BOROUGH OF POOLE
TRANSPORTATION ADVISORY GROUP – 28 JULY 2011
REPORT OF HEAD OF TRANSPORTATION SERVICES ON
2010/11 CAPITAL PROGRAMME OUTTURN
1.
1.1
1.2
Purpose of the Report and Policy Context
To note schemes delivered during 2010/11 and approve the re-phasing of
remaining budget to the 2011/12 Transportation Capital Programme.
The Capital Programme implements schemes that underpin the Council’s corporate
objectives and priorities, and delivers the targets set out in the Local Transport
Plan. Overall the programme seeks to achieve a balance of the associated aims
and objectives.
Recommendations
It is recommended that the Portfolio Holder be requested to approve :
2.1
3.
3.1
3.2
3.3
The re-phasing of budgets remaining in the 2010/11 Capital Programme to the
2011/12 Capital Programme, as detailed in Appendix A.
2010/11 Capital Programme
Details of expenditure on the 2010/11 Transportation Capital Programme is shown
in Appendix A.
The final budget totalled £3,450,290.39 and, of that, £3,250,195.13 was spent
(94.2%).
A breakdown of how the budgets and spend were made up is as follows,
2.
LTP funding
Developer
(Grants, prudential
borrowing & external
contributions)
Other
TOTAL
BUDGET
SPENT
£2,892,201.05
£2,725,769.34
94.2%
£71,330.74
£49,816.83
69.8%
£486,758.60
£474,608.96
97.5%
£3,450,290.39
£3,250,195.13
94.2%
3.4
The balance of the budget is £200,095.26. There are several reasons why this
underspend occurred,
3.4.1 Scheme costs were lower than originally estimated, e.g. the Pay & Display
machine contract and Ashley Road. In this latter case the works originally
included lighting improvements for the Mansfield Road car park but these
could not be undertaken as the car park is leased. Also, a Legal Agreement
to allow lighting to be installed in the access alongside the Co-op has taken
longer to sort out than expected.
1
3.4.2 Works were delayed or progressed slower than anticipated, e.g. the period of
winter snow delayed some site work. In some cases (Civic Centre bus
interchange, Sandbanks cycling scheme) anti-skid surfacing was delayed to
2011/12 as this is very weather dependent.
3.4.3 Uncertainty about office accommodation, i.e. the £25,000 unspent on the
Bus Priority at Signals contract was because the necessary computer
facilities need to be installed in that accommodation. This situation is still
under review.
As a consequence approval is now sought to re-phase £200,095.26 to the 2011/12
Capital Programme.
3.5
Appendix A shows small budget overspends for Structural Highway Maintenance,
i.e. £2,471.88 for Principal Roads and £90,960.43 for Unclassified Roads. The total
overspend of £93,432.31represents 8.6% of the budget. Approval to the overall re-
phasing would then effectively mean that the corresponding budgets in 2011/12 will
be reduced by these amounts.
JULIAN McLAUGHLIN
Head of Transportation Services
Appendix A - 2010/11 Capital Programme
Appendix B - 2010/11 Highway Structural Maintenance Programme
Appendix C – Detail regarding some of the more significant schemes in the
programme
Name and Telephone Number of Officer Contact: Graham Spicer (01202) 262072
TAG280711T3A
2
APPENDIX A
TRANSPORTATION SERVICES CAPITAL PROGRAMME
