PROJECTS PORTFOLIO /

Project Title:EPC For Upgrade of Wellhead Control and Safety Systems for Thamama ‘C’ OGD-0 & OGD-1 Gas Producers

Client Name & Address:Abu Dhabi Company of Onshore Oil Operations –ADCO, Abu Dhabi

Contact Name & Designation:Mr. Ali Cherad, Project Manager

Telephone & Fax No.:+971-2-6043590, +971-2-669767

Location:Abu Dhabi, UAE

Owner:ADCO – Abu Dhabi

Description of Works :Upgrade of 30 Nos. of wellhead control system and safety system. Main scope of work includes:

  • Demolition of some of the existing facilities
  • Relocation of some of the existing facilities
  • Engineering, Procurement and Construction of following:
  • HIPPS system
  • Wellhead control system
  • Instrument Packages including Fire and Gas instruments
  • Piping
  • Civil
  • Testing and Pre-commissioning
  • Commissioning Assistance

Man-hours:1.5 million

Peak Labour Force:350

Contract Award Date:August 28, 2006

Project Commencement Date:August 28, 2006

Completion Date:April 2008

Contract Value:USD 34.25 Million

Project Title:Zamzama Gas Field Development Phase-2

Client Name & Address:BHP Billiton Petroleum Pty Ltd.

180 Lonsdale Street, Melbourne VIC 3000 Australia

Contact Name & Designation:Mr. Ather Siddiqui – Project Director

Telephone & Fax No.:+613 9652 6313 Fax: +613 9652 6134

Owner / Operators:BHP Petroleum

Location:Dadu (Sindh)

Description of Works:Electro-mechanical works, tanks structure fabrication & erection, machinery equipment erection.

Major Quantities:Steel Structure Fabrication/Erection: 450Tons

Equipment Installation: 1,200Tons

Piping:53,000ID

Painting:12,000Sq.M

Insulation: 2,300Sq.M

Cross Country Pipeline (6” dia): 30km

Installation of Electrical Equipment:

Cable Installation:

Cable Termination:

Testing & Commissioning:

Man-hours:1.0 million

Contract Award Date:August 28, 2006

Project Commencement Date:August 29, 2006

Completion Date:October 2007

Contract Value:US$ 9.65 Million

Project Title:Thamama C, F, Units 6 & 7 Gas Wells Tie-In

Client Name & Address:National Petroleum Construction Company (NPCC), P.O. Box 2058, Abu Dhabi, UAE

Contact Name & Designation:Mr. Divakaran Nair, Project Manager

Telephone & Fax No.:+971-2-554 9000 Fax: +971-2-554 9111

Owner:ADCO

Location:UAE

Description of Works :Construction of flow lines from Bb 562 & Bb 563 to TH, C, Area 10, including associated civil works.

Contract Award Date:April 28, 2004

Project Commencement Date:April 2004

Completion Date:May 2005

Contract Value:US$ 2.02 million

Project Title:80 mmscfd Rehmat Gas Field Development

Client Name & Address:Petronas Carigali (Pte) Ltd.

Contact Name & Designation:Mr. Abdul Malik Jaffer, Project Manager

Telephone & Fax No.:

Location:Sindh, Pakistan

Consultant / Designer:Presson-Descon

Owner / End User:Petronas Carigali (Pte) Ltd.

Description of Works :Engineering, Procurement, Fabrication, Construction and Commissioning of Gas Processing Facilities including raw gas flow lines, Inlet Separation, Amine Sweetening, Silica Gel based Water and Hydrocarbon Dew Point Control, Acid Gas Incineration, Hot Oil Heater and all Plant Utilities.

Contract Award Date:April 2004

Project Commencement Date:April 2004

Completion Date:April 2005

Contract Value:US$ 38 million

Project Title:50 mmscfd Gurguri Gas Plant

Client Name & Address:MOL Pakistan Oil & Gas Co. B.V.

Contact Name & Designation:Jawed Sarwar, Country Manager

Telephone & Fax No.:+92-51-2827177 Fax: +92-51-2820113

Location:NWFP, Pakistan

Consultant / Designer:Presson-Descon

Owner / End User:MOL Pakistan

Description of Works :Engineering, Procurement, Fabrication, Construction and Commissioning of Gas Processing Facilities including raw gas flow lines, Inlet Separation, Turbo Expander, Glycol based Dehydration and Complete Plant Utilities.

