PERSONAL DETAILS

Name: Esteban Luis Rodríguez Garriga

ID number: NIF 72815279-Q

Nationality: Spanish-Argentina

Civil Status: Married

Age: 56 years old.

Address: Av. Sancho el Fuerte 19 4º dcha. (31007) Pamplona, Spain

Private phone number +34-948268760 Mobile: +34-610845565

E-Mail: /

EDUCATION:

2004 Electronic Engineering The homologation of the Argentinian title was made by the

Education and Science Ministry of Spain , Credential 2004/H06710

2002 CCNA Cisco Systems (Regional PROYDESA, Bs.As.)

WORK EXPERIENCE:

Global Tunnelling Experts , Electronic Engineer as PLC-Electrician Supervisor and commissioning

STP Slurry Treatment Plant HK Mixshield S-959/961, diam 13m, long 2,86 km, Port Said Road Tunnel

Under The Suez Canal, Egipto (JV Arab Contractor and Orascom) 20-11-2016

CAPOSELE SCARL (JV GHELLA Spa - Vianinni Spa) Electronic Engineer responsible for PLC programming, installation of TBM EPB, 5-02-2015 30-04-17

AQUEDUCT PAVONCELLI BIS, CAPOSELE, Avellino, Italia (HK EPB S-821 dia 4,60 m long 8,5 Km)

SELI OVERSEAS Spa (Italia) Electronic Engineer responsible for PLC programming, installation

and commissioning of TBM EPB & HardRock, 24-11-2014 / 4-02-2015

Laos He Pian – Xe Namnoy Hydro Proyect (TERRATEC, double shield, DC TBM-H43 5,74m 12 Km)

SELI S.P.A. (Italia) Electronic Engineer responsible for PLC programming, installation and

commissioning of TBM EPB & HardRock, 21-06-2012 / 23-11-2014

Roma Metropolitana B1 (HK S-544 EPB 9,79 m 3 km) 2012

Milano Metropolitana Linea 5 (HK S-238 EPB 6,76 m 2,2 km) 2012

Milano Metropolitano Linea 5 (HK S-388 EPB 6,79 m 2,2 KM) 2013

Genale, Nageellee (Ethiopia) GD3 Hydroelectric Plant(CGGC)(SELI-Tolian HR without rings

8,13 m 12,4 km) 2013/2014

Tehran (Iran) Metro Line 7 SEPASAD GROUP (SELI, EPB 9,16m 6,8 Km) out 23-11-2014

UTE Vigo Das Maceiras (Acciona-FCC), Electrical and Electronic maintenance shift, Redondela

TBM – Double shield HR de Herrentnecht S-414 de 9,65 m 8,266 km 22-01-2011/14-09-2011

UTE Torrassa (Sacyr-Cavosa-Scrinser) Responsible for maintenance shift elecrical, water and air

services, Barcelona Austrian túnel system 1,7 km 01-07 / 09-07

UTE Tuneladora Metro – Aeroport (Ferrovial, OHL, FCC y Scrinser) Barcelona, Electrical and

Electronic shift technician responsible for TBM, , EPB de Herrentnecht S-279 9,4 m

1,4 km + 1,8 km 04-06 / 12-06

UTE Canal de Navarra (Sacyr, Arian, Copisa y Cavosa) Navarra, Electrical and Electronic

installation and comprehensive maintenance of TBM, -Double Shield HR de Wirth 6,19 m

4,5 km 07/2005-04/2006

MTM (Main Team Manufacturing Proyects), Electronic Engineer programming of PLC´s ,

(Assistance and programming of PLC´s in assembly line of Volkswagen) 8/2009 - 11/2009

LOXIN 2002, Electronic Engineer programming of PLC´s , ROBOTICS 03-11-2008/29-06-2009

PEA INGENIEROS, Electrical installations proyects freelance, (Hotel Adoratrices) 05-2008 /10-08

AENA Aeropuerto de Pamplona, Technical maintenance in aeport, 03-08 / 04-08

Electricidad Palomo, Consultant in industrial electrical installations, 09-07 / 10-07

Gorelec, Technician in industrial electrical installations, ( El Corte Ingles-Pamplona) 2005

Conservial, Technician in logistics, 17-03-2003 / 17-12-2004

AIN (Asociacion de la Industria Navarra), Teacher Training of PLC

Courses of PLC´s. STEP 7 _ Level I and II) 200 Hs 1-11-2011/14-06-2012

Forma Profesional (Dicoa) Teacher Training of PLC(STEP 7_ Level I) 120 Hs 16-1-2012/19-4-2012

CENIFER, Teacher Training

(Installation and maintenance of solar termal and photovoltaic installations 180Hs) 15-2/19-4-2010

(Electronic maintenance applied to renewable energies 50 hs) 05-08 / 06-08

Iturrondo (INEM) Teacher Training of

(Basic structure of automata and applications, PLC´s OMRON ZEN, CPM1 y CJ1M)17-11-08 / 18-12-2008

