ITEM 401 – STORM SEWER PIPE
Note to Designer:Add the following if applicable (for elbows, typically specify 22.5º bend).
Add
401.2.2.3The tendered Quantity of ___ mm pipe includes elbows having a 22.5º/30º/45º bend.
401.2.2.4Tension assemblies shall be supplied per Standard Drawing 140-1 and/or as specifically shown on the Plans / attached Culvert Detail.
Replace
401.2.4.3.2Profile PE pipe and fittings shall conform to CAN/CSA – B182.8.
Note to Designer: Use the following clauses for pipes on recaps/upgrades where the final centerline grade will be similar to the existing.
Add
401.4.1.1.1The existing cross-culvert at Station ______shall be replaced with a ______, as shown on the attached Culvert Detail.
OR, if a table is needed
Add
401.4.1.1.1Existing cross culverts shall be replaced with new culverts in accordance with the details shown in Table 401-A.
Table 401-A
Replacement Concrete Cross Culverts
Location / Size(mm) / Class / Transition
Slopes / Tension
Assembly
401.4.2.4.3The excavated Pavement, and stockpiled material not reused per 401.4.2.4.5, will be designated as waste and become the property of the Contractor for disposal outside the Work Site.
Note to Designer: Concrete Pipes
September 11, 2018
ITEM 404 – PRECAST CATCH BASIN
Note to Designer:Consider the following for pipes larger than 1350 mm.
Add
404.2.5Catch basins with openings for 1500 mm and larger shall be test fit at the plant.
Replace
404.4.8.1Holes shall not be more than 50 mm greater in diameter than the outside diameter of the connecting pipe for connecting pipe diameters less than 900 mm, and shall not be more than 100 mm greater in diameter than the outside diameter of the connecting pipe for connecting pipe diameters equal to or greater than 900 mm.
August 17, 2018
ITEM 407 – FRAME WITH GRATE OR COVER
Note to Designer:Add the following statement unless the contract is for work on a roadway that will be maintained by a municipality which prefers a CB frame & grate different from the NBDTI standard.
Add
407.2.2.1No substitute for the frame and grate shown on Standard Drawing 407-1 will be accepted.
Note to Designer:For median catch basins at the bottom of a sag, or for catch basins in other locations where the rate of runoff into the frame & grate will be unusually high, add the following:
Add
407.2.3The frame and grate for CB # at Station ______shall have a grate surface area of 0.744 m2 (8 s.f.).
December 1, 2010
ITEM 408 – ADJUSTMENT OF CATCH BASINS AND MANHOLES
Note to Designer:If the grade change is less than 150 mm a grade ring will be used. Use 150 mm in 408.4.4.1.
If the grade change is greater than 150 mm risers will be used. Use 300 mm in 408.4.4.1.
If the grade change is greater than 300 mm use Item 404.
Add
408.4.4.1Adjustments are anticipated to be no more than ___ mm to finished grade.
December 1, 2010
ITEM 416 – CURB AND GUTTER
Use the following if there are no plans
Add
416.4.1.1Concrete curb and gutter shall be installed from Station ______to ______, left side / right side / both sides.
416.4.4.1.1The Contractor shall be responsiblefor all removal of and/or damage to the Pavement and other surfaces beyond the designated limits of the excavation and for the repair or otherwise restoration of the areas affected.
November 21, 2014
ITEM 419 – CONCRETE SIDEWALK
Use the following if there are no plans
Add
419.4.1.1Concrete sidewalk shall be installed from Station ______to ______, left side / right side / both sides.
December 1, 2010
ITEM 423 – REMOVAL OF CURB AND GUTTER
Use the following if there are no plans
Add
423.4.1.1Curb and gutter shall be removed from Station ______to ______, left side / right side / both sides.
December 1, 2010
ITEM 424 – REMOVAL OF SIDEWALK
Replace
424.1.1This Item consists of the removal of asphalt / concrete sidewalk and curb.
Add
424.4.1.1Asphalt / concrete sidewalk and curb shall be removed from Station ______to ______, left side / right side / both sides.
December 1, 2010
ITEM 425 – REMOVAL OF UNDERGROUND SERVICES
Add
425.4.1.1The existing cross culvert at Station shall be removed under this Item.
For Several Culverts
Note to Designer:In Table 425-A, include location and offset columns if necessary.
Add
425.4.1.1Culverts to be removed under this Item are shown in Table 425-A.
Table 425-A
Culverts to be Removed
Station / Side / Size/Type of Culvert / Approx. Length (m)For Culverts & Catch Basins
425.4.1.1Existing cross culverts and/or catch basins to be removed under this Item are shown in Table 425-A.
Table 425-A
Culverts and Catch Basins to be Removed
Station / Size of Culvert / Catch Basin / Approx. Length/Height (m) / RemarksNote to Designer:Use the following on recap and upgrading contracts where the final centreline grade is similar to the existing centreline grade.
Add
425.4.6.1For the cross culvert(s) removed at Station(s) , the transitions in the Aggregate Base/Subbase layers shall be at 6:1.
If some salvaged pipe will be reused on the contract
Add
425.4.7.1Salvaged concrete pipe not reused on the Work Site under Item 140 shall be transported to the Owner’s ______Maintenance Depot and stockpiled as directed by the Engineer.
If no salvaged pipe will be reused on the contract
Add
425.4.7.1Salvaged concrete pipes shall be transported to the Owner’s ______Maintenance Depot and stockpiled as directed by the Engineer.
December 1, 2010
1