District 10 Regional Projects for 2006
District Guardrail Rebuilding SFY 2006-2007(PID-78412)
Rebuilding of guardrail as needed throughout the district.
Cost: $292,600
Contractor: PDK Construction
Awarded: July 2005
Scheduled Completion: June 2007
District 10 Raised Pavement Markers (RPM) (PID-24919)
Includes replacements on various routes\ sections throughout the district.
Cost:$258,307
Contractor: Traffic Specialists, Inc.
Awarded: April 2006
Scheduled Completion: July 2006
District 10 Fence FY 2007 (PID-78070)
Construction and replacement of limited access fence parallel to priority routes at various locations throughout the district.
Estimated Cost: $250,000
Award Date: October 2006
Scheduled Completion: November 2007
District 10 Herbicidal Spraying FY 2006 (PID-24914)
Herbicidal spraying on various routes\ sections in the district.
Estimated Cost: $72,910
Contractor: Deangelo Brothers, Inc.
Award Date: February 2006
Scheduled Completion: June 2006
District 10 MOW FY 2006-2007 (PID-24916)
2 year mowing contract on various routes\ sections throughout the district.
Cost: $130,359
Contractor: Tom Mayle & Sons
Awarded: February 2006
Scheduled Completion: May 2007
District 10 Sign FY2006(PID-24932)
Replacement of signs on various routes\ sections.
Cost: $238,206
Contractor: PDK Construction
Awarded: February 2006
Scheduled Completion: June 2006
District 10 Pavement Marking FY 2006 (PID-24918)
Striping and other pavement marking on various routes\ sections.
Cost: $1.85 million
Contractor: Mar-king, Inc.
Awarded: June 2006
Completion: October 2006
District 10 Carryover Projects
ATH-7-2.52; ATH-50-35.9 (PID-77378)
Concrete bridge deck overlay beginning 0.34 miles south of U.S. 50.
Cost: $438,323
Contractor:5-D Construction
Awarded: September 2005
Scheduled completion: July 2006
GAL-CR13-1.35 (PID-16469)
Bridge replacement project. Work includes constructing 1300 ft. of new roadway on a new alignment.
Cost: $860,265
Contractor: Dial Construction Company
Awarded: November 2005
Scheduled Completion: September 2006
HOC-664-18.92 (PID-75267)
Culvert replacement project located 1.77 miles south of CR 32.
Cost: $243,183
Contractor: Parker Corporation
Awarded: December 2005
Scheduled completion: September 2006
HOC-664-15.04 (PID-22081)
FallsMillBridge replacement located in Logan.
Cost: $5.2 million
Contractor: Complete General
Awarded: March 2005
Scheduled completion: November 2006
MEG-33-15.70 (PID-19714)
Replacement of the Pomeroy-MasonBridge over the Ohio River.
Cost: $60 million
Contractor: C. J. Mahan Construction \ National Engineering
Awarded: February 2003
Scheduled Completion: June 2006
MOE-26-13.02 (PID-24017)
Bridge replacement over Crane Nest Fork.
Cost: $216,415
Contractor: Parker Corporation
Awarded: December 2005
Scheduled completion: July 2006
MOE-145-15.36 (PID-24826)
Two-lane resurfacing project. MOE-145 15.36 to 21.41 and NOB-78-7.00 to 21.35.
Cost: $2.26 million
Contractor: Shelly and Sands, Inc.
Awarded: December 2005
Scheduled Completion: July 2006
District 10 Carryover Projects, con’t
MOE-536-0.64 (PID-76139)
Two-lane resurfacing project. MOE-536-0.64 to 12.58.
Cost: $1.05 million
Contractor: Shelly and Sands, Inc.
Awarded: December 2005
Scheduled Completion: June 2006
MRG-78-25.48 (PID-79500) – ER
Emergency slide repair.
Cost: $109,086
Contractor: Parker Corporation
Awarded: December 2005
Scheduled completion: June 2006
MRG-83-0.00 (PID-24823)
Two-lane resurfacing project. MRG-83-0.00 to 7.48; MRG-266-0.00 to 4.47; and WAS-266-0.00 to 2.02.
Cost: $1.12 million
Contractor: Shelly & Sands, Inc.