Contract Award Date:April 2004

Project Commencement Date:April 2004

Completion Date:January 2005

Contract Value:US$ 12 million

Project Title:Ethane Recovery Maximization

Client Name & Address:Fluor Corporation – P. O. Box 46858, Abu Dhabi

Contact Name & Designation:Mr. Mike Sahakian – Project Manager

Telephone & Fax No.:+971-2-631 6900 Fax: +971-2-631 1660

Owner:GASCO

Location:Habshan, UAE

Description of Works :Complete civil, mechanical, electrical and instrumentation works. This includes, erection of stationary / rotary equipments, piping fabrication / erection, steel structure fabrication construction. Civil foundation, painting, insulation, fire proofing, electrical / instrumentation works and Tie-Ins.

Major Quantities:Excavation: 2,500Cu.M

Concrete: 700Cu.M

Paving: 700Cu.M

Equipment: 675Tons

Piping: 18,500dia Inch

Supports: 21Tons

Insulation: 4,000Sq.M

Painting: 15,000Sq.M

Cables: 26,500M

Cable Trays: 2,750M

Supports: 10,500Kgs.

Man-hours (Direct):0.30 million

Peak Labour Force:200

Contract Award Date:July 2003

Project Commencement Date:July 2003

Completion Date:November 2004

Contract Value:US$ 7.4 million

Project Title:Zamzama Gas Field Development – Phase-1

Client Name & Address:BHP Billiton Petroleum Pty Ltd.

600 Bourke St., Melbourne VIC 3000, Australia

Contact Name & Designation:Mr. Ather Siddqui - Project Manager

Telephone & Fax No.:+92-51-264795, 264796 Fax: +92-51-252985

Location:Zamzama / Dadu

Owners / Operators:BHP Petroleum

Consultant / Designer:Kvaerner – Australia and NESPAK – Pakistan

Description of Works :Plant site earth works, roads, drainage & fencing. Construction of aerodrome 1600m length.

Construction of accommodation, substation, plant room, air-conditioning workshop & visitor center buildings.

Supply & installation of reinforced concrete pipe drain. Supply, fabrication & installation of small bore carbon steel pipe drains & construction of precast sleepers.

Major Quantities:Earthworks:210,000Cu.M

Asphaltic Concrete:100,000Sq.m

R.C.C: 3,000Cu.M

Rebar: 341Tons

Form Work: 7,500Sq.m

Man-hours:0.5 million

Peak Labour Force:280

Contract Award Date:April 2002

Project Commencement Date:April 2002

Completion Date:October 15, 2003

Contract Value:US$ 4.23 million

Project Title:Sawan Gas Field Development Project, Phase I & II

Client Name & Address:Clough Engineering Limited – Australia

Contact Name & Designation:Mr. Russell Waugh – Project Manager

Telephone & Fax No.:+61-8-9281 9000 Fax: +61-8-9485 2326

Location:Khairpur, Sind

Owner:OMV Pakistan (Pvt.) Limited

Description of Works :Electrical and Instrumentation Installation.

Major Quantities :Electrical Panel (all kinds): 180Nos.

Transformers: 07Nos.

Cable Trays: 16,775M

Lighting Fixture: 342Nos.

Earthing and Cathodic Protection: 3,642Nos.

Cable Laying:156,512M

Cable Termination: 1,896Nos.

Cable Laying and Termination:166,900M

Instrument Panels and Cabinets: 243Nos.

Field Instrumentation (Installation): 315Nos.

Field Instrumentation: 164Nos.

(Calibration & Test)

Man-hours:0.215 million

Peak Labour Force:270

Contract Award Date:October 20, 2002

Project Commencement Date:December 2002

Completion Date:September 30, 2003

Contract Value:US$ 0.84 million

Project Title:Sawan Gas Field Development Project, Phase I & II

Client Name & Address:Clough Engineering Limited – Australia

Contact Name & Designation:Mr. Russell Waugh – Project Manager

Telephone & Fax No.:+61-8-9281 9000 Fax: +61-8-9485 2326

Location:Khairpur, Sind, Pakistan

Owner:OMV Pakistan (Pvt.) Limited

Description of Works :Equipment, piping and steel structure works for 2x175 mmscfd green-field gas processing plant comprising of 2 trains phase 1 & phase II. Installation of CO2 / H2S Absorber and stripper columns, vessels drums, exchanger’s, filters, incinerators, scrubbers, receivers, package units, vent stack internals installation, furnaces, tanks, pumps, fans and allied piping and structure.

