MISSING FROM HOME RISK MANAGEMENT MEETING
DATE:______
TIER:______
CHILDDOB
Legal Status
SOCIAL WORKER
PLACEMENT Details
ATTENDANCE
NAME / DESIGNATION / CONTACT DETAILSChronology of MFH episodes
Refer to ‘Missing from Home - Case History’. Ensure that the history is up to date and check it against records held by placement and police
Information from Safe and Well Checks and Independent Return Interviews:
Include anything relevant such as location found, locations visited, identities of associates, drug / alcohol issues, crimes, injuries etc.
Date / InformationSummary of Information from Return Interviews / Safe and Well Checks:
- Motivation for MFH
- Possible destinations and associates
- Identified / suspected risks
Child’s Early History:
Brief summary of issues from birth
Placement History:
Including previous levels of vulnerability / previous levels of risk taking
Friends / Connected People / Contacts -consideration of risk:
Name and relationship / Contact details / Frequency / Relationship with carer / Risk analysisMAIN AREA OF CONCERN / RISK:
e.g. CSE, drugs/alcohol, crime, self harm etc.
PUSH FACTORS:
- Problems in placement re relationships with staff, peers, abuse
- Family break up – change of placements
- Difficulties in educational placements
- Mental health problems
- Bullying (inc. Facebook)
- Pregnancy
PULL FACTORS:
- Running to be with friends
- Contact with family
- Sexual relationships
- CSE
- Drugs
- Alcohol
- Crime
PROTECTIVE FACTORS
- Positive relationships
- Education / training
- Hobbies / interests
OVERALL EFFECT ON WELLBEING:e.g. CSE, drugs, crime, self harm
- Prostitution
- Addiction
- Offending
- Missing education
- Victim of crime
- Perpetrators of crime
- CSE
- Drugs/alcohol dependency
- Isolation
- Homelessness/sleeping rough
ANALYSIS OF INFORMATION:
Main themes including risk and protective factors and solutions
CHILD’S VIEWS
ASSESSMENT OF RISK (social work assessment not police categories)
- Manageable – known whereabouts no concerns
- Vulnerable – known whereabouts with concerns
- At risk – unknown and missing
- High risk of harm – unknown / missing / with additional concerns
- Significant risk of harm – serious and immediate concerns
Note: if risk of harm is high or significant then escalation is required to the next tier – inform team manager, IRO and service manager
RISK REDUCTION PLAN
- Specific: What / Why / Who / Where / Which
- Measurable: how much / how many / how will be know
- Achievable: how / how realistic
- Relevant: is this plan realistic and of benefit to this specific child
- Timely: when – short and long term planning [tied into risk management]
Action / Purpose / Responsible / Timescale
REVIEW DATE
Review at current Tier
Escalate to Tier 2
Escalate to Tier 3
Note: Each tier meeting should be reviewed once at that tier and if missing continues to be an issue, then it should be escalated to the next tier
Tier 1: Chaired by senior social worker
Tier 2: Chaired by IRO
Tier 3: Chaired by area manager
1