Rev. 2/2014

Erosion & Sediment Pollution Control (E&SPC) Plan Review Application

Project Name: / Applicant’s Name:
Project Address: / Applicant’s Address:
Municipality: / Applicant’s Phone:
Total Project Acres: / Applicant’s Email:
Total Acres to be Disturbed: / Plan Preparer:
Number of Residential Lots/Units: / Preparer’s Phone:
Site Supervisor: / Preparer’s Fax:
Site Phone: / Preparer’s Email:

ProjectFees

(Per the current Luzerne Conservation District E&SPC Program Fee Schedule)

Administrative Fee / Only for E&SPC Plans not associated with NPDES Permits = $100
(Does not apply to Section C. Small Projects.) / $
Residential / Fee based on number of lots/units.
See current Fee Schedule for applicable amount. / $
Industrial/Commercial/
Institutional / Fee based on the disturbed area or linear feet for utility lines.
See current Fee Schedule for applicable amount. / $
Small Projects / All small project reviews = $100
See current Fee Schedule for types of projects. / $
Non-Profit, Open Space, Greenways & Outdoor Recreation / $500 (basic fee) + ______($20 per disturbed acre) / $
TOTAL PROJECT SERVICE FEE:
(Check made payable to the Luzerne Conservation District) / $
NPDES Base Permit Fee
(If applicable) / General NPDES Permits = $500
Individual NPDES Permits = $1,500
(Separate check made payable to the Luzerne County Clean Water Fund) / $
NPDES Acreage Permit Fee
(If applicable) / General & Individual NPDES Permits = $100 per disturbed acre
For fractional acreage, the acreage shall be rounded to the closest whole number.
(Separate check made payable to the Commonwealth of PA Clean Water Fund) / $

Page 1 of 2

The applicant hereby agrees as follows:

To acknowledge the stipulations and requirements contained in the Luzerne Conservation District’s E&SPC Program Service Fee Schedule and E&SPC Program Service Fee Schedule Policy.

To acknowledge that the E&SPC Plan will be reviewed for adequacy to control erosion and sedimentation, in accordance with 25 Pa. Code Chapter 102 and the Clean Streams Law, and not for adequacy of structural design.

To retain full responsibility for any damage which may result from any construction activity notwithstanding Conservation District approval of the subject E&SPC Plan.

It is understood that approval of the plan submitted with this application shall be valid only for the duration of the initial project granted by the municipality.

All municipal renewals of this project will require resubmission and approval by the Conservation District.

To notify the Conservation District in writing or by phone at least 72 hours prior to any earth disturbance activity.

To notify the Conservation District upon completing the project.

To maintain a copy of the approved E&SPC Plan on the project site.

To allow Conservation District representatives to enter the project site for inspection.

That any conveyance of the project prior to its completion will include the transfer to the subsequent owner(s) the full responsibility of compliance with the approved E&SPC Plan and applicable regulations.

Applicant’s Name (please print):

Applicant’s Signature: Date:

For District Use Only

Initial Date Received: ______Date of Final Approval: ______

Plan Reviewer’s Signature: ______

Page 2 of 2

Erosion & Sediment Pollution Control Program FeeSchedule

The following fees will be charged by the Luzerne Conservation District for services under the Erosion and Sediment Pollution Control (E&SPC) Program and National Pollutant Discharge Elimination System (NPDES) Permit Program. Applications cannot be accepted for review without the appropriate fee and a completed E&SPC Plan Review Application.

1. ADMINISTRATIVE FEES

For E&SPC plans not associated with NPDES Permit applications = $100 per plan

(Applies to projects that fall under sections A, B, and D below. Does not apply to projects that fall under section C. Small Projects. For NPDES Permit application, see the permit administrative fees listed under #3 below.)

2. PROJECT SERVICE FEES

RESIDENTIAL
Lot/Unit(s) / Fee / Lot/Unit(s) / Fee
1-2 / $325 / 51-75 / $3,900
3-4 / $650 / 76-100 / $4,500
5-10 / $1,300 / 101-125 / $5,000
11-20 / $1,700 / 126-150 / $5,700
21-30 / $2,400 / 151-175 / $6,300
31-40 / $3,000 / 176-200 / $6,800
41-50 / $3,500 / 200+ / $6,800 + $50 per lot above 200
INDUSTRIAL/COMMERCIAL/INSTITUTIONAL
(Use linear feet to determine fees for underground utility lines. All other projects, including structures related to utility projects, use disturbed acreage to determine fees.)
Disturbed Acres / Linear Feet / Fee
0 - 0.99 / 0 – 899 / $1,200
1 - 4.99 / 900 – 4,499 / $2,000
5 - 9.99 / 4,500 – 8,999 / $2,800
10 - 14.99 / 9,000 – 13,499 / $3,200
15 - 19.99 / 13,500 – 17,999 / $3,800
20 - 25.0 / 18,000 – 22,500 / $4,600
Over 25.0 / Over 22,500 / $4,600 + $100 for each additional acre above 25 or additional 900 feet above 22,500

B.