Major Quantities :Piping Erection:56,916dia inch

Structure Erection: 486Tons

Equipment Erection: 3,532Tons

Touch up Painting:9,250Sq.m

Man-hours:0.5 million

Peak Labour Force:500

Contract Award Date:September 10, 2002

Project Commencement Date:September 2002

Completion Date:October 20, 2003

Contract Value:US$ 2.84 million

Project Title:Sui Gas Compression Project Phase 3

Client Name & Address:Foster Wheeler Energy Limited, Procurement Group, ShinfieldPark, Reading, Berkshire, RG2 9 FW, UK

Contact Name & Designation:Mr. D. Stoker – Project Manager

Telephone & Fax No.:+44 (0) 118 913 1234 Fax: +44 (0) 118 913 2333

Location:Sui, Balochistan

Owner:Pakistan Petroleum Limited

Description of Works :Mechanical, Electrical & Instrumentation (including Minor Civil) Works.

Mechanical

-Installation of six interstage knock out drums, six heat exchangers, support for the installation of six HP compressor casings, painting and erection of steel cooler and piping insulation.

E&I

-Electrical supplies and control stations for two new 15 KW airfin exchangers motor per train, electrical supplies to two electric trace heating circuit for 14” line. Addition of lighting and small power in airfin, knock out drum, compressor H P casing and new oil overhead tank structure area for trains A-F,. installation of substation cable between MCC’s and 24 V and 110 V marshalling cabinets. Testing and commissioning of all equipment.

Civil

-Construction of minor foundations, repair of existing foundations for pipe supports and platforms, installation holding down bolts for minor platforms, ladders and pipe supports.

Man-hours:0.16 million

Peak Labour Force:275

Contract Award Date:September 2002

Project Commencement Date:October 2002

Completion Date:September 30, 2003

Contract Value:US$ 1.27 million

Project Title:Mazarani Gas Field Development

Client Name & Address:Pakistan Petroleum Limited

6th Floor, PIDC House, Dr. Ziauddin Ahmed RoadKarachi

Contact Name & Designation:Mr. Maqsood Toor - Project Manager

Telephone & Fax No.:+92-21-5681366 Fax: +92-21-5682125

Operator:Pakistan Petroleum Limited

Location:100 KM West of Larkana, Sindh

Description of Works :Engineering, Procurement, Construction and Commissioning (EPCC).

Basic design, detail engineering, procurement, manufacturing, construction, installation and commissioning of 12 mmscfd gas processing plant comprising of slug catcher, gas compression system, amine sweetening plant, gas dehydration plant, gas metering system, flare system, power generation and other offsite facilities.

Major Quantities:Excavation: 5,130Cu.M

Concrete: 700Cu.M

Equipment: 285Tons

Fab. & Erec .of Tanks: 105Tons

Fab. & Erec. of Piping:10,000dia. Inch

Structure: 75Tons

Insulation: 820Sq.M

Painting: 5,010Sq.M

Panels: 17Nos.

Trays / Conduits: 1,030M

Cable Laying:48,210M

Field Instruments: 416Nos.

Tubing / Piping: 225M

Supports: 10Tons

Man-hours (Direct):0.25 million

Peak Labour Force:255

Contract Award Date:May 2002

Completion Date:February 2003

Contract Value:US$ 5.5 million

Project Title:Bhit Gas Field Development

Client Name & Address:LASMO Oil Pakistan Limited

Contact Name & Designation:Mr. M. White - Contracts Manager

Telephone & Fax No.:+92-21-5879951 Fax: +92-21-5838490

Location:Bhit, Sehwan (Sind), Pakistan

Operators:LASMO Oil Pakistan Limited

Consultant / Designer:Snamprogetti / Aquater

Description of Works :Site Preparation, Main Civil Works and Electrification.

Major Quantities

:Grading & Compaction: 550,000Sq.M

Earthwork: 235,000Cu.M

Concrete: 16,600Cu.M

Rebar: 834Tons

Formwork: 28,300Sq.M

Underground Piping: 8,500M

Water Proofing: 38,000Sq.M

Asphalt Concrete: 32,500Sq.M

Fencing: 7,000M

Power Cables: 10,000M

Lighting Fixtures: 300Nos.

Panels, DB’s, UPS: 25Nos.

Man-hours:1.3 million

Peak Labour Force:570

Contract Award Date:March 2001

Completion Date:January 2003

Contract Value:US$ 5.8 million

Project Title:Bhit Gas Field Development

Client Name & Address:LASMO Oil Pakistan Limited – 5th Floor, the Forum, Khayaban-e-Jami, Clifton, Karachi

Contact Name & Designation:Mr. M. White - Contracts Manager

Telephone & Fax No.:+92-21-5879951 Fax: +92-21-5838490

Location:Bhit, Sehwan (Sind), Pakistan

Operators:LASMO Oil Pakistan Limited

Consultant / Designer:Snamprogetti / Aquater

Description of Works :Pipeline construction comprising of civil, mechanical and E&I works including cathodic protection and fiber optic cable installation for Bhit Gas Field Gathering System between the well-head facilities and the main process plant.

