SPECIFICATION 829
PRECAST CONCRETE PARAPET PANELS
Copyright MAIN ROADS Western Australia
Specification 829Precast Concrete Parapet Panels – 04/10140 Issued 03/05/2017REVISION REGISTER
Clause
Number / Description of Revision / Authorised By / Issue Date
Whole document / Reformatted / SCO / 03/05/2017
References / Reference to Australian Standard AS 2159 deleted / SDSE / 13/06/2011
Whole document / Complete review – no change / A/SDSE / 11/06/2010
Whole document / Complete revision of Issue 1.2 to new format / MCP / 01/08/2006
CONTENTS
ClausePage No
GENERAL
829.01Scope
829.02References
829.03 – 829.05NOT USED
MANUFACTURE
829.06Materials
829.07Tolerances
829.08Test Panel
829.09Handling and Stacking
829.10Acceptance
829.11 – 829.20NOT USED
INSTALLATION
829.21Installation of Parapet Panels
829.22 – 829.80NOT USED
AS BUILT AND HANDOVER REQUIREMENTS
829.81 – 829.90NOT USED
CONTRACT SPECIFIC REQUIREMENTS
829.91 – 829.99NOT USED
SPECIFICATION 829
PRECAST CONCRETE PARAPET PANELS
GENERAL829.01SCOPE
- The work under this specification is the manufacture, supply and fixing of precast concrete panels. The various types of panel which are required for the Works are shown on the Drawings.
829.02REFERENCES
- Australian Standards, MAIN ROADS Western Australia Standards and MAIN ROADS Western Australia Test Methods are referred to in abbreviated form (e.g. AS 1234, MRS 67-08-43 or WA 123). For convenience, the full titles are given below:
Main Roads Specifications
Specification 820CONCRETE FOR STRUCTURES
Specification 821FORMWORK
Specification 822STEEL REINFORCEMENT
Specification 824PRESTRESSING OF CONCRETE
829.03 – 829.05NOT USED
MANUFACTURE
829.06MATERIALS
- Concrete shall comply with the requirements of Specification 820 CONCRETE FOR STRUCTURES. It is important that the concrete mix developed shall consistently produce a high quality finish and be of a uniform colour.
- Where steam curing is proposed it shall be low pressure wet steaming. Any other form of accelerated curing shall not be permitted.
- Reinforcement and formwork shall comply with relevant clauses of Specifications 822 STEEL REINFORCEMENT and 821 FORMWORK respectively.
829.07TOLERANCES
- The precast panels shall be manufactured to the dimensions shown on the Drawings within the following tolerances:
- Overall dimensions of length and width and height ±3mm.
- Cross-sectional dimensions ±3mm.
- Deviations from a straight line shall be no more than 3mm on a 2m template.
829.08TEST PANEL
- The Contractor shall produce a test panel to the dimensions and finish of any one of the panels shown on the Drawings.
- The test panel shall be kept in a convenient location at the casting yard.
- Prior to the commencement of production of panels for incorporation in the Works, the Contractor shall present the test panel for the Superintendent’s inspection.
829.09HANDLING AND STACKING
- The Contractor shall be responsible for all handling and stacking of the precast panels and shall ensure that no panel is removed from a mould until the concrete has gained sufficient strength to safely withstand handling stresses.
- During handling and stacking operations the panels shall be supported only at the points detailed on the Drawings and the Contractor shall take due care to protect the surface of the panels from deterioration.
- Any units damaged or distorted in excess of the specified tolerances prior to or during installation shall be replaced at no cost to the Principal.
829.10ACCEPTANCE
- Panels shall be rejected if they exhibit spalling or cracking, including hairline cracks, or staining or any substantial variation from the texture and colour of the test panel.
829.11 – 829.20NOT USED
INSTALLATION
829.21INSTALLATION OF PARAPET PANELS
- Panels shall be fixed to the line and levels as indicated on the Drawings with the following tolerances.
- Change of alignment3mm/3m max
- Overall out of alignment10mm max
- Out of alignment on adjacent panels3mm max
- The finished line of the panels shall present a smooth and regular appearance.
- All lifting recesses in the panels shall be filled with grey PVC plugs.
829.22 – 829.80NOT USED
AS BUILT AND HANDOVER REQUIREMENTS
829.81 – 829.90NOT USED
CONTRACT SPECIFIC REQUIREMENTS
829.91 – 829.99NOT USED
GUIDANCE NOTES
FOR REFERENCE ONLY – DELETE GUIDANCE NOTES FROM FINAL DOCUMENT
- All edits to downloaded Specifications shall be made using Track Changes, to clearly show added/deleted text.
- If all information relating to a clause is deleted, the clause number should be retained and the words “NOT USED” should be inserted.
- The proposed documents with tracked changes shall be submitted to the Project Manager for review, prior to printing the final batch of documents. When this final printing is carried out, the tracked changes option is to be turned off.
- Before printing accept all changes in the document, turn off Track Changes and refresh the Table of Contents.
- The Custodian of this specification is the Structures Design and Standards Engineer.
(NO GUIDANCE NOTES AT THIS TIME)
CONTRACT SPECIFIC REQUIREMENTS
The following clauses are to be placed under the CONTRACT SPECIFIC REQUIREMENTS, as required. After inserting the clause, change the clause number and heading to style “H2 SP” so it appears in the Table of Contents.
XXX.XXSUB HEADING (H2 SP)- Insert text (Main Table SP)
- Insert text (Main Table SP)
XXX.XXSUB HEADING (H2 SP)
- Insert text (Main Table SP)
- Insert text (Main Table SP)
AMENDMENT CHECKLIST
Specification No. / 829 / Title: / PRECAST CONCRETE PARAPET PANELS / Revision No:Project Manager: / Signature: / Date:
Checked by: / Signature: / Date:
Contract No: / Contract Description:
ITEM / DESCRIPTION / SIGN OFF
Note: All changes/amendments must be shown in Tracked Changes mode until approved.
Project Manager has reviewed Specification and identified Additions and Amendments.
CONTRACT SPECIFIC REQUIREMENTS addressed? Contract specific materials, products, clauses added? (Refer Specification Guidance Notes for guidance).
Any unlisted materials/products proposed and approved by the Project Manager? If “Yes” provide details at 16.
Standard clauses amended? MUST SEEK approval from Manager Commercial.
Clause deletes shows as “NOT USED”.
Appropriate INSPECTION AND TESTING parameters included in Spec 201 (Text Methods, Minimum Testing Frequencies verified).
ANNEXURES completed (refer Specification Guidance Notes).
HANDOVER and AS BUILT requirements addressed.
Main Roads QS has approved changes to SMM.
Project Manager certifies completed Specification reflects intent of the design.
Completed Specification – independent verification arranged by Project Manager.
Project Manager’s review completed.
SPECIFICATION GUIDANCE NOTES deleted.
TABLE OF CONTENTS updated.
FOOTER updated with Document No., Contract No. and Contract Name.
Supporting information prepared and submitted to Project Manager.
Further action necessary:
Signed: / (Project Manager) / Date:
Document No: DXX#XXXXPage 1 of 9
Contract No: XXX/XX [Contract Name]