SMALL PROJECTS
(Stream crossings, 1 acre or less disposal areas for construction projects, logging activities, wetland mitigation projects and E&SPC Plan Guide for Small Projects submissions.)
All reviews $100

C.

NON-PROFIT, OPEN SPACE, GREENWAYS & OUTDOOR RECREATION
(Game fields, parks, playgrounds, rail/trails, fire stations, etc.)
$500 basic fee + $20 per disturbed acre

D.

3. NPDES PERMIT FEES - Two separate checks required:

  1. One check payable to “Luzerne County Clean Water Fund” in the amount of:
  • $500.00 for General NPDES Permits
  • $1,500.00 for Individual NPDES Permits
  1. One check payable to “Commonwealth of Pennsylvania Clean Water Fund” in the amount of:
  • $100.00 per disturbed acre (for fractional acreage, the acreage shall be rounded to the closest whole number)

4. REVISION FEES

A Revision Fee equal to 40% of the initial Project Service Fee will apply to the second and subsequent technical comment/deficiency/review letters.

5. PLAN MODIFICATION FEES (Changes made after the ESPC Plan has been approved)

  1. Minor Modifications to the E&SPC Plan/NPDES Permit – 10%of the initial fee
  1. Major Modification to the E&SPC Plan/NPDES Permit – Fee based on schedules above.

(Proposed earth disturbance activities that will take place outside the permitted area, or that will have an additional point source discharge to a receiving water, not previously identified in the application/NOI)

Please Note:

Failuretobeginearthdisturbanceactivitieswithintwo (2)yearsfromtheoriginalplanapprovaldatewill require resubmissionoftheE&SPCPlanandadditionalfeesbasedonthescheduleabove, unless otherwise determined by state law and/or regulation.

Pennsylvania Law requires persons proposing or conducting earth disturbance activities to develop, implement and maintain best management practices to minimize the potential for accelerated erosion and sedimentation. An E&SPC Plan must be available at the project site at all times. (25 Pa. Code Chapter 102. Erosion and Sediment Control)

Rev. 2/2014

EROSIONSEDIMENTPOLLUTIONCONTROLPROGRAM

SERVICEFEESCHEDULEPOLICY

  1. AUTHORITY:

TheLuzerneConservationDistrict,byauthorityof Act217of 1945,TheConservationDistrict Law,asamended,hasadoptedtheLuzerneConservationDistrictService Fee Scheduleforservicesunderthe ErosionSedimentPollutionControl(ESPC)ProgramandtheNationalPollutantDischargeElimination System(NPDES)Program.

  1. EFFECTIVEDATE:

ThisresolutionshallbecomeeffectiveFebruary 20, 2014,andshallremainin effectuntilmodified, amended,orrescindedbytheLuzerneConservationDistrictBoardof Directors.

  1. INTENT:

Thepurposeof thisfeescheduleis todefraythecosts incurredbytheLuzerneConservation Districtinitsdelegatedauthorityof thePennsylvaniaDepartmentof EnvironmentalProtection’s(PADEP) ErosionSedimentPollutionControlPrograminaccordancewithTitle25,Chapter102,Erosionand SedimentControlrules regulationsof thePennsylvaniaCodeandthe PennsylvaniaCleanStreams Law.

  1. WAIVEROFFEES:

Districtservicefeesmaybe waivedforapplicationsfiledbyagenciesof theCommonwealthof Pennsylvania. Thisexemptiondoesnotapplyto othergovernmententitiesorprivate,non-profit organizations.Inuniquesituations,theDistrictManagershallhavetheauthorityto waiveand/orreduce feesonacasebycasebasis.

  1. PROJECTAREADELINEATION:

Todeterminetheapplicableprojectarea,pleaserefertotheServiceFee Section(Sec.2)of theFeeSchedule.

