MECO Magnet System Safety Review

1005S – 3rd Floor

June 3, 2003

8:30 – 8:40Introduction D. Phillips

8:40 – 9:10MECO Description/Overview M. Hebert

9:10 – 9:40Magnet Systems Introduction B. Smith

9:40 – 9:55Solenoid Protection from Primary BeamK. Brown

9:55 – 10:25Proposed Quench Detection and Protection System Introduction B. Smith

10:25 – 10:35Break

10:35 – 11:30Magnet Structure/Structural Analysis and Cryostats P. Titus

11:30 – 12:00Cryogenic Process and Control Description, Relief Valve Calculations,

and ASME Code ComplianceB. Smith

12:00 – 1:00Lunch

1:00 – 1:30Explosion Risk of Cryogenic Liquids Exposed to Ionizing RadiationW. Meng/B. Smith

1:30 – 1:45Anti-proton Stopping WindowD. Weiss

1:45 – 2:00Magnet PS and Electrical Safety Plan W. Meng

2:00 – 2:15ODH, Maintenance and Confined SpaceD. Phillips

2:15 – 2:30Magnet Installation Plan, Lifting Fixtures, Critical Lifts P. Titus

2:30 – 3:00Comments, Discussion & Summary of Major Action ItemsD. Phillips

9/28/2018

1

MECO Magnet System Safety Review

1005S – 3rd Floor

June 3, 2003

While all committee members are encouraged to attend the entire presentation, below is a table of minimum recommended viewing:

Time / Subject / ALARA / ESRC / ASSRC / CSC / RSC
8:30 – 8:40 / Introduction / X /  /  /  / X
8:40 – 9:10 / MECO Description / Overview / X /  /  /  / X
9:10 – 9:40 / Magnet Systems Introduction / X / X /  /  / X
9:40 – 9:55 / Solenoid Protection from Primary Beam / X / 
9:55 – 10:25 / Proposed Quench Detection and Protection System Introduction / X / X
10:25 – 10:35 / Break
10:35 – 11:30 / Magnet Structure / Structural Analysis and Cryostats / 
11:30 – 12:00 / Cryogenic Process and Control Description, Relief Valve Calculations, and ASME Code Compliance / X
12:00 – 1:00 / Lunch
1:00 – 1:30 / Explosion Risk of Cryogenic Liquids Exposed to Ionizing Radiation /  /  / X
1:30 – 1:45 / Anti-proton Stopping Window / X / X
1:45 – 2:00 / Magnet PS and Electrical Safety Plan /  / 
2:00 – 2:15 / ODH, Maintenance and Confined Space /  / X
2:15 – 2:30 / Magnet Installation Plan, Lifting Fixtures, Critical Lifts / X / X
2:30 – 3:00 / Comments, Discussion & Summary of Major Action Items / X / X / X / X / X

9/28/2018