KEY QUALIFICATIONS

I am qualified MBA & Graduate mechanical engineer with fifteen years of experience with the various types of oil, gas & infrastructure projects in India & Middle East. I have also done Diploma in Mechanical engineering.

My skills include the management of various types of projects on planning, execution & contracts management. I have gained good knowledge about various types of EPC, shut-down, general contracts & FIDIC contracts for planning, implementation & execution. Recent achievements have included managing the delivery of multi-disciplinary engineering, procurement, construction & commissioning project for civil & mechanical works. My professional experience also includes leading & managing technical staff of QS & planners. I am fluent in English.

EDUCATION AND PROFESSIONAL QUALIFICATION

1.  Master of Business Admin. (MBA – Technology) with 1st class from Chifley Business School Australia.

2.  Bachelors of Mechanical Engineering with Higher 2nd class from Mumbai - India

3.  Diploma in Mechanical Engineering with Higher 2nd class from Mumbai - India.

4.  Member of Project Management Institute (PMI) USA.(1998-2000)

5.  Honorary Vice President for Project Management Institute (PMI-WIPC).(1998-2000)

6.  Certification in Primavera P3 Ver. 2

7.  Proficient use of Primavera Ver. 3.1, Enterprise, Sure Track, MS Project -2003

8.  Proficient use of Excel, Word, Power point, MS Access.

EMPLOYMENT HISTORY:

Abroad: Period Company Position

A. From Feb-07 to till date xxx xxxx

B. From Sept-04 to Jan-07 xxx xxxx

C. From April-02 to Aug-04 xxx xxxx

D. From Feb-01 to March-02 xxx xxxx

India:

E. From June`96 to Feb-01 xxx xxxx

F. From July`94 to May`96 xxx xxxx

SUMMARY OF DUTIES, FUNCTION & RESPONSIBILITIES HANDLED WITH RELATED TO INDIA & ABORAD PROJECTS:

Planning & Project Control:

1.  Preparation of Project Execution strategy for various Oil, Gas, Petrochemicals, LNG Tanks, Offshore EPIC projects.

2.  Preparation of Base Line Schedule for various types of project such as Oil, Gas, Power plant, Water pipelines & Infrastructure projects for activities up to 12,000 activities along with its cost loading in P-3 and getting it approved from the client.

3.  Preparation of manpower & Equipment (cranes) deployment planning. Carrying out rigging studies.

4.  Leading the site planning team for preparing detailed base line schedule (Level – IV).

5.  Preparation of Recovery Plans, manpower & equipment requirements for the short falls.

6.  Tracking & Up dating the schedule through Primavera – P3.

7.  Preparing, discussing & finalizing for time extensions with the client.

8.  Preparation of Weekly & Monthly progress reports, Catch up schedules, Statistical Resource Analysis Reports for the Management & client.

9.  Preparation of Monthly Review Meetings documents & Monitoring cash Inflow & Outflow for the project.

10. Productivity monitoring & cost report.

11. Helping contract department for preparing & finalizing time extension & other contractual issues / claims.

12. Preparation of the internal budget & monitoring cost variances for the project.

13. Participating cost control method implementation.

14. Preparation of Earned Value Report & Productivity Analysis.

15. Heading the QS & Planning dept. as Project Controller for effective cost controlling, contracts management & budget controlling.

Contracts Administration & Cost control works:

1.  Ensure effective contract administration, and ensure close co-ordination with operations & finance department personnel.

2.  Assist with the determination of necessary subcontract pre-qualification requirements, and assess subcontractor submission, and maintain a register.

3.  Participate in the drafting of the contract, and its subsequent administration, including the assessment of variations and the approval of progress claims/ extension claims, referring disputed issues to management for determination.

4.  Preparing the budget & then comparing the actual cost against estimated cost at various level of the project.

5.  Arrange for quotations to be called from pre-qualified sub contractors, evaluate bids, and participate in contract negotiation and award.