(Industrial switchgear and electrical control 60 Hs) 20-10-08 / 14-11-08

IFES (UGT) Teacher Training of

(Course of Maintenance industrial electrician 250 hs) 07-05-08 /28-07-08

(Course of Basic and Advanced industrial electricity 200 hs) 10-2007 / 06-2008

Certifications LAN, WAN networks, nodes of FO and electric installations, Biek S.R.L. 2001-2002

Business Owner computation 1999-2001

Manager of Production , Confecciones Montserrat attending to production, logistic, quality, methods,

in charge of industrial planning, applying computing to production 1993 - 1999

Chief area manager of instrumental electronic facilities, Migsa S.A. 1983 - 1992

Technician field measuring instruments, Frigorífico SWIFT – ARMOUR 1982 - 1983

Technician Communications equipment repair Wama S.A. 1981 -1982

Electronic technician assembly line TV, Continental S.A. 1978 - 1981

Courses in USA. :

Electronic Field Instrumentation Taylor Instruments Company (U.S.A.) 06-1981

Field Instrumentation Project FoxBoro Company (U.S.A.) 06-1981

Courses in Argentina:

Visual Basic programming.1983

Course on Grounding and Introduction to Ground rays (ACYEDE) 1987

Design, assembly and maintainance of networks, routers’ programming and

switches in Cisco Networking Academy CCNA, Regional Academy PROYDESA 2002

Seminars of structure cabling in UTP y FO and certifications 2001

Seminars of Protocol Analyzers 2001

Seminars of Security in Computer Networks 2002

Seminar of WAN Technologies 2002

Courses in Spain:

PLC Siemens Step7 digital programming (INAFRE) 70 Hs 2002

PLC Siemens Step7 analogic programming (AIN) 60 Hs 2003

Visual Basic applied to Excel ( Instituto de Formación Iturrondo)70 Hs 2004

Work Risk Prevention _ Basic Level ( Fun. Lab. de la Construcción )60 Hs 2004

Basic Industrial Electricity (IFES)-50 Hs 2005

Advanced Industrial Electricity (IFcalculation of regulatory measures electrica (lFES)-50 Hs 2005

Electrical automation (FOREM) -60 Hs 2005

Advanced Electrical automation (FOREM) -60 Hs 2005

Assembly and maintenance of Computer Systems (Inst. de Formación-60 Hs 2005

Domotics systems (Forem) 50 Hs 2007

Calculation of regulatory measures electrical (CIP Virgen del Camino) - 30 Hs 2008

Calculation of electrical installations with software CYP (CENIFER) - 30 Hs 2008

Inverters VFD and vectorial control for trainers (CENIFER) - 60 Hs 2008

Calculation for downed lines unbalanced (CIP Virgen del Camino) – 30 Hs 2008

CNC of ABB robots series IRC5 (Loxin2002) – 40 Hs 2008

Point to point Communications S7-CP441 Vía Radio and telephony (CENIFER) 40 Hs 2009

Local area Communications Networks Ethernet S7_CP443 (CENIFER) 20 Hs 2009

Electronic, electrical maintance and control of wind turbines (CENIFER) 80 Hs 2009

Maintance and operation of MV and HV substations of wind farms (CENIFER) 48 Hs 2009

Electrical Hazard according RD b614/2001 and maneuvers cells (Tesicnor) 16 Hs 2009

Maintance Management of wind energy facilities (CENIFER) 40 Hs 2009

Management and advanced programming of PLCs S7 300 y 400 (CENIFER) 30 Hs 2010

Supervision system SCADA-WINCC (CENIFER) 40 Hs 2010

Operator and maintainer MV and HV in wind farms (speakerofSCHNEIDER)(CENIFER)60Hs 2010

Measures of physical quantities in processes (CENIFER) 20 Hs 2010

Electroneumática level I and II withcemergency stops (FOREM) – 110 Hs 2010

Electromagnetism and windings of rotating electrical machines(CIP Vgen del Camino)30 Hs 2010

Management Systems of information – ISO 27000 (Inst. de Formación Iturrondo) -ONLINE 2010

Electrical, Electronic maintance and control wind turbine for trainers (CENIFER) 60 Hs 2011

Operator and maintainer MV and HV in wind farms (speaker ACCIONA) for trainers (CENIFER) 60 Hs 2011

Design, cálculation and executión of thermal solar installations for trainers(CENIFER)- 60 Hs 2011

Automation in manufacturing mechanical Oil hydraulic (Colegio Salesianos) -100 Hs 2011

Equipment operation manual in tunnels (Fundacion Laboral de la construccion) 24 Hs 2011

Prevention of occupational hazards in tunneling work (Fundacion Lab. De la Construccion) 8 Hs 2011

CREDENTIALS: C.O.P.I.T.I. Nº 2810 (NAVARRA)

Collegiated as Technical Industry Engineer on Electronic Systems.

LANGUAGE: ENGLISH – CATALAN – ITALIANO - SPANISH

SPANISH DRIVING LICENSE: B1-C+E