Awarded: September 2005
Scheduled completion: June 2006
NOB-821-0.00 (PID-24825)
Two-lane resurfacing project. NOB-821-0.00 to 7.5, 12.23 to 12.81, and WAS-821-11.59 to 20.78.
Cost: $1.64 million
Contractor: Shelly & Sands, Inc.
Awarded: September 2005
Scheduled completion:September 2006
VIN-328-7.41 (PID-21863)
Bridge replacement project. Includes VIN-328-9.41.
Cost: $838,757
Contractor: DMG, Inc.
Awarded: November 2005
Scheduled Completion: October 2006
WAS-CR9-20.42 (PID-75192)
Base pavement reconstruction and guardrail project. Improve the pavement base by placing bituminous aggregate base, seal coating surface and installing guardrail.
Cost: $450,434
Contractor: Shelly and Sands, Inc.
Awarded: December 2005
Scheduled Completion: June 2006
WAS-26-16.40 (PID-79351) – ER
Emergency repair with drilled shafts.
Cost: $781,346
Contractor: Shelly & Sands, Inc.
Awarded: December 2005
Scheduled completion: July 2006
District 10 Carryover Projects (con’t)
WAS-77-6.59 (PID-76160)
Four-lane major rehabilitation project.
Cost: $20.1 million
Contractor: Shelly and Sands, Inc.
Awarded: February 2005
Scheduled Completion: June 2007
WAS-50-4.40 (PID-23565)
Roadway portion for Corridor D (US50) from WV to OH. Work includes suspension bridge approaches (Ohio side only) and all related interchange work.
Cost: $21.4 million
Contractor: Kokosing Construction Company
Awarded: April 2005
Scheduled Completion: September 2007
AthensCounty (Regularly Scheduled Projects)
ATH-13-0.29 (PID-79835)
Preventive maintenance resurfacing project for SR 13 0.29 to 8.51.
Cost: $162,827
Contractor: Municipal Construction, Inc.
Awarded: March 2006
Scheduled completion: August 2006
ATH-US33-12.45 (PID-25089)
Concrete bridge deck overlay project on six bridges.
Cost: $2.07 million
Contractor: Double Z Construction
Awarded: April 2006
Scheduled completion: October 2006
ATH-US33-12.79 (PID-76146)
Four-lane concrete pavement project. Concrete pavement replacement for ATH 33 12.79-13.09 Concrete pavement/joint repair for various routes and sections.
Cost: $1.56 million
Contractor: Shelly & Sands, Inc.
Awarded: September 2006
Scheduled completion: September 2007
ATH-US33-15.37 (PID-76264)
Bridge repair project. Work includes resetting rockers, repairing expansion joints and approach work.
Cost: $730,972
Contractor: Tri Span Corporation
Awarded: January 2006
Scheduled completion: October 2006
ATH-US33-18.32 (PID-77853)
Resurfacing, programmed as a LPA project in the City of Athens.Completion determined by the city and contractor.
Cost: $606,895
Contractor: Shelly & Sands, Inc.
Awarded: February 2006
ATH-56-11.00 (PID-78789)
Intersection widening and realignment at junction of SR 56 and SR 682.Completion to be determined by the city and contractor.
Cost: $696,495
Contractor: Shelly & Sands, Inc.
Awarded: April 2006
ATH-329-18.15 (PID-25083)
Bridge superstructure replacement project.
Estimated Cost: $249,700
Contractor: Tom Mayle and Sons Construction
Awarded: July 2006
Scheduled completion: August 2006
AthensCounty Emergency Projects (Unplanned)
ATH-US50-6.33 (PID-78704)
Emergency slip repair, work includes constructing wall and reworking backslope.
Cost: $1.03 million
Contractor: Shelly & Sands, Inc.
Awarded: February 2006
Scheduled completion: August 2006
ATH-78-0.90 (PID-79800)
Emergency slip repair, work includes earthwork and dump rock fill.
Cost: $149,928
Contractor: Alan Stone Construction
Awarded: July 2006
Scheduled completion: November 2006
ATH-144-5.66 (PID 80039)
Emergency slip repair using drilled shafts; includes sites Athens144-5.66 and 5.87.
Cost: $1.8 million
Contractor: Shelly & Sands, Inc.
Awarded:January 2006
Scheduled completion:May 2006
ATH-144-12.97 (PID-80040)
Emergency slip repair, work includes using drilled shafts. Sites are ATH-144-1297 and 13.02.
