Fire & Rescue Service IRMP Consultation”

ii Chief Executive MBC 27.10.15: Parish Liaison Mtg 24.11.15 cancelled (copy Cllrs 27.10.15)

iii Clerks & Councils Direct November 2015

iv Harby Journal November 2015

v RCC Bulletin 2nd November (emailed to Cllrs)

vi MBC2.11.15: Invitation to Carols by Candlelight Christmas service 10.12.15. RSVP by 30.11.15

(copy Cllrs 2.11.15)

vii The Hose Piper Nov-Dec 2015

viii Leicestershire Deputy Chief Constable 3.11.15: Update on Strategic Alliance

ix The Clawson Clarion Nov 2015

x SLCC November 2015 The Clerk Magazine

7b Correspondence for Discussion (detailed below & available to Cllrs)

i MBC 28.10.15: Draft consultation ‘Draft scheme for the Establishment of a Leicester and Leicestershire Combined Authority’

ii LRALC 2.11.15: 2015 Newsletter No 7 (copy Cllrs 2.11.15)

iii LRALC Melton Branch 10.11.15 Agenda for meeting 8.12.15 & Minutes of meeting 8.9.15 (copy Cllrs 10.11.15)

iv 15/85dB OCA UK Ltd 4.11.15: Tree related subsidence at 33 East End, LC

7c Urgent correspondence received after the clerk’s report and requiring discussion

8 15/104di CLAWSON HOSE & HARBY NEIGHBOURHOOD PLAN

9 15/107c iii RESOLUTION TO GRANT £1000 TO HARBY PCC TOWARDS THE CHURCHYARD UPKEEP EXPENSES

10 15/108 QUOTES FOR NEW BIN, PICNIC BENCH AND GATE FOR THE LEYS PLAYING FIELD

Bin £147.53

Picnic bench £276.20

Gate

11 15/112 RESOLUTION TO APPROVE A BUDGET OF £67120 & A PRECEPT OF £50971

Copy attached to agenda of:

· Budget;

· Precept;

· List of subscriptions;

· Grants awarded since 2007/08

12 PROPOSED DIVERSION OF FOOTPATH G29A (PART), THE GREEN, HOSE

(copy Hose Cllrs 29.10.15)

13 FOOTBALL GOAL POSTS FOR THE LEYS

14 NO 24 & 24A BUS SERVICE

Email dated 29.10.15 from the PC Public Transport Consultant (copy Cllrs 29.10.15)

15 15/105c & 15/37 QUOTE OF £360 FOR CLEARING HARBY NATURE RESERVE & VOLUNTEER

I