Major Quantities:Trench Excavation: 46,300Cu.M

Right of Way: 45,000Cu.M

Backfilling: 16,200Cu.M

Gathering Line 24” dia: 22,150M

Flow Lines (07 Nos. 10” dia): 6,500M

Water Line 4” dia: 1,550M

Fiber Optic Cable Laying: 28,600M

Flow Line Tie-Ins: 07Nos. of Wells

Man-hours:0.9 million

Peak Labour Force:680

Contract Award Date:December 2001

Project Commencement Date:January 2002

Completion Date:January 2003

Contract Value:US$ 3.0 million

Project Title:Kadanwari Upgrade & Miano Gas Field Development

Client Name & Address:OMV Pakistan (Pvt.) Limited

6th Floor, UBLBuilding, Jinnah Avenue, Islamabad

Contact Name & Designation:Mr. David Morgan - Project Manager

Telephone & Fax No.:Tel: +92-51-273620-31 Fax: +92-51-273643-4

Operator:OMV Pakistan (Pvt.) Limited

Location:25 KM from Kadanwari

Description of Works :Engineering, Procurement, Construction and Commissioning (EPCC).

Development of 3 welhead areas, namely Khipro-1, Miano-2 & Miano-5, upgradation of existing Kadanwari Plant by installation of new Reception facilities and Pre-treatment units alongwith their integration with the existing plant receiving 200 mmscfd of Miano Sales Gas Through 45 km long carbon steel pipelines.

34.5 km, 16” dia. Pipeline (API 5Lx52, 16.0 mm wall thickness)

10.5 km, 12” dia. Pipeline (API 5Lx52, 14.0 mm wall thickness)

Man-hours (Direct):1.56 million

Peak Labour Force:450

Contract Award Date:April 1999

Completion Date:December 2001

Contract Value:US$ 17 million

Project Title:GASCO Ruwais Facilities Up-gradation Project

Client Name & Address:Technip, France

Contact Name & Designation:Mr. Jean – Christophe Huges, Subcontracts Manager

Telephone & Fax No.:+971-2 - 343778 Fax: +971-2-331264

Location:Ruwais, UAE

Owner:GASCO, UAE

Consultant / Designer:Technip, France

Description of Works :Civil and Mechanical works including Shutdowns.

Entire civil and mechanical works including design / construction of substation, revamping of existing Train-I & II, fabrication / erection of piping pipe supports equipment, structure, painting, insulation fire proofing, assembling and installation of stack etc including complete installation of SRU (Sulphur Recovery Unit).

Major Quantities:Earthwork:59,500Cu.M

Concrete: 9,500Cu.M

Rebar: 384Tons

Fire Proofing: 9,400Sq.M

Roads:15,800Sq.M

Equipment: 1,800Tons

Piping: 1,900Tons

Pipe Support: 100Tons

Steel Structure: 1,470Tons

Painting:32,630Sq.M

Insulation:17,090Sq.M

Total Shutdowns: 04 Nos.

Shutdown # 1 & 2: 14Days Each

Shutdown # 3 & 4: 05Days Each

Man-hours:2.0 million

Peak Labour Force:700

Contract Award Date:May 2000

Project Commencement Date:June 2000

Completion Date:December 2001

Contract Value:US$ 17.6 million


Project Title:Borouge Petrochemicals Project – Polyethylene Plant

Client Name & Address:Tecnimont S.p.A – Milan, Italy

Contact Name & Designation:Mr. F. Chiruttini – Construction Manager

Telephone & Fax No.:+390-2-6313-9535 Fax No. +390-2-6313-9244

Location:Ruwais, Abu Dhabi

Owner:Abu Dhabi Polymers Company Limited (Borouge)

Description of Works :Mechanical erection of equipment & steel structure. Piping works including fabrication, supply & erection of pipe supports. Instruments Installation and Painting.

Major Quantities:Equipment: 4,905Tons

Pipe supports: 225Tons

Piping fabrication:110,000dia inch

Piping erection: 66,200M

Steel structure: 2,600Tons

Erection of aluminum silos: 905Tons

Painting: 22,500Sq.M

Man-hours:2.4 million

Peak Labour Force:980

Contract Award Date:May 2000

Project Commencement Date:May 2000

Completion Date:October 2001

Contract Value:US$ 13 million

Project Title:70 mmscfd Zamzama Gas Field Facilities - EWT

Client Name & Address:BHP Petroleum (Pakistan) Pty Ltd. – 4 Nazimuddin Road, F-8/1, Islamabad, Pakistan

Contact Name & Designation:Mr. Ather Siddqui - Project Manager

Telephone & Fax No.:+92-51-264795, 264796 Fax: +92-51-252985

Location:Zamzama / Dadu

Owners / Operators:BHP Petroleum

Consultant / Designer:Kvaerner - Australia for Process Plant & Worley - Australia for Pipeline

Description of Works :Electro-mechanical construction, plant commissioning, sales gas pipeline and the gas gathering flowline system.