6.  Actively participate in preparing tender estimates.

7.  Prepare & Submit of Monthly Progress Invoice, and discuss and settle with the client.

8.  Prepare the claims for additional jobs and negotiation & settlement of the same with the client at various level of the project.

9.  Preparing Closed out report.

DETAILED EXPERIENCE RECORD OF ABROAD PROJECTS:

FEB-07 to TILL DATE M/S xxx, as

Project Handled:

·  EPIC of Offshore Platform work for BH & MM Oil fields

·  EPIC of Ras Gas CCO&C works

·  Up gradation of DCS at PS-2 & PS-3 Offshore platforms (EPIC)

·  PS-2 & PS-3 Offshore major shutdown – Nov-08 – Mar-09

·  SHELL – GTL project (ongoing)

Present assignment:

Since last 3 months I am working for XXX project from XX as secondment. I am leading the team of planner in their Central Planning team. I have been given a training for GAME - ME module and SAP modules to monitor & control the ongoing project at XX. I am also responsible for the following.

·  Implementation of GAME – Global Asset Management Excellence & SAP using Primavera P-6.

·  Preparing & updating progress, cost & resources for various work orders in SAP.

·  Guiding & monitoring sub contractors for preparing 6 weeks & 3 months look ahead schedules & catch up plans. Reviewing & approving them with line managers.

·  Setting up & monitoring KPI & AIM (Asset Information Management)

·  Guiding the area planner for preparing detailed schedules for utilities.

·  Preparing various - earned value & cost reports for management.

·  Preparing Risk Analysis Matrix for the various activities.

·  Supporting front line manager in achieving the project goals.

Responsibilities & Job Description:

·  Defining baseline program & the resource requirement for the project such as manpower & materials.

·  Monitoring & updating the projects through P-3.

·  Preparing the cost estimates for various maintenance jobs for Ras Gas.

·  Preparing internal budget for the project & monitoring the cost for the activities.

·  Preparing weekly & monthly reports and other techno-commercial documents for the management & client.

·  Leading the Planning team.

·  Maintaining the status of project deliverables such as drawings & material deliveries logs.

·  Preparing, negotiating & finalizing monthly bills & cash in flow & other contract administrative work.

SEPT-2004 – JAN-2007 M/S xxx, as

Project Handled:

·  EPC of Museum of Islamic Arts Package # 3 & 4 (US $ 220 millions) (M&E works)

·  EPC of Science & Technology Park ( US $ 175 millions) (M&E works)

Responsibilities & Job Description:

·  Defining baseline program & the resource requirement for the project such as manpower & materials.

·  Preparing earned value report, weekly & monthly reports and other techno-commercial documents for the management & client.

·  Evaluating change requests from the client and prepare the variations.

·  Submission, negotiation & finalization of variation orders client side.

·  Negotiation & finalization of variations & bills contractor side.

·  Liaising with the client for variation preparation, discussion & execution.

·  Leading & Managing a team of 4 specialist engineers from QS & planning.

·  Prepare & submit management weekly & monthly management reports.

·  Delivering multi-disciplinary engineering works from concept through to preliminary design.

·  Maintaining the status of project deliverables such as drawings & material deliveries logs.

·  Monitor & Control material procurement.

·  Programs and budgetary control.

·  Justifying the extension of time & related cost for the project.

·  Participating in cost control method implementation.

·  Preparing, negotiating & finalizing monthly bill & cash in flow.

·  Supporting the management in the areas of operation & execution.

APR 2002 – AUG 2004 M/S xxx, as

Project handled:

·  Construction of 4th & 5th LNG Tanks at Ras Gas

·  Mechanical installation of NGL-4 Dukhan Project (including 3 months major shut down)

·  NGL – 1 & 3 Shut Down project – 3 months normal maintenance & 5 months s/d

Responsibilities & Job Description:

·  Ensuring effective contract administration & ensure close co-ordination with operations & finance department personnel.

