STGC Agenda 01-13-2015 – Preparation for Face to Face Meeting 2/24-25/2015 Redmond
Reports:
- Lynn, Mitch, Tom B, Lars, Kevin - Basins Progress to Date Gathering Input
- Lynn – No input yet
- Mitch – Limited input so far, has had some conversations.
- Job Sheets, missing signature block.
- O&Ms additional canned statements would be helpful.
- Phone conversations have been most responsive.
- Tom B – Sent out email questionnaire, 10 responses hopes for more.
- What sources do you use for technical information and what is most helpful
FOTG, Google
- Does Tech Guide have information you need and in a form that is useful, give examples?
- Should the Tech Guide eFOTG be the primary source of technical information for OR?
- List in priority order top 3 things the STGC needs to work on or improve to make the Tech Guide a useful and relevant source of technical information.
FOTG is not up to date particularly frustrating for TSPs
- Lars – Talked to a few folks, things are outdated.
- Would like a way to flag when national Standards are updated, example: 578 Stream Crossing Natl. 2011, OR 2003
- CPA-52 not located on the eFOTG.
- How is information added to the eFOTG, can multiple people add and in various formats, Word, Adobe, Excel?
- What are the rules for adding information to the eFOTG?
- Need a comment area if they notice something is outdated.
- Expand section descriptions to clearly identify what is contained in a section.
- Notification of updates is poor ie. fencing updates, find out at random.
- Kevin – Talked to ½ Eng. staff including Travis. 4 more people to talk too.
- Best response on the phone.
- Has put together a list of Eng. standards. Comments from the engineers, is the same as other topics, outdated information.
- Statement of work, OR adoptions have not been included.
- Tom, Denise - State Office Update on draft National Standards
- Denise – WNTC recently sent notification of draft standards released for review.
- This workload will be folded into the work plan.
- When additional drafts come in they will be added to the list.
- Define process for notification, review and public comment of national standards is part of the Federal Register process. The state has a different process. eFOTG process is independent of the national and state review process.
- The national list is general, not discipline specific.
- Greg and Denise will develop the list for what needs to be reviewed for EcoSci.
- Evelyn - FOTG Structure, Components, Posting Current Information, FO Notification of changes and Disability Requirements.
- Evelyn – Researching other states eFOTG for logical organization, information, structure and technical edge.
- Denise – Bob Gillaspy is the primary person entering and removing information from the eFOTG.
- 508 Compliance – make information on the eFOTG accessible to people with disabilities. Explains document so that it is disability friendly. It is required.
- Specialist puts updates in a folder to upload to the eFOTG . Conversion to 508 compliance takes time so a bottleneck developed with updated information sitting in the folder waiting on 508 compliant conversion.
- Word documents are posted in advance to get the information posted and available for use prior to meeting 508 compliance requirements. Word is not 508 compliant. 508 takes 2-3 days to complete.
- Greg – Report on Practice Standards Revision Workload and Schedule Development
- Greg is working with Denise to develop a draft for the Face to Face meeting, may solicit input from the group.
- Draft Agenda Face to Face Meeting:
- Summary of FOTG Guiding Policies and Responsibilities
- Clear understanding of the Committee Responsibilities
- Focused and successful in accomplishing the most important items.
- Review Input from Basins for field office needs and improving the FOTG
Snake and John Day/Umatilla- Lynn
North Coast and Lower Willamette Basins- Mitch
Southwest and Upper Willamette Basins - Tom B.
Deschutes and High Desert Basins- Lars
Engineers from around the state- Kevin
- State Office - National priorities for reviewing Standards and updating eFOTG - Tom/Denise
- Examples: Other States successful FOTG organization and products- Evelyn
- Review Draft FY 2015 Work Plan for the Practice Standard and Specification Subcommittee- Greg/Denise
- Prepare Draft FY2015 STGC Work Plan.
- Roles and Responsibilities
- Timeline for implementation
Action: 1. Greg / Denise - Develop a draft Work Plan Outline and list of National Standards for review.
Discipline Leads - Continue to gather input from the field and send to Evelyn by Feb. 18, 2015.
Evelyn - Consolidate eFOTG research for improving structure, components, organization, access.