USF Campus Edge Enhancement Phase IIUSF Project 370
PROPOSAL COST FORM
The following Vendor, ______, submits a Proposal for the USF Campus Edge Enhancement Phase II Project and acknowledges and affirms this quote complies with the informationoutlined in ITN-MH-17-01.
The following forms are attached to this Proposal Cost Form:
Invitation to Negotiate cover Page (Signed)
Submittal Requirements Documentation
- Qualifications – Experience
- Qualifications – Similar Projects
- Qualifications – Resumes
- Ability – Plan to meet Project Requirements
- Ability – Plan to implement Project
- Proposal – Executive Summary
- Proposal – Description of Services
- Proposal Cost Form (this form)
- Proposed Schedule
Minority Vendor and P-Card Certification
Certificate of non-Segregated Facilities
Bidder’s Affirmation
Small, minority or Woman Owned Business Form
Purchase Order Payment Preference
All issued Addendums to this ITN (Signed)
We hereby propose to provide the services required to provide a full and complete Project, including but not limited to all necessary site investigation, surveying, design and engineering, permitting, construction and project close-out.
$______= Total Base Bid
Breakdown of Bid:
$______= Surveying.
$______= Professional Design & Engineering.
$______= Permitting.
$______= Construction – Section C1 (Bruce B. Downs).
$______= Construction – Sections C2-6 (stopping at Leroy Collins Blvd = Fowler Ave – west).
$______= Construction – Sections C6-10 (starting at Leroy Collins Blvd = Fowler Ave - East).
$______= Construction – Sections C11-16 (50th Street).
$______= Construction – Sections C17-19 (Fletcher – west of Palm Dr.).
$______= Construction – Sections C19-22. (Fletcher – east of Palm Dr.).
$______= Project Close-out.
$______= General Conditions.
$______= Overhead & Profit.
$_____125,000.00______= Contingency.
$______10,000.00______= Testing Allowance.
$______= Other Costs (______).
Unit Prices:
$______= Cost to ADD one Brick Pier (Site Prep, Testing, Foundation, CMU, Brick, Cap, etc.).
$______= Cost to DELETE one Brick Pier (Site Prep, Testing, Foundation, CMU, Brick, Cap, etc.).
$______= Cost to ADD one panel of typical fencing panel and (1) additional post (Site Prep, Testing, Foundation, Post, Fencing, attachments, etc.).
$______= Cost to DELETE one panel of typical fencing panel and (1) post (Site Prep, Testing, Foundation, Post, Fencing, attachments, etc.).
$______= Cost to ADD one panel of “Bull U” fencing panel and (1) additional post (Site Prep, Testing, Foundation, Post, Fencing, attachments, etc.).
$______= Cost to DELETE one panel of “Bull U” fencing panel and (1) post (Site Prep, Testing, Foundation, Post, Fencing, attachments, etc.).
$______= Cost to ADD one man-gate and a 10’ long section of sidewalk (6” thick x 6’ wide). Man gate shall match the gate installed during Phase I at Fletcher near Bruce B. Downs. Include additional post(s) and foundations required and delete portion of typical fence section.