UNSPENT
(rephase to
2011/12)
£0.00
£0.00
£49,853.13
£0.00
£8,941.37
£0.00
£0.00
£16,273.85
£0.00
£0.90
£9,622.08
£0.00
£4,687.29
£3,015.36
£92,393.97
2010/11 OUTTURN PERFORMANCE
TACKLING CONGESTION
Ashley Cross improvements
Commercial Rd/ Station Rd improvements
Ashley Rd design (North Rd to Alder Rd)
Ashley Road/ Alder Road/ Poole Rd design
Civic Centre Bus Interchange
Alder Road PTC feasibility
Oakley Hill j/w Oakley Lane
ITS - VMS, CCTV
ITS Implementation : UTMC Database
SED Traffic model
Transport Asset Management Plan
Miscellaneous
Poole Road feasibility
LTP3 advanced design
LTP3 development
TOTAL
BUDGET
SPENT
£5,836.91
£4,363.00
£95,609.18
£456.02
£177,328.67
£1,276.77
£1,455.26
£47,803.41
£2,642.13
£120,353.90
£19,600.00
£158.64
£8,721.45
£52,370.68
£537,976.01
£5,836.91
£4,363.00
£45,756.05
£456.02
£168,387.30
£1,276.77
£1,455.26
£31,529.56
£2,642.13
£120,353.00
£9,977.92
£158.64
£4,034.16
£49,355.32
£445,582.04
TOTAL TACKLING CONGESTION
DELIVERING ACCESSIBILITY
Poole Bus Station Improvements
Bus Facilities - shelters, raised kerbs
Bus Priority at Signals
SW Passenger Transport Information
Safe Routes to School
School Sch 08/09 - Canford Heath F&M
School schemes 08/09 - Ad Astra refuge
Buckholme Towers - Zebra in Sandbanks Road
School 20mph/ School Zones
Corfe Hills Foundation Secondary School Zone
20mph Zone - Courthill First
20mph zone - Merley First
20mph zone - Lilliput First
20mph zone - Stanley Green First
Baden Powell & St Peters SRTS
Branksome Heath Middle/ Sylvan First Schools
Parkstone Grammar (Foundation Secondary)
Oakdale South Rd Middle
Cycling - Darbys Corner cycleway + toucan
Cycling/Walking - Dropped Crossings
Cycling - Sandbanks Rd to Panorama Rd
Cycling - Penn Hill Avenue
Wimborne Rd j/w Tatnum/ Garland Rd to Tcentre
£74.63
£86,615.05
£30,738.16
£22,030.02
£30,511.26
£11,396.07
£4,925.26
£16,754.44
£2,186.19
£697.90
£342.46
£56,379.56
£12,557.66
£7,858.30
£5,295.26
£4,612.76
-£1,388.44
£23,769.00
£37,742.30
£60,396.32
£50,221.65
£74.63
£82,483.10
£5,738.16
£22,030.02
£30,511.26
£11,396.07
£1,990.58
£8,944.10
£232.22
£697.90
£342.45
£56,379.56
£9,978.26
£3,649.14
£3,721.75
£3,759.66
-£1,388.44
£18,860.02
£32,763.65
£57,852.49
£50,221.65
£0.00
£4,131.95
£25,000.00
£0.00
£0.00
£0.00
£2,934.68
£7,810.34
£1,953.97
£0.00
£0.01
£0.00
£2,579.40
£4,209.16
£1,573.51
£853.10
£0.00
£4,908.98
£4,978.65
£2,543.83
£0.00
3
APPENDIX A
TRANSPORTATION SERVICES CAPITAL PROGRAMME
2010/11 OUTTURN PERFORMANCE
Miscellaneous
Pedestrian Crossing Facilities
Ringwood Road Crossing Facility
Nuffield Industrial Estate - Accessibility study
Rights of Way Improvement
Residential Disabled Parking Bays
MSCP replacement Pay Machines
Pay and Display machines-on-street parking and surface car parks
TOTAL
BUDGET
SPENT
UNSPENT
(rephase to
2011/12)
-£2,523.73
£22,222.97
£1,193.73
£1,410.72
£65.57
£0.00
£24,924.83
£30,393.01
£38,164.34
£4,957.52
£21,026.36
£1,652.42
£23,888.44
£247,599.38
£831,397.26
£32,916.74
£15,941.37
£3,763.79
£19,615.64
£1,586.85
£23,888.44
£222,674.55
TOTAL DELIVERING ACCESSIBILITY
SAFER ROADS
The George road safety improvements
Dorset Way/ Canford Way RS improvements
Constitution Hill Rd/ Danecourt Rd RS imps.
