ATTACHMENT B

(CEQA Findings)

Eldorado–Ivanpah Transmission Project

CEQA Findings of Fact

Attachment B - CEQA Findings of Fact

Regarding the Final Environmental Impact Report/Environmental Impact Statement for the

Eldorado to Ivanpah Transmission Project

State Clearinghouse No. 2009071091

EIS No. DES-10-16

1.1 Introduction to CEQA Findings

This document provides the findings of the California Public Utilities Commission (CPUC), pursuant to the Guidelines for Implementation of the California Environmental Quality Act (CEQA; California Code of Regulations, Title 14, §15091) on the Eldorado to Ivanpah Transmission Project (EITP, or the project) proposed by Southern California Edison (SCE, or the applicant). A Joint Environmental Impact Report/Environmental Impact Statement (EIR/EIS) has been prepared for the proposed project. According to CEQA, the lead agency must prepare findings when an EIR is prepared to demonstrate how each impact has been addressed. These findings are listed in Section 1.6 of this document.

1.2  Certification

The CPUC, as the CEQA lead agency for the project, certifies that:

1)  The Final EIR/EIS has been completed in compliance with CEQA;

2)  The Final EIR/EIS project was presented to the Commission and the Commission has received, reviewed, and considered the information contained in the Final EIR/EIS and hearing documents prior to approving the project; and

3)  The Final EIR/EIS reflects the CPUC’s independent judgment and analysis.

The CPUC has exercised independent judgment in accordance with Public Resources Code, Section 21082.1 in retaining its own environmental consultant, directing the consultant in preparation of the EIR/EIS, and reviewing, analyzing, and revising material prepared by the consultant.

In accordance with Public Resources Code §21081 and CEQA guidelines §15091, the Commission has made one or more specific written findings regarding significant impacts associated with the project. Those findings are presented below, along with a presentation of facts in support of the findings. Concurrent with the adoption of these findings, the Commission adopts the Mitigation Monitoring Plan as presented in the Final EIR/EIS.

The documents and other materials that constitute the record of proceedings on which the project findings are based are located at the California Public Utilities Commission, 505 Van Ness Avenue, San Francisco, CA 94102. The custodian for these documents is Central Files.

1.3  Project Background

The Project Description, including the description of the Whole of the Action, which includes the Ivanpah Solar Generating System (ISEGS) project, can be found in the Final EIR/EIS for the project. The project includes Applicant Proposed Measures that represent commitments by SCE to avoid or minimize impacts to environmental resources caused by the proposed EITP or its alternatives.

In two cases, new information provided by the applicant on the project after the publication of the DEIR/EIS led to a reduction in the significance or severity of an impact under CEQA and/or NEPA. Impact HYDRO-2 (Lowering of Water Table or Interference with Aquifer Recharge) and IMPACT PUSVC-2 (Project Construction Temporarily Increases Water Use, and Project Operation Contributes to Increased Long-Term Water Consumption) have been reduced to less than significant. These impacts were determined to be potentially significant in the Draft EIR/EIS; however, when the draft was published, the source of the water to be used for dust suppression during construction was unknown. The water supply in the project area is limited, and therefore, there was a possibility that the impact on groundwater supplies could be significant. After the Draft EIR/EIS was published, the applicant submitted information on water supply that included a designated source: wells owned by Molycorp Minerals, LLC. This information was incorporated into the hydrology and water quality analysis and the public services and utilities analysis. The updated CEQA determination is less than significant with mitigation for both of these impacts. The potential for lowering local groundwater levels during project construction would be negligible, localized, and short term.

1.3.1 Project Objectives/Purpose and Need

The applicant’s purpose for the proposed project can be found in the Final EIR/EIS.

1.4 Administrative Record

For the purposes of CEQA and the findings below, the administrative record for EITP consists of the following documents:

1.  The April 2010 Draft EIR/EIS, including appendices, technical reports, the Scoping Report from the 2009 Scoping Meetings and letters submitted as part of scoping, documents cited in the Draft EIR/EIS, letters submitted on the Draft, and the presentation provided by the CPUC and BLM at the public meetings on the DEIR/EIS;

2.  The November 2010 Final EIR/EIS, including all appendices, technical reports, comments, responses to comments, and documents cited in the Final EIR/EIS;

5. Relevant CPUC and BLM agency reports, studies, decisions, official opinions, informal communications, and planning documents;