Cost: $634,889
Contractor: Shelly & Sands, Inc.
Awarded: February 2006
Scheduled completion: June 2006
ATH-144-Roadway relocation, two phases (PIDs-79118 and 79871)
Relocation of ATH-144 onto CR 59 due to January 2005 low pool effect of the Ohio River; includes construction of a new bridge over the Hocking River.
Estimated Cost: $12 million
Contractors: CJ Mahan and Beaver Excavating
Construction start: February 13, 2006
Estimated completion: December 2006
GalliaCounty (Regularly Scheduled Projects)
GAL-CR12-2.42-(PID-9526)
Bridge replacement: 226 ft bridge over Raccoon Creek, Paving of approaches and other necessary incidentals.
Estimated Cost: $1.02 million
To be awarded: December 2006
GAL-Guardrail FY 2007 (PID-78879)
Guardrail project on various routes\ sections in GalliaCounty. CEAO funded.
Cost: $257,000
Contractor:Lake Erie Construction
Awarded: September 2006
Scheduled completion: June 2007
GAL-7-25.90 (PID-76480)
Safety project for GAL-7-25.90 to 26.82. Work includes adding a turn lane, realign driveway and upgrading of signal.
Cost: $565,120
Contractor: Shelly Company
Awarded: January 2006
Scheduled completion: November 2006
GalliaCounty Emergency Projects (Unplanned)
GAL-7-18.40 (PID-78662)
Emergency slip repair, work includes using drilled shafts. Geotech required. Site is GAL-7-18.70. Includes non-ER, GSM landslide site at GAL-7-18.40.
Cost: $1.68 million
Contractor: RC Construction Company
Awarded: May 2006
Scheduled completion: September 2006
Hocking County (Regularly Scheduled Projects)
HOC-93-0.00 (PID-76140)
Two-lane resurfacing project. HOC-93-0.00 to 7.31. Includes some Major 2 funding.
Cost: $835,335
Contractor: Shelly & Sands, Inc.
Awarded: January 2006
Scheduled completion: June 2006
HOC-327-0.00 (PID-79839)
Preventive maintenance resurfacing project. Apply polymer seal coat on
HOC-327-0.00 to 3.80 and VIN-327-6.89 to 13.56. Also apply seal coat to
R-25, R-26 and R-32(Logan Hollow) in TarHollowState Park.
Cost: $187,534
Contractor: Shelly Company
Awarded: January 2006
Scheduled completion: August 2006
HOC-327-1.01 (PID-25093)
Bridge replacement project. Includes HOC-327-1.62.
Estimated Cost: $910,000
To be awarded: December 2006
HOC-328-1.75 (PID-24803)
Two-lane resurfacing project. HOC-328-1.75 to 11.63
Cost: $1.2 million
Contractor: Shelly & Sands, Inc.
Awarded: April 2006
Scheduled completion: July 2006
HOC-374-17.94 (PID-78396)
Two-lane resurfacing project. HOC-374-17.94 to 25.33. Includes VIN-50-4.98 to 10.64.
Cost: $1.6 million
Contractor: Shelly Company
Awarded: July 2006
Scheduled completion: June 2007
MeigsCounty (Regularly Scheduled Projects)
MEG-CR1-(Pav. Mark) (PID-75197)
Pavement marking project on various roads in MeigsCounty. Work includes centerline and edgeline striping, stopbars and railroad crossings.
Estimated Cost: $100,000
To be awarded: October 2006
MEG-CR24-0.00 (Union Avenue) (PID-75200)
Two-lane resurfacing project on MEG-CR24-0.00 to 0.66. Work includes an asphalt overlay, striping and berm conditioning.
Estimated Cost: $100,000
To be awarded: December 2006
MEG-Racine sidewalk (PID-78876)
Replace 600 linear feet of sidewalk, including a closed drainage system along State Route 124 in the Village of Racine.TEA funded project.
Cost: $54,500
Contractor: Parker Corporation
Awarded: August 2006
Scheduled completion: October 2006
MEG-US33-5.69 (PID-77379)
Concrete deck overlay using micro-silica concrete. MEG-33-5.69. Also includes GAL-233-3.76 and MEG-33-5.69.