ROAD SAFETY STRATEGY
Speed Limit Review
Speed Camera Installation
Specific Road Safety Grant
£720,625.61 £110,771.65
£9,533.28
£39,563.20
£29,590.70
£1,015.94
£50,790.26
£231.11
£25,499.17
£156,223.66
£9,533.28
£39,563.20
£24,542.64
£1,015.94
£35,864.94
£231.11
£25,499.17
£136,250.28
£0.00
£0.00
£5,048.06
£0.00
£14,925.32
£0.00
£0.00
£19,973.38
TOTAL SAFER ROADS
MAINTENANCE
Highways (see Appendix B for detail)
Principal Roads
Non - Principal Roads
Unclassified Roads
Street Light Column Replacements 10/11
Bridges
CANFORD BRIDGE EXCEPTIONAL SCHEME
Canford Bridge Phase 2 preliminary work
Gravel Hill Embankment
Towngate Bridge Bearings and Joints
Canford Suspension Bridge
Poole Bridge Approach Spans
£145.00£2,616.88
£155,837.71£155,837.71
£925,118.09 £1,016,078.52
£227,414.01£214,972.44
£45,250.74
£219,513.88
£750.00
£279,078.78
£14,476.95
£0.00
£33,878.72
£211,692.46
£750.00
£264,280.08
£12,036.00
£0.00
-£2,471.88
£0.00
-£90,960.43
£12,441.57
£11,372.02
£7,821.42
£0.00
£14,798.70
£2,440.95
£0.00
TOTAL MAINTENANCE £1,867,585.16 £1,912,142.81 -£44,557.65
Major Developer Contribution Schemes
Hunger Hill Gyratory
Marston/ Bay Hog Gyratory
Poole Bridge Approach spans feasibility
Old Orchard Plaza
Shapwick Road Footbridge
Yarrow Road/ Fancy Road link
£15,771.06
£33,104.96
£2,000.00
£868.01
£4,529.36
£834.91
£57,108.30
£15,771.06
£16,599.38
£156.39
£868.01
£2,199.55
£0.00
£35,594.39
£0.00
£16,505.58
£1,843.61
£0.00
£2,329.81
£834.91
£21,513.91
TOTAL DEVELOPER
TOTAL CAPITAL PROGRAMME
£3,450,290.39 £3,250,195.13 £200,095.26
4
APPENDIX B
HIGHWAYS STRUCTURAL MAINTENANCE EXPENDITURE 2010/11
LOCATION
Principal Roads
A350 Holes Bay North R/A
A35 Commercial Rd (Glenair Ave to Parr Street)
Old year scheme
Retention on Old year scheme
£145.00
£2,471.88
£2,616.88
TREATMENT
SPENT
Total Principal Roads
Non-Principal Classified Roads
C304 Penn Hill Ave (Kings Ave to St Osmunds Rd)
C312 Constitution Hill Rd
C/way resurfacing
Old year scheme
£150,695.89
£5,141.82
£155,837.71
Total Non-Principal Classified Roads
Unclassified Roads
Cromer Rd (Wroxham Rd to Yarmouth Rd)
Livingstone Rd (Uppleby Rd to Victoria Rd)
Abbotsbury Road
Egmont Rd (scheme to span two financial years)
Alton Rd (No.10 to Conifer Avenue)
French Road
Canford Magna (No.11 to Oakley Lane )
Small Footway Schemes
Planned Patching
Special Drainage
Marlott Road
Wharf Close
Dalkeith Rd (Ettrick Rd to The Avenue)
Guernsey Road
Arrowsmith Road
Ashley Road
Canford Cliffs Road
Rowland Avenue
Lower Golf Links Rd (Golf Links Rd to Moor Rd)
Dale Road
Hawkins Road
Roman Rd (Upton Way to Gladelands Way)
LIDLS re Allens Lane
Old year scheme
Old year scheme
Old year scheme
Old year scheme
Old year scheme
Old year scheme
Kerb & f/way reconstruction, c/way resurfacing
Kerb & f/way reconstruction, c/way resurfacing
C/way major strengthening 60/40
C/way resurfacing
Kerb & f/way reconstruction, c/way resurfacing
Kerb & f/way reconstruction, c/way resurfacing
C/way resurfacing
Major strengthening 150/40
C/way resurfacing
C/way resurfacing
C/way resurfacing
£111,053.39
£90,687.17
£60,510.50
£113,489.43
£66,779.38
£28,902.55
£31,060.10
£23,681.24
£115,783.92
£108,509.32
£36,963.08
£26,448.41
£24,834.25
£80,905.75
£55,743.01
£9,741.94
£23,988.73
£2,117.22
£2,438.66
£3,040.60
£369.87
£30.00
-£1,000.00
Total Unclassified Roads
Grand Total
£1,016,078.52
£1,174,533.11
5
APPENDIX C
2010/11 TRANSPORTATION CAPITAL PROGRAMME
Comments are included below covering the more significant schemes in the programme.
TACKLING CONGESTION
C1
Ashley Road
General Traffic Management measures to reduce congestion, avoid delays to
buses whilst reducing air pollution and improving road safety are being considered.
The first phase of this, to encourage better utilisation of the existing car parks using
improved signage and some lighting improvements, has been completed.
Civic Centre Interchange
Bus services between Poole and Bournemouth currently carry nearly six million
passengers a year. The high frequency of the M1 and M2 services in particular
means there are approximately 30 buses an hour on these services. The majority
of buses travelling in the Poole direction pass down North Road and then onto and
around the Civic Centre gyratory before exiting back up Fernside Road towards the
Shah of Persia. This route can take several minutes, particularly at peak times,
which is now saved by making the existing bus link by the clock tower two-way.