·  Assist with the determination of necessary subcontract pre-qualification requirements, and assess subcontractor submission, and maintain a register.

·  Participate in the drafting of the contract, and its subsequent administration, including the assessment of variations and the approval of progress claims, referring disputed issues to management for determination.

·  Comparing the actual cost against estimated cost at various level of the project.

·  Arrange for quotations to be called from pre-qualified sub contractors, evaluate bids, and participate in contract negotiation and award.

·  Prepare & Submit of Monthly Progress Invoice, and discuss and settle with the client.

·  Prepare the claims for additional jobs and negotiation & settlement of the same with the client at various level of the project.

·  Preparing Closed out report.

FEB 2001 – MAR 2002 M/S xxx, as

Project handled:

·  Mechanical installation of Jebel Ali Power Plant – Installation of 3 WHRB & 3 BPST Boilers, 3 Generator units & 2 Auxiliary & plant piping works.

Responsibilities & Job Description:

·  Preparation of baseline schedule & overall plan for the project using Primavera P-3 (Level-III).

·  Preparation of manpower & equipment (cranes) deployment schedule.

·  Identifying the critical areas & preparing recovery plans for the short falls.

·  Preparing daily, weekly & monthly reports.

·  Preparing Histograms & S-curves.

·  Tracking & up dating the schedule through Primavera – P3.

·  Contracts management.

·  Budget preparation, monitoring & approvals from management – time to time.

JUN 1996 2001 – FEB 2001 M/S xxx, as

Project handled:

·  Mechanical construction of DHDS unit for IOCL Haldia & HPCL Refineries, Mumbai.

·  Installation Construction of Water Pipelines (Dia 2.x105kms water pipeline) for BWSSB at Bangalore, Karnataka.

·  Mechanical construction of Hydro Cracker & Generation (HCU & HGU) Unit installations for IOCL Panipat Refinery, Hariyana

·  Installation of Structural Steel & BOP piping for Jindal Vijaynagar Steel Plant at Bellary, Karnataka.

·  EPC of laying 3nos – 6” Gas pipeline x 80 kms. with 5 sub station for IPCL Refinery Baroda, Gujrat under BOOT concept (Built Operate Own & Transfer Project) (Rs. 30 billions)

·  Civil & Mechanical construction of Phase – III Expansion Project at ONGC Hazira, Gujrat.

Responsibilities & Job Description:

·  Preparation of Project Execution strategy for various Oil, Gas, Petrochemicals, LNG Tanks, Water pipelines & Power & Desalination Plant and Infrastructure EPC projects.

·  Preparation of baseline schedule & overall plan for the project using Primavera P-3 (Level-III).

·  Preparation of manpower & equipment (cranes) deployment schedule.

·  Identifying the critical areas & preparing recovery plans for the short falls.

·  Tracking & up dating the schedule through Primavera – P3.

·  Prepare the Internal budget for the project.

·  Budget monitoring & Cost controlling.

·  Preparation of Monthly Review Meetings documents & Monitoring cash Inflow & Outflow for the project.

·  Comparing the actual cost against estimated cost at various level of the project.

·  Participating cost control method implementation.

·  Preparation of Earned Value Report & Productivity Analysis.

JUL 1994 – MAY 1996 M/S xxx, as

Project handled:

·  Special Steel Plant (Wire Rod Mill) – Modification project incld. Shut/down 3 months

·  Piping & equipment erection for South Seas Distillery & Beverages Ltd.

·  Piping & equipment erection for Mehta Rubber Chemicals Ltd.

Responsibilities & Job Description:

·  Look after day to day production of fabrication shop.

·  Arrange for third party inspection.

·  Execute the turnkey projects for various chemical industries at the site.

·  Boiler repair and boiler piping erection.

·  Manpower planning & meeting erection targets.

* * * * * * *

Page 7 of 7