SITUATION IDENTIFIED IN:Item Planning (cprmp2101m000)
SITUATION DESCRIPTION:
Incorrect familty ATP is obtained even if the planning bill of material of the product family consists of valid
plan items (as far as the dates are concerned). The sytem gives a message "QUANTITY EXCEEDS AVAILABLE TO
PROMISE FOR MPS - ITEM".
SOLUTION DESCRIPTION:
The proper family ATP will be obtained based on appropriate effective dates of the planning bill of material.
This solution solves defect 2477.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp2101m00Script/Library Sourcermpdll2503
B40 c4 cpcprmp2101m00Script/Library Sourcermpdll2403
Solution :2607
VERSION(S):
cpB40_c
cpB40L_c_cnt0, cpB40L_c3_cnt0, cpB40L_c4_cnt0
cpB40L_c_mcr0, cpB40L_c3_mcr0, cpB40L_c4_mcr0
SITUATION IDENTIFIED IN:Simulate Master Production Schedule (cprmp1202m000)
SITUATION DESCRIPTION:
When "Consider Material Constraints" was set to "Yes", a fatal index out of dims error would sometimes occur.
SOLUTION DESCRIPTION:
The fatal index out of dims error no longer occurs when "Consider Material Constraints"is set to "Yes".
This solution solves defect 3687.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmpdll5205Script/Library Sourcermpdll5205
Solution :12053
VERSION(S):cpB40_b5, cpB40_c3
SITUATION IDENTIFIED IN: Simulate Master Production Schedule (cprmp1203m000) and Transfer Master Production
Schedule (cprmp2207m000)
SITUATION DESCRIPTION:
When using IRP (updating and simulating) and then transferring Master Production schedule to EPR, we get strange
orderproposal from the MPS/MRP generation (timrp1210m000):
The system does not removed the old orders (MPS/MRP preoduction batches) and does not generate new orders in case of a
regenerative MRP (timrp1210m000). Net-change MRP does not work either: the old orders are not removed if some data have
been changed in the planning of the item.
SOLUTION DESCRIPTION:
The MRP net change status was not correctly updated. This has been changed.
The programming error has been corrected by identification number: DF12836-1.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp1203m00Script/Library Sourcermpdll2520
B40 c4 cpcprmp1203m00Script/Library Objectrmpdll2520
Solution :13630
VERSION(S):cpB40_b5, cpB40_c3
SITUATION IDENTIFIED IN: Simulate MPS (cprmp1202m000)
SITUATION DESCRIPTION:
tranaction is on when changing a value in the multi site situation
SOLUTION DESCRIPTION:
Error does not occur in a multi site environment anymore.
The programming error has been corrected by identification number: DF16214-1.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp2101m00Script/Library Sourcermpdll3002
Solution :13653
VERSION(S):cpB40_b5, cpB40_c3
SITUATION IDENTIFIED IN:Update MPS (cprmp1201m000)
SITUATION DESCRIPTION:
Demand forecast and projected inventory is not aggregated correctly to the multi site plan.
SOLUTION DESCRIPTION:
The exploded interplant demand is not taken into account anymore in the aggregation to the multi site plan.
Scheduled interplant receipts are not aggregated to the multi site plan anymore.
The programming error has been corrected by identification number: DF16255-1.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp2101m00Script/Library Sourcermpdll0002
Solution :13741
VERSION(S):cpB40_b5, cpB40_c4
SITUATION IDENTIFIED IN:Maintain Work Centers (cprpd2101m000)
SITUATION DESCRIPTION:
Aggregate work centers does not work after changes in normal work centers.
We defined a group work center consisting of two normal work centers. In the group work cneter, the calendar date (basic
capacity, basic number of shifts, basic number of resources) is aggregated from the normal work centers by using the
"aggregate" button.
Then we change the basic capacity, number of shifts etc. for one of the normal work centers. If we now hit the aggregate
button again, it does not update the fields in the group work center.
The calendar of the group work center (cprpd2104m000) is always updated. Here it works.
SOLUTION DESCRIPTION:
When data is changed of the child work centers, it will now be aggregated to the goup work center.
The programming error has been corrected by identification number: DF2265-1.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprpd2101m00Script/Library Sourcerpd2101
Solution :13776
VERSION(S):cpB40_b5, cpB40_c4
SITUATION IDENTIFIED IN:Update Master production Schedule (cprmp1201m000)
SITUATION DESCRIPTION:
Interplant demand and receipts in the past should be deleted when rolling the multi site plan(s).
SOLUTION DESCRIPTION:
The programming error has been corrected by identification number: DF16526-1.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp1201m00Script/Library Sourcermpdll0003
Solution :14182
VERSION(S): B40_c
SITUATION IDENTIFIED IN: cprmp1202m000 "Simulate Master Production Schedule"
SITUATION DESCRIPTION:
When Scheduled Receipt was moved to earlier Planning period or actual receipt was done in earlier Planning period as
Production Plan a wrong projected inventory was calculated which results in wrong Production Plan and wrong MPS
orders.