  1. PROCEDURES:
  1. ApplicantswillsubmitacheckormoneyorderpayabletotheLuzerneConservationDistrict,1 copyof thecompleteDistrictESPCPlanReviewApplication,and2setsof the ESPCPlanand narrative(3setsforNPDESPermitapplications)*.An adequacyletterandstampedplanswillbe mailedtothe ApplicantuponDistrictapproval.
  1. TheLuzerneConservationDistrictfeeshallnotbecombinedwithanyothermunicipalorcounty fee.Thecancelledcheckwillbetheapplicantsreceipt.
  1. InaccordancewithPADEP’s Administrative Policy and Permitting Manual for the ESCP and the NPDES Program,NPDES permit application submissionsnotcontainingtheappropriate informationwillnotbereviewedfortechnicaladequacy.Theapplicantwillbeinformedof any additionalinformationorfeesneededforacompletereview.
  1. A$50.00chargewillbe assessedforanycheckrefusedbythebank dueto insufficientfunds,and theentireapplicationpackagewillbe returnedtotheapplicantwithno furtheractiontaken.
  1. Themaximumtechnicalreviewtimefor E&SPC plans is 22business daysfromthedatethe submission is deemed complete. The District has 15 business days to determine if the submission contains the information needed to be considered complete.
  1. ApplicationsforNPDESpermitsrequire,bystateregulation,a separatecheckmadepayableto “LuzerneCountyCleanWaterFund”forthefollowingadministrativefilingbasefees:General Permits$500.00andIndividualPermits$1,500.00.In additiontotheadministrativebasefee,a separatecheckmadepayableto“Commonwealthof PACleanWaterFund”is requiredin the amountof $100.00perdisturbedacre(fractionalacreageshallberoundedtotheclosestwhole number).UnlessotherwisedeterminedbyPADEP,thesefeesarerequiredforallNPDESpermit applications,includingthosesubmittedbygovernmentagencies.
  1. APPLICABILITY:
  1. Thefeeschedulewillapplywheneveran ESPCPlanReviewApplicationand ESPCPlanare submittedforanadequacydetermination.
  1. Inapplicationsconsistingof combinedresidentialandcommercialusage,thefeewillbe calculatedbydetermininga separatefeeforeachportionaccordingtotheschedule,andthen addingthoseseparatefeestogether.
  1. Plansrequiringmorethanone(1)technicalcomment/deficiency/reviewletterwillbeassesseda feeof 40%of the initialfee.
  1. Ifearthdisturbanceactivitiesarenotcommencedwithintwoyearsof the ESPCPlanapproval date,theplanmustberesubmittedandwillbesubjecttoafullreviewfeeasprovidedbythefee schedule, unless otherwise determined by state law and/or regulation. A new review and review fee will be required when an NPDES Permit or E&SPC plan approval has expired.
  1. ESPCPROGRAMSERVICEFEESCHEDULE: Attachedtothispolicy.
  1. ESPCPLANWITHDRAWAL:

Uponwrittenrequestbytheapplicant,andapprovalbytheDistrictManager,aportionof the District’s service feemayberefundediftheapplicantwithdrawstheplanpriortoreview.Writtenrequestsforplan withdrawalandfeerefundmustbesubmitted within90days of theDistrict’sadministrativeortechnicalreviewof theapplication.IftheDistrictdoesnot receivearesubmissionof theapplicationorarequestto withdrawtheapplicationwithinthattimeframe, theapplicationwillbeconsideredwithdrawnandallfeeswillbe retainedbythedistrict. Reviewfeeswillnotberefundedonceatechnicaladequacydeterminationhasbeenmade bytheLuzerneConservationDistrict.

  1. NOTIFICATIONOFCHANGES:

TheLuzerneConservationDistrictBoardof DirectorsreservestherighttorevisetheFee Scheduleasdeemednecessaryorappropriate.LuzerneCountymunicipalitieswillbenotifiedin writing of anychanges.

  1. APPROVAL OF POLICY:

Be itresolved,asof the20thdayof February,2014,thatallpreviousLuzerneConservationDistrictFee Schedulesareherebydefunctasagreeduponbythe Boardof Directors.Be italsoresolvedthatthe Boardof Directorsadoptsthe ServiceFee ScheduleandtheLuzerneConservationDistrictwillassessfeesfor servicesunderthe Erosionand SedimentPollutionControlProgramasauthorizedbytheCommonwealth of PennsylvaniaunderAct217of 1945,TheConservationDistrictLaw,asamended,inaccordancewith theattachedscheduleof charges.

LUZERNECONSERVATIONDISTRICTBOARDOFDIRECTORS

*Inordertoconservepaper,theDistrictallowsplanpreparerstosubmitonlyonecopyoftheErosionand Sediment ControlPlan,Erosionand SedimentControlNarrative,PostConstructionStormwaterManagementPlanand Post ConstructionStormwaterManagementNarrativeuntiltheplansarereadyforfinalapproval.Theadditionalcopies will berequiredoncethe plansarereadyforfinalapprovalorifthereisa requestto reviewpublicrecordsassociatedwiththeapplication.This optionis at thediscretionof theplanpreparerortheapplicant.Bychoosingthis option,youwillbeagreeingtoprovideadditionalcopieswithin5 workingdaysifsorequestedbytheDistrict.ThenumberofNPDESPermitApplicationsremainsthe same.