Version: / V1.0
Date: / 17/11/2016
Author: / DCC
Classification: / DCC Public

DCC Test Completion Report

Interface Testing for Release R1.2

Completion Report for Region: Central & South

1

Document Control (Document Control Heading)

Revision History (Document Control Subtitle)

Revision Date / Summary of Changes / Changes
Marked / Version Number
9/11/16 / Draft to reflect completion of Systems Integration Testing / No / 0.1
15/11/16 / Updated with Internal comment / No / 0.2
17/11/16 / Updated to v1.0 / No / 1.0

Reviewers

Name / Title / Responsibility / Release Date / Version Number
[Name redacted] / Project Director, Test Assurance / 15/11/16 / 0.2
[Name redacted] / Regulatory Director / 11/11/16 / 0.1

Approvals

Name / Signature / Title / Responsibility / Release Date / Version Number
[Name redacted] / Project Director, Test Assurance / 17/11/16 / 1.0
DCC Test Completion Report Region: CS
Interface Testing R1.2 / DCC Public / Page 1 of 4

Table of Contents

1Completion of Exit Criteria

DCC Test Completion Report Region: CS
Interface Testing R1.2 / DCC Public / Page 1 of 4

1Completion of Exit Criteria

The Interim Interface Test Completion Report [1]for Region: Central & South included an explanation for one of the exit criteria‘SIT successfully completed for that Region’, particularly SIT Stream 4. At the time of publishing the Interim Report, work was continuing to complete the testing of the Registered Supplier Agent and Other User User Roles, and the variant Communications Hubs.

On 4 November 2016, the Test Assurance Board issued certificates for the completion of the work on SIT Stream 4, and therefore DCC considers that the final exit criteria for Interface Testing in the Central and South Regions has now been met.

This brief report, combined with the Interim Interface Testing Completion report form the totality of the DCC Interface Testing Completion Repot for the Central and South Regions.

DCC Test Completion Report Region: CS
Interface Testing R1.2 / DCC Public / Page 1 of 4

[1]