The pipeline and flowline system comprised of:

  • 12” diameter, 10.3 mm and 12.7 mm wall thickness, carbon steel sales gas pipeline, designed for 900 # class system, with total length of about 9 km.
  • 8” diameter, 8.2 mm wall thickness, weldable 12% chromium steel flowline, designed for 1500 # class system, with total length of about 3.5 km.

The pipeline and flowline crossed one large canal, forty-two waterways and one major and six minor road crossings along the Right of Way that also had quite a few bends of various angles.

Major Quantities:Equipment: 445Tons

(Electro-mechanical works)Steel Structure: 65Tons

Pipe Fabrication: 50Tons

Piping Erection: 100Tons

Painting/Blasting:3,200Sq.m

Insulation: 400Sq.m

Man-hours:0.20 million

Peak Labour Force:320

Contract Award Date:September 27, 2000

Project Commencement Date:October 02, 2000

Completion Date:March 2001

Contract Value:US$ 1.30 million

Project Title:826 mmscfd ASAB Gas Development (AGD)

Client Name & Address:Snamprogetti, Italy / Hyundai, Korea

Contact Name & Designation:Mr. K. J. Yoo - Project Manager

Telephone & Fax No.:+971-2-317748 Fax: +971-2-317898

Location:ASAB, UAE.

Description of Works :Mechanical and electrical erection comprising of:

Major Quantities:Structural erection: 5,118Tons

Equipment erection: 8,600Tons

Boiler erection: 1,416Tons

Tanks erection: 1,800Tons

Piping: 5,500Tons

Pipe supports: 400Tons

Painting: 208,000Sq.M

Insulation: 34,000Sq.M

Cable laying:1,225,000M

Cable termination: 35,000Nos.

Cable trays: 100,000M

Conduit: 26,000M

Lighting: 2,100Nos.

Earthing accessories: 1,721Nos.

Man-hours (Direct):2.50 million

Peak Labour Force:980

Contract Award Date:July 1998

Project Commencement Date:August 1998

Completion Date:August 2000

Contract Value:US$ 24.4 million

Project Title:180 mmscfd Kadanwari Gas Field

Owner:Lasmo Oil Pakistan.

Client Name & Address:Foster Wheeler - Foster Wheeler House Station RoadReadingBerkshire RG1 1LX,U.K

Contact Name & Designation:Mr. Roland Davies, Project Manager (Foster Wheeler UK)

Telephone & Fax no.:+92-21-572767 Fax: +92-21-570056 (Karachi)

Description of Works:Complete Electro-mechanical Erection, Preparation of Fabrication Drawings and Piping Isometrics, Structural Steel Work, Process & Utility Piping, Fabrication, Erection, Insulation, Painting and Fire Proofing.

Major Quantities:Rotary Equipment: 500Tons

Stationary Equipment: 1,900Tons

Steel Structure: 500Tons

Piping: 2500Tons

Pipe Support: 220Tons

Painting:30,000Sq.M

Insulation: 4,000Sq.M

Tanks: 200Tons

Total man-hours:1.2 million

Peak labour force:900

Contract Award Date:March 1994

Project Commencement Date:July 1994

Completion Date:September 1995

Contract Value:US$ 8.8 million

Project Title:195 mmscfd Qadirpur Gas Field

Client Name & Address:Oil & Gas Development Corporation (OGDC)

Contact Name & Designation:Dr. M. Rafique Sheikh - Actg. General Manager (Process)

Telephone & Fax no.:+92-51-8500259 Fax: +92-51-858939 (Islamabad)

Description of Works:Engineering, Fabrication & Complete Civil and Electro-mechanical Construction.

Major Quantities:Earthworks:142,068Cu.M

Concrete: 12,970Cu.M

Rebar: 1,120Tons

Rotary Equipment: 500 Tons

Stationary Equipment: 1,700 Tons

Piping: 2,000 Tons

Pipe Support: 50 Tons

Painting:31,000 Sq.M

Steel Structure: 700 Tons

Total man-hours:2.7 million

Peak labour force:1,200

Contract Award Date:April 1994

Project Commencement Date:April 1994

Completion Date:August 1995

Contract Value:US$ 10.6 million