Data Collection Sheet

Area Calculations

Openings (Windows and Doors)

Client Name:
Property Address:
Building Faces:

Construction Elements

Floor Type 1
(Please Specify) / Floor Type 2
(Please Specify)
Wall Type 1
(Please Specify) / Wall Type 2
(Please Specify)
Wall Ties:
Roof Type 1
(Please Specify) / Roof Type 2
(Please Specify)

Please tick appropriate boxes and/or enter information as required.

Accredited Construction Details Adopted:

Glazing Details:

Type / Double / Triple / Hard Coat / Soft Coat
Air Gap / 6mm / 12mm / 16mm / Other
Frame / Wood / PVC / Metal / Other
Filling / Air / Argon / Other / Low-e:
En:

U-Value to achieve:

Door details:

Type / Solid / Half Glazed
Glazing / Double / Triple / Hard Coat / Soft Coat
Air Gap / 6mm / 12mm / 16mm / Other
Frame / Wood / PVC / Metal / Other
Filling / Air / Argon / Other / Low-e:
En:

U-Value to achieve:

Primary Heating:

Description/Type
Manufacturer
Model / Efficiency
Heat emitters

Controls:

Programmer / Room Stat / TRV’s
Bypass / Flow Switch / Zone Control
Other:

Interlock:

Secondary Heating (e.g. open fireplace etc):

Description/Type

Hot Water:

Primary Source (Central Heating) / Single Immersion / Double Immersion / Other
Description/Type

Cylinder Details:

Cylinder: / Present / None / Litres
Insulation: / Factory / Jacket / Thickness mm:

Electricity Tariff:

Economy 7 / Standard Tariff / 10hr Tariff / 24hr Tariff

Energy Efficient Lighting:

Total Light Fittings / Low Energy Light Fittings

Air Pressure Testing:

Expected or Achieved Air Pressure

Ventilation Type:

Natural / Trickle Vents
No of Extract Fans / Whole House Mechanical Ventilation / Heat Recovery Mechanical Ventilation
No of Vents / No of Chimneys
Notes:

6

ABBE Level 3 Diploma in On-Construction Energy Assessment: Data Record Sheet.

Version 1.3 12/01/11

SA AC REGIONAL 1 © STROMA CERTIFICATION LTD