«insert project number» «insert project name»
Edit the Table of Contents for each Project by modifying the document according to the instructions in shaded boxes, and then delete the instructions.
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
Division 00 – Procurement and Contracting Requirements
Introductory Information
000110 Table of Contents
Procurement Requirements
001000 Solicitation
Insert the Public Bid Advertisement below, if included in the Project Manual.
001113 Advertisement for Bids
002113 Instructions to Bidders
Insert the Owner’s Supplementary Instructions below, if any.
00 2200 Supplementary Instructions
Edit the Table of Contents, listing geotechnical or environmental data here (003NNN), if any.
003100 Available Project Information
003113 Preliminary Schedules
003119 Existing Condition Information
003121 Survey Information
003124 Environmental Assessment Information
003126 Existing Hazardous Material Information
003132 Geotechnical Data
004113 Bid Form
004313 Bid Security Form
004513 Bidder’s Qualifications
004539 EDGE Affidavit
Contracting Requirements
005200 Agreement Form
005214 Subcontract Form (OAC 153:1-03-02)
006113 Performance and Payment Bond Form
Insert a sample Certified Payroll Report form below, if included in the Project Manual.
006243 Certified Payroll Report
Insert the Property Tax Affidavit form below, which applies to PK-12 and Career-Tech Schools and 2-Year Community College Districts and Technical College Districts only.
006246 Contractor’s Personal Property Tax Affidavit
007100 Contracting Definitions
007213 General Conditions
Insert the Owner’s Supplementary Conditions below, if any.
007300 Supplementary Conditions
007343 Wage Rate Requirements
Use the item above if the Project is subject to prevailing wage law and will be constructed entirely with state or local funds. If the Project is constructed using federal funds in any amount, use the item below and contact OFCC to develop supplementary documents to comply with Davis-Bacon wage requirements. Insert prevailing wage rates after the appropriate Wage Rate Requirements document.
007343.50 Wage Rate Requirements (Federal Funded Project)
SPECIFICATIONS GROUP
Expand the Table of Contents below, list each specification Section by number and title – Large Project Manuals should be divided into two or three volumes in a logical manner.
GENERAL REQUIREMENTS SUBGROUP
Division 01 – General Requirements
012100 Allowances
013216 Construction Progress Schedule
FACILITY CONSTRUCTION SUBGROUP
Division 02 – Existing Conditions
Division 03 – Concrete
Division 04 – Masonry
Division 05 – Metals
Division 06 – Wood, Plastics, and Composites
Division 07 – Thermal and Moisture Control
Division 08 – Openings
Division 09 – Finishes
Division 10 – Specialties
Division 11 – Equipment
Division 12 – Furnishings
Division 13 – Special Construction
Division 14 – Conveying Equipment
Divisions 15 through 19 – Not Used
FACILITY SERVICES SUBGROUP
Division 20 – Not Used
Division 21 – Fire Suppression
Division 22 – Plumbing
Division 23 – Heating, Ventilating, and Air Conditioning
Division 24 – Not Used
Division 25 – Integrated Automation
Division 26 – Electrical
Division 27 – Communications
Division 28 – Electronic Safety and Security
Division 29 – Not Used
SITE AND INFRASTRUCTURE SUBGROUP
Division 30 – Not Used
Division 31 – Earthwork
Division 32 – Exterior Improvements
Division 33 – Utilities
Division 34 – Transportation
Division 35 – Waterway and Marine
Divisions 36 through 39 – Not Used
PROCESS EQUIPMENT SUBGROUP
Division 40 – Process Integration
Division 41 – Material Processing and Handling Equipment
Division 42 – Process Heating, Cooling, and Drying Equipment
Division 43 – Process Gas and Liquid Handling Equipment
Division 44 – Pollution Control Equipment
Division 45 – Industry-Specific Manufacturing Equipment
Division 46 – Water and Wastewater Equipment
Division 47 – Not Used
Division 48 – Electrical Power Generation
Division 49 – Not Used
END OF DOCUMENT
M160-000110 2014 Edition (2015-JUL) Page 3 of 3