This potential time saving here has long been recognised by the bus companies as
capable of making significant improvement to the timetable and reliability, hence
increasing the attractiveness of using a bus in preference to the car on this busiest
of routes.
Over 260,000 bus passengers each month are now benefitting from the new priority
measures, which has reduced journey times on the main Bournemouth - Poole
route by up to four minutes. The existing bus link by the clock tower at the Civic
Centre has been widened to allow a two way flow of buses. This allows direct
access to Fernside Road for westbound buses instead of having to negotiate the
busy Civic Centre roundabout. In addition to delivering quicker journeys, the new
route saves 18,000 bus miles and 3,000 gallons of fuel every year. All road users
have also benefitted from a significant reduction in vehicle movements on the
gyratory. Other improvements to the area include new pedestrian footpaths and an
easily accessible bus stop for students from the adjacent Poole College.
C2
Civic Centre Bus Interchange
Footway improvements
6
C3
ITS Strategy
This element of the Capital Programme is designed to meet the needs of the
Intelligent Transport Strategy as proposed initially by Mouchel and most recently by
Atkins. This year‟s works were split into three distinct elements. (i) Upgrade 6 no.
traffic signal junctions to web based controllers, with another 3 junctions being
funded through other budgets. (ii) Convert existing strategic variable message
signs (VMS) from radio control to GPRS communications (iii) Convert existing car
park VMS from radio to GPRS, i.e. similar to mobile phone technology. The traffic
signal junction upgrades were put on hold due to uncertainties about staff/office
locations but is now back on track to be completed shortly. The strategic VMS
conversion is now complete and enables messages to be displayed within seconds
of them being entered into the instation PC, whereas before it took up to ten
minutes for the messages to change. Unfortunately it has not been possible to
upgrade the car park VMS as the on-site equipment is not currently suitable for
adaptation to GPRS. A suggestion on the way forward with these signs will be
brought to a future TAG meeting.
SED Traffic Model
2010/11 BoP contribution to the Partnership funded SE Dorset Transport Study
enabled the finalisation of the Transport Study, which has formed the basis of the
long term transport strategy recently adopted in the 3rd Local Transport Plan for
Bournemouth, Poole and Dorset. The strategy has been developed in line with DfT
guidance and backed up by the technical evidence base using the multi modal
transport model, which in turn will strengthen bids for transport funding from central
Government, including the recent Local Sustainable Transport Fund (LSTF) bids.
LTP3 Development
The local authorities across Dorset have, or are in the process of, setting out
proposals for new housing levels, economic growth and other local priorities within
their Core Strategies. The Local Transport Plan (LTP3) was developed within that
framework and sets out a strategy that complements those proposals through:
Minimising the need to travel;
Improving the strategic network;
Managing and maintaining the existing network more efficiently;
Providing Public Transport alternatives to the private car;
Giving choices of active travel and „greener‟ travel choices;
Making travel safer;
Managing demand for private car use.
ACCESSIBILITY
C4
C5
C6
Bus Stop Facilities: Shelters/ kerbs
New bus shelters have been provided at Runnymede Avenue, Lagland Street and
Waterloo Road (Plantation Road), the latter following a petition from residents from
the nearby elderly person‟s dwellings. Raised kerbs to permit flat, level access to
the bus for wheelchair users and parents with buggies have been provided at a
number of locations including North Road, Wallisdown Road and Rectory Road.
7
As part of this programme some
additional funding (£10,000) was
provided by Bournemouth University to
extend the raised bus stop outside the
University.
C7
School schemes – Canford Heath F&M and Longspee
The need for an improved route to these schools was identified during discussions
regarding the renewal of the School Travel Plans for Canford Heath First and
Middle Schools and for the draft Travel Plan for Longspee School. In addition, an
increasing number of cyclists had been using the footpath between Harwell Road
and Learoyd Road to gain access to the Nuffield Estate. The existing path has now
been widened to provide a segregated cycle facility, which improves access and
safety for both pedestrians and cyclists using the path. We were successful in
gaining a grant of 50% of the cost of this scheme from Sustrans, as part of their
Links to Schools project.
Foot/ cycleway to Learoyd Road
C8
Footpath imps. in front of school
Ad Astra Refuge
A refuge in Adastral Road, near the junction with Sherborn Crescent, has been
widened. This is a popular crossing point at school times and the widened facility
makes this much easier.
Corfe Hills Foundation Secondary School Zone
A School Zone was created in Higher Blandford Road for this school. The scheme
comprised static and variable message signs. The latter, vehicle activated, signs