Standard & Long Term Planning Schedules April 2009
Copyright 2009 Exostar LLC and E2open, Inc. All Rights Reserved. 3201 - 7
A Planning Schedule is a set of “Collaborations” between a Buyer and Supplier. The Buyer publishes the schedule and the Supplier reviews and responds to it.
Collaboration = Buyer + Site + *Item + Supplier
* Item comes from the buyer material number and/or supplier material number.
Step 1: Locate Planning Schedule (PS) Collaborations
There are two typical business scenarios that apply when searching for planning schedules:
1. Search for a set of PS items that were sent to you by a buyer and require a response
2. Search based on business criteria (i.e. part numbers, vendor codes, plant or storage locations etc.), in order to check the schedule requirements
Option 1: Search for Set of Items Sent by Buyer
§ On Navigation Tree: [+] Demand Plan & Forecast à Planning Schedules à Search
§ Under the Run Date field, enter the date that the buyer sent you the set of PS items
NOTE: The date format has to be ‘Mon/DD/YYYY’. Example: Aug/22/2007
§ Click Search
§ The Collaboration Selector page appears with the search results listed
Option 2: Search Based on a Business Question
§ On Navigation Tree: [+] Demand Plan & Forecast à Planning Schedules à Search
§ Enter keywords to search, click Search
§ The Collaboration Selector page appears with the search results listed
Step 2: View PS
§ From the Collaboration Selector page, use checkboxes to select items to be viewed
§ Click View
§ The Multi-Collab View (MCV) page appears
How to Navigate Multi-Collab View (MCV) Page
View by PS Record and Details (or ‘Data Measures’) – scroll up & down
View by Time Reference – scroll left & right
Change the Date Range – use Start/End Dates (top of page), click Refresh icon
View Collab Attributes (record details) – use icon next to each collab record
Send PS Record to Buyer – use icon next to each record
Change Data Measure Details (rows) – use icon
Change Data Columns at Left – use icon
Modify Display Area Size at Left – click and drag the icon
View Data Measure Attributes/Details – click hot links (blue text) in Data Measure column
View PIT (point-in-time) Attributes/Details – click PIT value (number links in main part of screen)
Legend for Time References (default view):
Approx. 4 weeks of Daily time buckets
8 Weekly time buckets starting on a Monday
21 Monthly time buckets starting on the 1st of each month
Legend for PS Highlighting
Supplier Response Mismatch:
Supplier Response differs from Schedule
Demand Change:
(Current) Demand differs from Prior Demand
Schedule Change:
(Current) Schedule differs from Prior Schedule
PDT/RT Change:
Current Planned Delivery Time (PDT) is different from previous PDT
Status – shows up on today’s date:
Supplier has viewed the collaboration
Supplier has sent the collaboration to the buyer
Step 3: Respond to PS
Option 1: Update Quantity or Date
§ For the collaboration to be updated, click on the data measure called Supplier Response
§ A new pop-up window appears where the dates and quantities can be edited
§ At the PIT Info page, enter new values where applicable for each PIT (date and quantity)
§ Click Update
§ If changes are made, it is REQUIRED to select a Reason Code for that row (scroll to the right to see the Reason Code column)
Note: If the Reason Code selected is ‘X-Other’, then you must add text in the Notes field.
§ Once changes are completed, click Update
§ Click OK to close the Confirmation note
§ Click OK to refresh the MCV page with the changes
Step 4: Send PS Collaboration to Buyer (from MCV Page)
§ From MCV page, click on icon (next to the row of attribute data for each collaboration)
§ Click on Attribute Detail link in dropdown box
§ The Attribute Detail popup box should appear
§ At the Status field, change the status to Sent
§ Click Update
Long Term Planning Schedules (LTPS)
A Long Term Planning Schedule is very similar to a Standard PS. Both types are accessed and viewed the same way. However, an LTPS can only be viewed and no response can be sent by the Supplier.
Step 1: Locate LTPS
§ On Navigation Tree: [+] Demand Plan & Forecast – Long Term Planning Schedules - Search
§ Enter keywords to search (or use * as a wildcard search)
o Use Run Date to locate a set of PS items sent from a buyer
§ Click Search
§ The Collaboration Selector page appears with the search results listed
Step 2: View LTPS
§ From the Collaboration Selector page, use checkboxes to select records to be viewed
§ Click View
§ The Multi-Collab View (MCV) page appears
§ From MCV page, click on icon (next to the row of attribute data for each collaboration)
§ Click on Attribute Detail link in dropdown box
§ The Attribute Detail popup box should appear