Cost: $232,689
Contractor: BCC Ohio
Awarded: October 2006
Scheduled completion: July 2007
MEG-US33-9.40(PID-75812)
Reconstruct interchange with SR 7, just north of PomeroyVillage. Work includes four-lane resurfacing using mill and fill process on MEG-7-6.19 to 8.88 and MEG-33-9.95 to 10.29 for preventive maintenance.
Cost: $7.6 million
Contractor: Beaver Excavating
Awarded: April 2006
Scheduled completion: June 2007
MEG-681-9.58 (PID-24819)
Two-lane resurfacing project on MEG-681-9.58 to 21.24.
Cost: $978,944
Contractor: Shelly Company
Awarded: February 2006
Scheduled completion:August 2006
MEG-692-0.55 (PID-25276)
Bridge replacement project
Cost: $201,808
Contractor: Parker Corporation
Awarded: October 2006
Scheduled completion: August 2007
MeigsCounty (Regularly Scheduled Projects), con’t
MEG-833-0.30 (PID-80752)
Two-lane resurfacing project using mill and fill process.Will incorporate nighttime work to minimize impacts to traffic. MEG-833-0.30 to 2.75.
Cost: $437,313
Contractor: Shelly Company
Awarded: June 2006
Scheduled completion: October 2006
MeigsCounty Emergency Projects (Unplanned)
MEG-124-43.60 (PID-79504)
Emergency slip repair, work includes using drilled shafts. Sites are MEG-124-43.60 and 43.80.
Cost: $1.8 million
Contractor: Shelly & Sands, Inc.
Awarded: July 2006
Scheduled completion: September 2006
MEG-124-53.15 (PID-79805)
Emergency slip repair, work includes using drilled shafts. Site is MEG-124-53.15 to53.85.
Cost: $868,698
Contractor: Shelly & Sands, Inc.
Awarded: March 2006
Scheduled completion: July 2006
MonroeCounty (Regularly Scheduled Projects)
MOE-7-3.42 (PID-25080)
Bridge replacement project on MOE-7-3.42 and MOE-7-4.34.
Cost: $592,000
Contractor: Parker Corp.
Awarded: September 2006
Scheduled completion: October 2007
MOE-7-25.24 (PID-24852)
Two-lane resurfacing project on MOE-7-25.24 to 28.55. Also includes MOE-145-22.06 to 25.80.
Cost: $1.2 million
Contractor: Shelly Company
Awarded: July 2006
Scheduled completion: June 2007
MonroeCounty Emergency Projects (Unplanned)
MOE-78-4.96 (PID-79343)
Emergency slip repair, work includes using drilled shafts. Site is MOE-78-4.96.
Cost: $38,300
Contractor: Parker Corporation
Awarded: June 2006
Scheduled completion: August 2006
MOE-78-7.70 (PID-77690)
Emergency slip repair that includes the relocation of a portion of this route.
Cost: $2.86 million
Contractor: Shelly & Sands, Inc.
Awarded: May 2006
Scheduled completion: June 2007
MOE-78-20.15 (PID-79342)
Emergency slip repair, work includes using drilled shafts. Site is MOE-78-20.15.
Cost: $183,117
Contractor: Gary Rubel
Awarded: February 2006
Scheduled completion: April 2006
MOE-255-9.95 (PID-79345)
Emergency slip repair, work includes using drilled shafts. Site is MOE-255-9.95.
Cost: $102,128
Contractor: Alan Stone Company
Awarded: June 2006
Scheduled completion: November 2006
MOE-556-9.90 (PID-79524)
Emergency slip repair, work includes using dig out and dump rock fill. Site is MOE-556-9.90.
Cost: $47,392
Contractor: Parker Corporation
Awarded: October 2006
Scheduled completion: December 2006
MorganCounty (Regularly Scheduled Projects)
MRG-Woodyard Dam Elimination (PID-80842)
Remove Woodyard Dam in MorganCounty. Project is associated with PID 75812 (MEG-US33-9.40) Located on the west branch of WolfCreek, 1000 ft. from SR 377.
Cost: $30,300
Contractor: Parker Corp.
Awarded: June 2006
Scheduled completion: August 2006
MRG-78-31.30 (PID-79837)
Preventive maintenance resurfacing project. Single micro-surfacing application on MRG-78-31.30 to 37.35.
Cost: $153,074
Contractor: Strawser, Inc.