6. Other relevant State, Federal, and local agency reports, studies, decisions, official opinions, informal communications, and planning;

7. Other environmental documentation prepared by the CPUC, BLM, and other public agencies for other actions and programs relevant to the project;

8. All documents submitted by members of the public and non-privileged documents submitted by public agencies in connection with the project;

9. All relevant reports and documentary or other evidence submitted at public meetings on the project;

10. Minutes and transcripts of all public meetings held on the project (no oral comments were given at the scoping meetings or public meetings held on the DEIR/EIS);

11. All non-privileged application materials, including the PEA and PEA pre-filing memos, relevant reports, memoranda, maps, letters and other planning documents prepared by the applicant, CPUC and BLM staff, and consultants, for the development of the EIR/EIS; and

12. Other written materials relevant to compliance with CEQA and NEPA or to decisions on the project.

The location of the administrative record presently is the Office of Ecology and Environment Inc., 130 Battery Street, San Francisco, CA, 94111.

1.5 Environmental Review Process and the EIR/EIS

The public participation and notification program for the EITP EIR/EIS focused on two primary areas under CEQA and NEPA; these areas were (1) the Public Scoping process and (2) the Draft EIR/EIS public review process. This section discusses the specific public scoping methods used for this EIR/EIS to comply with state and federal public outreach requirements.

The key milestones associated with preparation of the EIR/EIS are summarized below.

Notice of Preparation: Pursuant to the state and federal requirements discussed above, an NOP and an NOI were distributed for the EITP. The CPUC provided an NOP to the California State Clearinghouse for release on July 23, 2009. The NOP was mailed to133 government agencies, as well as 96 residents and nongovernmental organizations to inform the public of the proposed project and provide notice of the public scoping meetings. The BLM published an NOI for NEPA in the Federal Register on July 27, 2009.

Scoping Report: In accordance with 40 CFR 1503.4, which requires that all substantive comments be considered to the extent feasible prior to project decisions, comments received during the scoping period were categorized by issue and included in a comprehensive scoping summary report entitled Southern California Edison Eldorado–Ivanpah Transmission Project Scoping Summary Report, issued and made available on the CPUC website for the project in October 2009 (Appendix E). The report summarized the comments and issues raised during the scoping period between July 27 and August 26, 2009.

Four primary areas of concern were identified during the public scoping process: (1) impacts of the project on several biological resources, especially desert tortoise, (2) compatibility with regional land uses such as the planned Southern Nevada Supplemental Airport, (3) compatibility with other existing rights-of-way designations, and (4) cumulative impacts.

Draft EIR/EIS: The Draft EIR/EIS was published with the California State Clearinghouse on April 30, 2010 and in the Federal Register on May 7, 2010. A 45-day public comment period for the Draft EIR/EIS that was published April 30, 2010, concluded June 26, 2010, including joint public comment meetings conducted along the proposed route in Nipton, California and Las Vegas, Nevada on Wednesday, May 26, 2010.

Following the release of the Draft EIR/EIS comments were received from the following governmental entities:

·  US Environmental Protection Agency;

·  California Department of Fish and Game;

·  California Department of Transportation;

·  California Department of Toxic Substances Control;

·  California State Lands Commission;

·  Clark County Department of Aviation;

·  Mojave Dessert Air Quality Management District: and

·  Nevada Department of Wildlife.

Comments were received from the following interested parties:

·  BrightSource Energy;

·  Center for Biological Diversity, San Francisco Office;

·  Desert Conservation Program;

·  Powers Engineering;

·  Sierra Club;

·  Southern California Edison; and

·  Western Watersheds Project.

The EITP Final EIR/EIS includes responses to comments on the Draft EIR/EIS, additional information (e.g., survey results received after publication of the Draft EIR/EIS), and updated information (e.g., updates to plans or regulations that were changed after the publication of the Draft EIR/EIS).

Notice of Completion (Draft EIR/EIS): CEQA Guidelines Section 15085 requires that a Notice of Completion (NOC) be filed by the lead state agency upon completion of the Draft EIR. The NOC informs the reviewers that a Draft EIR is complete. The NOC for the EITP Draft EIR/EIS was filed with the State Clearinghouse on April 30, 2010.