SOLUTION DESCRIPTION:
Software changed so Actual and scheduled receipts in periods before production plan are taken into account which results in
correct Projected inventory and Production Plan.
Modifications in software components have been marked with DF 16804-1.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp1202m00Script/Library Sourcermpdll5100
B40 c4 cpcprmp1202m00Script/Library Objectrmpdll5100
B40 c4 cpcprmp1202m00Script/Library Sourcermpdll2520
B40 c4 cpcprmp1202m00Script/Library Objectrmpdll2520
B40 c4 cpcprmp1202m00Script/Library Sourcermpdll2420
B40 c4 cpcprmp1202m00Script/Library Objectrmpdll2420
Solution :14358
VERSION(S):cpB40_b5, cpB40_c4
SITUATION IDENTIFIED IN:Simulate MPS (cprmp1202m000)
SITUATION DESCRIPTION:
Zooming in field: MPS planner, in session cprmp1202m000 (simulate master production schedule) gives fatal error: no
permission for.
SOLUTION DESCRIPTION:
The zoom is now working.
This solution solves defect 17836.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp1202m00Formrmp1202m0001
Solution :14503
VERSION(S): B40_b, B40_c
SITUATION IDENTIFIED IN: timrp1210m000 "Planned (MPS)/MRP Orders/Batches"
SITUATION DESCRIPTION:
When using session timrp1210m000 "Planned (MPS)/MRP Orders/Batches" no Material Requirement was generated when
planning method for material is MPS and planning method for parent is MPS also.
Also material requirements loaded from erp system having wrong dates, which results in dependent demand in wrong mps
periods.
SOLUTION DESCRIPTION:
Software changed so Material Requirement for lower level mps parts of mps process items are generated.
Also loaded material requirement is put in the right mps period now.
Modifications in software components have been marked with DF 17999.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp1201m00Script/Library Sourcermpdll2501
B40 c4 cpcprmp1201m00Script/Library Objectrmpdll2501
Solution :14645
VERSION(S): B40_b, B40_c
SITUATION IDENTIFIED IN: cprmp2101m000 "Item Planning"
SITUATION DESCRIPTION:
Sometimes family ATP was high because of high inventory of one of the family members, which results in wrong order
promises.
SOLUTION DESCRIPTION:
Calculation of family ATP is changed so inventory on hand and scheduled receipts are not taken into account.
Modifications in software components have been marked with DF 2968-1.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp2101m00Script/Library Sourcermpdll0004
Solution :14978
VERSION(S): tiB40_b, tiB40_c
SITUATION IDENTIFIED IN:cprmp5280m000 (Copy Sales Budget to Demand Forecast)
SITUATION DESCRIPTION:
When zooming on the sortcode and selecting a sort code (JH1)which contains the item
code error message "Item code must be part of sort code" is coming.
The field sort code is not filled in. !!
When manually inserting (without zooming) the same sort code (JH1), no error message comes up, this is correct.
SOLUTION DESCRIPTION: Form and script is modified accordingly.
this solution solves the defect 18136
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp5280m00Script/Library Sourcermp5280
B40 c4 cpcprmp5280m00Script/Library Objectrmp5280
B40 c4 cpcprmp5280m00Formrmp5280m0001
Solution :15037
VERSION(S):B40_c
SITUATION IDENTIFIED IN:cprmp2101m000 (Item Planning)
SITUATION DESCRIPTION:
Field helptext on "scheduled receipts" in Itemplanning (cprmp2101m000) says that session Update MPS (cprmp1201m000)
should be run to get this field updated.
This is not correct, as the field is updated after session timrp1210m000 (Generate Planned (MPS)/MRP batches/orders) has
run for the concerned plan-item.
P.S.: I refer to the field "scheduled receipts" in the planning-overview on for "Goods Flow" and not to the field "scheduled
receipts" under the header Inventory Data
SOLUTION DESCRIPTION:
Help text is modified accordingly.
this solution solves the defect 19041
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp2101m00Help TextFCrmp300.srec
B40 c4 cpcprmp2101m00Help TextFCrmp300.srec
Solution :15101
VERSION(S): B40_b, B40_c
SITUATION IDENTIFIED IN: cprmp1202m000 "Simulate Master Production Schedule"
SITUATION DESCRIPTION:
When generating a mps production plan. Fixed and minimum order quantities where not taken into account.
SOLUTION DESCRIPTION:
Software changed so order lot-sizing parameters will be taken into account.
Modifications in software components have been marked with DF 18138-1.
VRCpackagecomponentcomp_typecomp_code
B40 c4 cpcprmp2101m00Script/Library Sourcermpdll5100
B40 c4 cpcprmp2101m00Script/Library Objectrmpdll5100