Awarded: January 2006
Scheduled completion: August 2006
MRG-555-13.35 (PID-79970)
Two-lane resurfacing project on MRG-555-13.35 to 22.96. Also includes PER-555-0.00 to 0.33.
Cost: $934,385
Contractor: Shelly & Sands
Awarded: July 2006
Scheduled completion: June 2007
MorganCounty Emergency Projects (Unplanned)
MRG-78-4.71 (PID-79525)
Emergency slip repair, work includes earthwork and dump rock fill.
Estimated Cost: $122,000
To be awarded: October 2006
MRG-376-1.10 (PID-79336)
Emergency slip repair, work includes using drilled shafts.
Cost: $387,856
Contractor: R.C. Construction Company
Awarded: March 2006
Scheduled completion: June 2006
MRG-376-11.36 (PID-78566)
Culvert reconstruction. Work includes new culvert,sluff removal, shoulder replacement, rock channel protection and rock slope back to grade.
Cost: $184,000
Contractor: Maiden and Jenkins Construction
Awarded: September 2006
Scheduled completion: December 2006
NobleCounty (Regularly Scheduled Projects)
NOB-78-7.39 (PID-21884)
Bridge deck rehabilitation project
Cost: $460,000
Contractor: Maiden and Jenkins
Awarded: May 2006
Scheduled completion: October 2006
NOB-146-9.51 (PID-24822)
Asphalt resurfacing project. NOB-146-9.51 to 18.70.
Cost: $1.07 million
Contractor: Shelly and Sands
Awarded: June 2006
Scheduled completion: September 2006
NOB-260-3.73 (PID-79838)
Preventive maintenance resurfacing project. Single chip seal application on
NOB-260-3.73 to 12.11.
Cost: $163,067
Contractor: Shelly Company
Awarded: March 2006
Scheduled completion: August 2006
NOB-565-0.02 (PID-25147)
Bridge deck replacement project.
Cost: $271,000
Contractor: Maiden and Jenkins
Awarded: August 2006
Scheduled completion: September 2007
Noble CountyEmergency Projects (Unplanned)
NOB-147-16.19 (PID-78930)
Emergency slip repair
Cost: $204,000
Contractor: Maiden and Jenkins Construction
Awarded: January 2006
Scheduled completion: May 2006
NOB-147-20.80 (PID-79643)
Emergency slip repair
Cost: $305,966
Contractor: Ohio-West Virginia Excavating Company
Awarded: October 2006
Scheduled completion: June 2007
NOB-215-2.27 (PID-79829)
Emergency slip repair. Work includes dig out and bench back.
Estimated Cost: $188,000
To be awarded: December 2006
NOB-821-0.83 (PID-78970)
Emergency slip repair. NOB-821-0.83 to 0.90.
Cost: $81,564
Contractor: R.C. Construction Company
Awarded: April 2006
Scheduled completion: July 2006
VintonCounty (Regularly Scheduled Projects)
VIN-US50-0.10 (PID-76229)
Landslide repair at three locations.VIN-50-0.10 to 0.14, VIN-50-0.30 to 0.36 and VIN-50-0.80 to 0.84.
Cost: $581,724
Contractor: RC Construction
Awarded: July 2006
Scheduled completion: June 2007
VIN-93-0.74 (PID-80796)
Culvert replacement project in conjunction with astorm sewer upgrade in the Village of Hamden. Site is VIN-93-0.74 to 0.76. Sell as Type A Emergency, Non-ER Project.
Cost: $166,400
Contractor: Glen James and Sons
Awarded: October 2006
Scheduled completion: November 2006
Washington County (Regularly Scheduled Projects)
WAS-CR25-1.15 (PID-75191)
Two-lane resurfacing project with pavement markings. WAS-CR25-1.15 to 7.72.
Completion to be determined by county and contractor.
Cost: $407,292
Contractor: Shelly and Sands
Awarded: June 2006
WAS-CR406-0.01 RinardCovered Bridge (PID-78900)
Historic bridge reconstruction following flood damage from Sept. 2004 flood event. Completion to be determined by county and contractor.
Cost: $574,987
Contractor: The Righter Company, Inc.
Awarded: May 2006
WAS-CR60-5.06 (PID-76225)
Two-lane resurfacing project which includes LowellBridge(paving only). WAS-CR60-5.06 to 6.39. Completion to be determined by county and contractor.