Notice of Availability (Draft EIR/EIS): Similar to the NOC, NEPA requires that a Notice of Availability (NOA) be filed by the lead federal agency once the EIR/EIS is available for public review (40 CFR 1506.10). An NOA of the EITP was published in the Federal Register on May 7, 2010.

Public Meetings: The CPUC and the BLM conducted joint public comment meetings on the Draft EIR/EIS in Nipton, California and Las Vegas, Nevada on Wednesday, May 26, 2010. Eight persons attended the two meetings. No verbal or written comments were submitted prior to June 26, 2010, close of the comment period.

Project Resources: The EIR/EIS e-mail address, telephone hotline, a project-specific Internet site were available to provide additional access for public comment and inquiry. All meetings and document publications were also advertised in local newspapers in California and Nevada.

Final EIR/EIS: Notice of availability of the EITP Final EIR/EIS was circulated on November 5, 2010. An errata letter for the NOA was circulated on November 9, 2010.

1.6  Environmental Impacts and Findings

Public Resources Code 21081 states that no public agency shall approve or carry out a project for which an EIR has been completed which identifies one or more significant effects on the environment unless the public agency makes one or more finding for each of those significant effects. The “project” selected for certification is the proposed project, or the environmentally superior alternative that meets the project objectives. Therefore, these findings focus strictly on the impacts of the proposed project.

These findings could include:

1)  Changes or alterations have been required in, or incorporated into, the project which mitigate or avoid the significant effects on the environment.

2)  Those changes or alterations are within the responsibility and jurisdiction of another public agency and have been or can and should be adopted by that other agency.

3)  Specific economic, legal, social, technological, or other considerations, including considerations for the provisions of employment opportunities for highly trained workers, make infeasible the mitigation measures or alternatives identified in the environmental impact report.

Pursuant to Public Resources Code 21081 and CEQA Guidelines 15091, the Commission has made one or more of these specific written findings regarding significant impacts associated with the project. These findings are based on the information contained in the Draft EIR/EIS and the Final EIR/EIS for the project, as well as information provided by the applicant and gathered through the public involvement process contained in the administrative record. Such findings are provided in section 1.6.1 and 1.6.2 below.

1.6.1  Significant Environmental Impacts that Have Been Reduced to a Less than Significant Level and Significant Combined Environmental Impacts of the Whole of the Action

The Final EIR/EIS for the EITP included thorough consideration of the environmental resources along the proposed project route and related major components and its alternatives, as well as the potential impacts associated with construction and operation and maintenance of the project. The CPUC has determined that the mitigation measures identified for the EITP will reduce impacts associated with construction and operation activities to mitigate to a less than significant level.

Impacts identified as “less than significant with mitigation” in the EITP Final EIR/EIS and related findings for each issue are discussed below. The Commission hereby finds, pursuant to Section 21081, that the following environmental impacts can and will be mitigated to below a level of significance based upon the implementation of the mitigation measures in the EIR/EIS. These findings are based on the discussion of impacts in the detail issue area analyses presented in Chapter 3, “Environmental Analysis”, under Sections 3.2 through 3.14. The impacts of the ISEGS project have been reviewed and mitigated or accepted as part of the CEC and BLM decisions certifying this project. The combined impacts of the ISEGS and EITP project as part of the “Whole of the Action” are provided below only for purposes of disclosure.

1.6.1.1  Aesthetics and Visual Resources

As described in Section 3.2 of the EITP EIR/EIS, “Aesthetics and Visual Resources, the proposed project would be located primarily on BLM land; therefore, the methodology used to determine impacts on visual resources is consistent with the BLM’s guidelines for selecting KOPs, describing the views from these locations, determining the degree to which views would be impacted, and assessing the proposed project’s compliance with applicable VRM or VRI objectives. The assessment of the proposed project’s impacts was based on an evaluation of the changes to the existing visual environment that would result from construction, operation, and, maintenance of the proposed project. Based on the potential viewer groups and sensitivity of those groups, distance zones, landscape features KOPs were agreed upon by the applicant’s consultants, CPUC consultant, and BLM staff from both the Needles and Las Vegas field offices.

IMPACT AES-2: Degrade Existing Visual Character or Quality

The proposed project would not result in substantial degradation of the landscape. The proposed project would conflict with VRM or VRI objectives for one of the eight Key Observation Points (KOPs). At each of these locations, the proposed project would introduce strong levels of contrast with the existing structures in the viewshed by introducing linear elements of a larger scale and more prominent color.