BUILDING, ENGINEERING & NEIGHBORHOOD SERVICES

DEVELOPMENT CHECK LIST

1) Stamp in submittals and applications

2) Index number and type of developments on Assessor’s Map Book Page.

3) Make copies of APN storm drain and sewer base maps. Outline Project Area

and label

4) Log data received on summary log.

5) Start log sheet.

6) Check if in City limits.

7) If any of the following restricted or special areas:

Hillside Development Area Yes No

Flood Hazard Zone Yes No

Alquist-Priolo Fault Zone Yes No

8) Check street layout against the General Plan

9) Check with Design Section and the Bond Program Section for any proposed City projects in this area.

10) Check administrative Section for any proposed Assessment Districts in the area.

11) Compare with Master Storm Drainage Area Maps & Zones

LDA $ /Acre Master Storm Drain Req.

12) Compare with sanitary sewer master plan and existing sewer line base maps.

Pipe Size: Location

13) Check with existing storm drainage Maintenance District 1.

Pipe Size: Location

14) Take field trip and make on-site investigation.

15) Take picture(s) as required.

16) Check that the following shown correctly on tentative map:

Street

Existing road width

Proposed road width

Existing R/W width

Proposed R/W width

Needed width of dedications

17) Check limited access rights off base maps.

18) Obtain traffic engineering comments.

19) Check for bonds and agreements.

Need: RMA 2-Year

DIA Shared Access

Shared Parking Other

ENGINEER:

1) If Hillside Subdivision, review soils report in detail.

2) Review fees and special requirements.

3) Review Access.

4) Review Drainage

5) Review sewering.

L:\ENGINEER\Forms & Guidelines\development checklist.doc.doc