Cost: $112,474
Contractor: Shelly and Sands
Awarded: June2006
WAS-CR804-0.00 Warrior Drive Sidewalk (PID-78874)
Construct 4500 linear ft. of sidewalk along CR 804 (Warrior Drive) from SR 339 to SR 550. TEA funded project. Completion to be determined by the county and the contractor.
Cost: $135,460
Contractor: Shelly & Sands, Inc.
Awarded: April 2006
WAS-TR570-0.15 ShinnCovered Bridge(PID-80414)
Repair of ShinnCovered Bridge. SFN 8437017 Completion to be determined by county and contractor.
Cost: $188,597
Contractor: The Righter Company
Awarded: July 2006
WAS-SR7-Scenic Overlook (PID-77452)
Rehabilitate the Scenic Overlook SR 7 south of Marietta Corp. limit. Work includes placing aesthetic walls, sidewalk and resurfacing the parking lot.
Cost: $201,787
Contractor: Parker Corp.
Awarded: September 2006
Scheduled completion: June 2007
WAS-7-47.90 (PID-76232)
Landslide repair project. Length of repair area is 1200 linear ft.
Cost: $1.14 million
Contractor: Shelly and Sands, Inc.
Awarded: April 2006
Scheduled completion: August 2006
WashingtonCounty (Regularly Scheduled Projects, con’t)
WAS-60-1.73 (PID-79098)
Two-lane resurfacing project.WAS-60-1.73 to 2.63. Work includes mill\fill with asphalt and pavement marking. Completion determined by city and contractor.
Cost: $333,582
Contractor: Shelly and Sands, Inc.
Awarded: July 2006
WAS-60-4.84 (PID-24911)
Culvert replacement project.
Cost: $382,638
Contractor: Alan Stone Company
Awarded: July 2006
Scheduled completion: October 2006
WAS-60-22.05 (PID-25088)
Superstructure replacement project. Begin 0.32 miles south of SR 83.
Cost: $157,996
Contractor: Tom Mayle and Sons
Awarded: September 2006
Scheduled completion: October 2007
WAS-260-3.40 (PID-25081)
Bridge replacement project.
Cost: $167,775
Contractor: Parker Corporation
Awarded:April 2006
Scheduled completion: August 2006
WAS-339-18.60 (PID-79836)
Preventive maintenance resurfacing project. Fine graded polymer asphalt Type B application for WAS-339-18.60 to 20.44 and WAS-339-20.61 to 24.81.
Cost: $291,744
Contractor: Shelly & Sands, Inc.
Awarded: March 2006
Scheduled completion: August 2006
WAS-530-0.00 (PID-24849)
Two-lane Resurfacing Project. WAS-530-0.00 to 7.95. Also includes WAS-821-2.28 to 3.42.
Cost: $922,633
Contractor: Shelly and Sands. Inc.
Awarded: June 2006
Scheduled completion: June 2007
WAS-550-18.72 (PID-76233)
Landslide repair project. WAS-550-18.72 to 18.99
Cost: $1.1 million
Contractor: Stonegate Construction
Awarded: May 2006
Scheduled completion: October 2006
WashingtonCounty Emergency Projects (Unplanned)
WAS-7-11.57 (PID-79720)
Emergency slip repair, work includes dig out and dump rock fill.
Cost: $252,505
Contractor: RC Construction
Awarded: April 2006
Scheduled completion: August 2006
WAS-7-33.92 (PID-79483)
Drainage improvement project. Clean out culverts. Sites include WAS-7-33.92 and WAS-7-48.60.
Cost: $51,422
Contractor: Alan Stone Company
Awarded: May 2006
Scheduled completion: October 2006
WAS-26-14.16 (PID-79328)
Emergency slip repair using dump rock fill.
Cost: $51,916
Contractor: Alan Stone Company
Awarded: May 2006
Scheduled completion: July 2006
WAS-26-17.05 (PID-80338)
Emergency slip repair using drilled shafts.
Cost: $51,000
Contractor: Alan Stone Company
Award Date: June 2006
Scheduled completion: August 2006
WAS-550-17.50 (PID-79479)
Emergency slip repair using dump rock fill. Sites are WAS-550-17.50, 17.61, 17.70 and 17.77.
Cost: $111,261
Contractor: R.C. Construction, Inc.
Awarded: March 2006
Scheduled completion: July 2006
1